GENERATION DATA

Date : 2 May' 21
STEAM GENERATION POWER GENERA

A UNIT # 1 Steam Gen (MT)Avg (TPH)

1 CFBC # 1 3781 157.54 Import

2 CFBC # 2 0 0.00 Export

3 WHRB # 5 747 31.13


4 WHRB # 6 862 35.92
3 x 130 MW
5 WHRB # 9 850 35.42
6 WHRB # 1 809 33.71 Unit # 1
Unit # 2

B UNIT # 2 Steam Gen (MT) Unit # 3

1 CFBC # 3 4503 187.63 Total

2 CFBC # 4 3931 163.79 100 MW


3 WHRB # 7 850 35.42 40 MW

4 WHRB # 8 798 33.25 60 MW

5 WHRB # 1 0 0.00 Total

6 WHRB # 1 0 0.00 2 x 8 MW
Unit # 1

C UNIT # 3 Steam Gen (MT) Unit # 2

1 CFBC # 5 7420 309.17 Total


2 CFBC # 6 7042 293.42 Gross Total

Total Steam Gen (CFBC) 26677


E 40MW Steam Gen (MT) T.G. Ste
1 AFBC # 1 1497 62.38 UNITS
2 WHRB # 1 826 34.42 40 MW
3 WHRB # 2 706 29.42 60 MW
130MW (U#1)
F 60MW Steam Gen (MT) 130MW (U#2)
1 AFBC # 2 2183 90.96 130MW (U#3)
2 WHRB # 3 766 31.92 (2 X 8) T.G.-1
3 WHRB # 4 799 33.29 (2 X 8) T.G.-2
Total Steam Gen (AFBC) 3680 COAL STOCK -
Total Steam Gen 6777
G 2x8MW Steam Gen (MT) Note:-
1 WHRB # 1 377 15.71 Power costing is available
2 WHRB # 2 368 15.33
3 WHRB # 3 409 17.04
4 WHRB # 4 363 15.13
Total Steam Gen 1517 15.80
ENERATION DATA (ON DATE)

POWER GENERATION Total Coal & HSD


Spec. Coal
(Kwh) Avg(Mwh) Coal Cons(MT) Cons
(Ton/Stm)
494000 20.58 3x130MW 6385 0.24
466000 19.42 100MW 1083 0.29

Steam Distribution of 2x8MW


Pow. Gen (Kwh) Avg(Mwh) Steam Cons TG-U#1
2553000 106.38 Steam Cons TG-U#2
2827000 117.79
2773000 115.54
From 2x8MW to
8153000 339.71 (CRM +LPG YARD)+ (BF#2 + BF
Pow. Gen (Kwh) Avg(Mwh)
Chiller+Coke Oven#2+Byproduct Area)

0 0.00
1033000 43.04
1033000 43.04 Steam Distribution of 100MW
Pow. Gen (Kwh) Avg(Mwh) Steam Cons TG-40MW
79400 3.31 Steam Cons TG-60MW
0 0.00
From 100MW to
79400 3.31 (SMS-I+SMS-II+BF#1 Process+TB#1 +
Deaerator & Ejector )
9265400 386

T.G. Steam Cons.


Sp. Stm Cons
Steam Cons(MT) (Ton/Stm)
0 0.00
4443 4.30
9319 3.65
10945 3.87
10257 3.70
547 6.89
0 0.00
L STOCK - MT
wer costing is available with costing department ( Mr. Rakesh Chandra )
HSD

HSD Cons(KL)

0
0

Ton
547
0

970

Ton
0
4443

2334
Unit Unit-1 Unit-2 Unit-3 60 MW 40 MW 8MW-1
Hourly Actual Generation MW 106.38 117.79 115.54 43.04 S/D 3.31
Planned Generation MWh 2640 2880 2808 1440 120
Actual Generation MWh 2553.00 2827.00 2773.00 1033 S/D 79.40
Generation MU 2.55 2.83 2.77 1.03 0.08
PLF % 81.83 90.61 88.88 71.74 S/D 41.35
APC MW 247.33 372.18 455.35 132.31 39.33 39.64
APC % 9.69 13.17 16.42 12.81
Availability % 100.00 100.00 100.00 100.00 0.00 100.00
Coal Consumption Ton 6385 1083 N/A
DM water consumption M3 2103 2155
Steam Generation TPH 26677 6777 1517
Steam Export TPH 0 2305 1083
Clarified water consumption m3 35005 2818
Turbine Heatrate Kcal/KWh 2327.25 2360.06 2356.74 2755 S/D
Total Export MW Per hour 19.42
Total Import MW Per hour 20.58
Specific Steam consumption 3.65 3.87 3.7 4.3 S/D 3.89
Coal to Power ratio 0.78 1.05
No of heat
8MW-2 Station
S/D 386.06
9888
S/D 9265.40
9.27
S/D 76.30
S/D 1286.14
13.88
0.00 90.51
S/D 7468
4258
1517 34971
1083 3388
37823
S/D 2449.78
466
494
3.88
0.81
72