GENERAL NOTES

PLANT
NORTH

1680 THIS DRAWING


TRUE
NORTH
35,08
5427
°

SECONDARY
TEMPORARY
CONSTRUCTION AREA GATE 6 WIND (19)

300 200 680 200 300 GATE 5


HOLD

METERING
0M

8110-EP32
PRIMARY
WIND (28)

A 8110-EP32 A GATE 1

PROCESS COLD COMPRESSORS


EL +10 M

WASTE WATER TREATMENT


FUTURE UNITS

PROCESS CGC
(MTBE BUT 1) GATE 2
EL +7 M

0C - COMMON AREA

2D

SUB-STATION E & FAR 1


5W

2E

COOLING WATER UNIT


150

5T

0S
UTILITIES
5U

COOLING WATER UNIT


0P MAIN PIPE RACK

5T
1B
8110-H94 8110-H96 8110-H94

SUB-STATION C & FAR 2

FURNACES UTILITIES
450
470

BUTADIENE

FURNACES
PROCESS
PROCESS

QUENCH
2C

2B
3S

3A

2A

1A
8110-P158 8110-P158

300
GATE 4 GATE 3
EL +6 M EL +6 M

OLEFINS PLANT BASE ACCESS "A"


EL +6 M ABS.

POINT

8110-EP31 4*D24 8110-EP31 4*D24 KEY PLAN


B B
VENDOR DOCUMENT REVIEW

20

20
100 200 100 100 200 100 Long Son Petrochemicals Co., Ltd 1 REVISE AND RESUBMIT
E&C
2 TO BE ISSUED AS FINAL PROVIDED
400 PROJ.: PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TOÅ HÔÏP HOÙA DAÀU MIEÀN NAM VIEÄT NAM
COMMENTS ARE INCORPORATED

3 NO COMMENT - FINAL ISSUE


CLIENT: Long Son Petrochemicals Co., Ltd

MATERIAL REQUISITION No. 4 FOR INFORMATION ONLY (INTERNAL USE)

8110-P158 8110-H94 036909C MR 18 0 0 - 0 0 3

8110-H94 ITEM: 10-IS-5W01-8 U.O.: TPSK Consortium


8110-H96 SR Doc. CODE: 2A2001
8110-P158
25

25

25
PURCHASE ORDER N.: PO-TPSK-HGEC-001 BY: DATE:
150

150

150
25

25

25
8110-EP32 8110-EP32

SECTION A

50 50 200 50 50 1000-STC-1890-0001 CONSTRUCTION STANDARDS FOR STEEL


50 50 200 50 50
OL1-2K21-0001_REV.1 STRUCTURES
50 50

50 50
4*D24 4*D24 105W-DW-1844-0004-002 STEEL RAILING FOR PROTECTION OF BASIN
105W-DW-1844-0004-002rev2 10--PIT-5620 SECTION

STEEL RAILING FOR PROTECTION OF


8110-P158 105W-DW-1844-0004 - 001
BASIN 10--PIT-5620 PLAN
105W-DW-1844-0004-001rev2
400
200

200
400
8110-P158 Drawing No DESCRIPTION

REFERENCE DRAWINGS
50 50

50 50
8110-EP31

8110-EP31

SECTION B
00 08.03.2021

REV DD/MM/YY DESCRIPTION PREP CKD APPR/AUTH

PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM


TOÅ HÔÏP HOÙA DAÀU MIEÀN NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

FIELD BOLTS COLUMN


143.31 2.76
2 8110-EP31 PL20*400x400 25.12 50.24 0.70 A36 DWG Class: 2 EQUIP No/TAG No: 10-IS-5W01-8
2 8110-EP32 PL10*200x200 3.14 6.28 0.18 A36
2 8110-H94
Scale HG-ENC Drawing No Page Rev.
H150*150*7*10x300 9.21 18.42 0.55 A36
ONE - IS-5622-CL1
Tekla structures

1 8110-H96 H150*150*7*10x680 20.87 20.87 0.61 A36 HGEC-TPSK-D34-20061 1of1


2 8110-P158 SHS200*9x440 23.75 47.50 0.72 A36 N/A 00
Q.TY MARK DESCRIPTION UNIT WEIGHT (Kg)TOTAL WT.(Kg) AREA(M2) MATERIAL Drawing No: IS-5622-CL1