Professional Documents
Culture Documents
IS-5622-CL1 - Rev 00
IS-5622-CL1 - Rev 00
PLANT
NORTH
SECONDARY
TEMPORARY
CONSTRUCTION AREA GATE 6 WIND (19)
METERING
0M
8110-EP32
PRIMARY
WIND (28)
A 8110-EP32 A GATE 1
PROCESS CGC
(MTBE BUT 1) GATE 2
EL +7 M
0C - COMMON AREA
2D
2E
5T
0S
UTILITIES
5U
5T
1B
8110-H94 8110-H96 8110-H94
FURNACES UTILITIES
450
470
BUTADIENE
FURNACES
PROCESS
PROCESS
QUENCH
2C
2B
3S
3A
2A
1A
8110-P158 8110-P158
300
GATE 4 GATE 3
EL +6 M EL +6 M
POINT
20
20
100 200 100 100 200 100 Long Son Petrochemicals Co., Ltd 1 REVISE AND RESUBMIT
E&C
2 TO BE ISSUED AS FINAL PROVIDED
400 PROJ.: PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TOÅ HÔÏP HOÙA DAÀU MIEÀN NAM VIEÄT NAM
COMMENTS ARE INCORPORATED
25
25
PURCHASE ORDER N.: PO-TPSK-HGEC-001 BY: DATE:
150
150
150
25
25
25
8110-EP32 8110-EP32
SECTION A
50 50
4*D24 4*D24 105W-DW-1844-0004-002 STEEL RAILING FOR PROTECTION OF BASIN
105W-DW-1844-0004-002rev2 10--PIT-5620 SECTION
200
400
8110-P158 Drawing No DESCRIPTION
REFERENCE DRAWINGS
50 50
50 50
8110-EP31
8110-EP31
SECTION B
00 08.03.2021
E&C
Long Son Petrochemicals Co., Ltd