ESTACION: C-1 FECHA: 11/9/2020 UBICACION: Intersec. Alfonso Ugarte con Heroes del Cenepa
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA AV. ALFONSO UGARTE ENTRE LA AV. HÉROES DEL CENEPA HASTA LA QUEBRADA CRUZ BLANCA CAJAMARCA DEL DISTRITO DE CAJAMARCA -
PROVINCIA DE CAJAMARCA - DEPARTAMENTO DE CAJAMARCA
VEHICULOS LIGEROS BUS CAMIONES UNITARIOS SEMITRAILER TRAILER
Hora Sentido Autos Pick up C. Rural Micros 2E 3E 2E 3E 4E 2S1/2S2 2S3 3S1/3S2 >=3S3 2T2 2T3 3T2 3T3 TOTAL %
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
0-1
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
1-2
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
2-3
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
3-4
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.6%
4-5
S 2 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.8%
E 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.4%
5-6
S 5 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 2.9%
E 5 5 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 11 4.5%
6-7
S 8 2 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 4.7%
E 6 5 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 5.3%
7-8
S 5 4 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 11 4.0%
E 4 2 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 8 3.3%
8-9
S 7 7 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 15 5.4%
E 8 8 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 18 7.3%
9-10
S 9 8 1 0 0 0 2 0 0 0 0 0 0 0 0 0 0 20 7.2%
E 10 2 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 14 5.7%
10-11
S 14 5 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 7.2%
E 15 11 4 0 0 0 2 0 0 0 0 0 0 0 0 0 0 32 13.1%
11-12
S 17 8 4 0 0 0 2 0 0 0 0 0 0 0 0 0 0 31 11.2%
E 14 12 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 28 11.4%
12-13
S 14 11 2 1 0 0 2 1 0 0 0 0 0 0 0 0 0 31 11.2%
E 12 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16 6.5%
13-14
S 10 6 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 18 6.5%
E 11 4 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18 7.3%
14-15
S 10 3 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14 5.1%
E 14 4 2 0 0 0 0 1 0 0 0 0 0 0 0 0 0 21 8.6%
15-16
S 11 3 3 0 0 0 0 1 0 0 0 0 0 0 0 0 0 18 6.5%
E 9 4 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 15 6.1%
16-17
S 9 6 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17 6.2%
E 4 5 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 11 4.5%
17-18
17-18
S 6 5 3 0 0 0 1 1 0 0 0 0 0 0 0 0 0 16 5.8%
E 9 5 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16 6.5%
18-19
S 9 4 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14 5.1%
E 4 3 1 0 0 0 1 1 0 0 0 0 0 0 0 0 0 10 4.1%
19-20
S 6 3 1 0 0 0 1 2 0 0 0 0 0 0 0 0 0 13 4.7%
E 4 4 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 3.7%
20-21
S 5 4 1 0 0 0 1 1 0 0 0 0 0 0 0 0 0 12 4.3%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
21-22
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
22-23
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
23-24
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 132 78 22 0 0 0 6 3 0 3 1 0 0 0 0 0 0 245 100.0%
Parcial
S 147 85 25 1 0 0 12 6 0 0 0 0 0 0 0 0 0 276 100.0%
TOTAL AMBOS SENT. 279 163 47 1 0 0 18 9 0 3 1 0 0 0 0 0 0 521
53.55% 31.29% 9.02% 0.19% 0.00% 0.00% 3.45% 1.73% 0.00% 0.58% 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.0%
CONTEO Y CLASIFICACION VEHICULAR
ESTACION: C-1 FECHA: 11/10/2020 UBICACION: Intersec. Alfonso Ugarte con Heroes del Cenepa
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA AV. ALFONSO UGARTE ENTRE LA AV. HÉROES DEL CENEPA HASTA LA QUEBRADA CRUZ BLANCA CAJAMARCA DEL DISTRITO DE CAJAMARCA -
PROVINCIA DE CAJAMARCA - DEPARTAMENTO DE CAJAMARCA
VEHICULOS LIGEROS BUS CAMIONES UNITARIOS SEMITRAILER TRAILER
Hora Sentido Autos Pick up C. Rural Micros 2E 3E 2E 3E 4E 2S1/2S2 2S3 3S1/3S2 >=3S3 2T2 2T3 3T2 3T3 TOTAL %
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
0-1
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
1-2
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
2-3
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
3-4
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.5%
4-5
S 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.4%
E 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1.4%
5-6
S 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 3 1.2%
E 4 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 6 2.7%
6-7
S 7 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 3.2%
E 3 3 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 8 3.6%
7-8
S 8 2 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 11 4.3%
E 9 2 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 12 5.4%
8-9
S 14 3 0 0 0 0 2 0 1 0 0 0 1 0 0 0 0 21 8.3%
E 9 3 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 13 5.9%
9-10
S 11 3 1 0 0 0 3 0 0 0 0 0 0 0 0 0 0 18 7.1%
E 11 4 1 0 0 0 2 1 0 0 0 0 0 0 0 0 0 19 8.6%
10-11
S 12 4 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 18 7.1%
E 18 5 1 0 0 0 2 0 0 0 0 0 0 0 0 0 0 26 11.8%
11-12
S 16 5 1 0 0 0 2 0 0 0 0 0 0 0 0 0 0 24 9.5%
E 13 2 1 0 0 0 2 0 0 0 0 0 0 0 0 0 0 18 8.1%
12-13
S 16 6 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 24 9.5%
E 13 2 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 17 7.7%
13-14
S 9 2 1 0 0 0 1 1 0 0 0 0 0 0 0 0 0 14 5.5%
E 11 2 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 15 6.8%
14-15
S 10 4 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 16 6.3%
E 10 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 5.9%
15-16
S 12 4 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 17 6.7%
E 14 4 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 19 8.6%
16-17
S 17 4 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 22 8.7%
E 10 3 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 14 6.3%
17-18
S 12 3 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 16 6.3%
E 17 3 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 21 9.5%
18-19
S 17 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 7.9%
E 9 2 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 12 5.4%
19-20
S 13 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16 6.3%
E 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.8%
20-21
S 3 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.6%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
21-22
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
22-23
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
23-24
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 157 40 5 0 0 0 16 1 0 1 1 0 0 0 0 0 0 221 100.0%
Parcial
S 179 49 5 0 0 0 16 1 1 1 0 0 1 0 0 0 0 253 100.0%
TOTAL AMBOS SENT. 336 89 10 0 0 0 32 2 1 2 1 0 1 0 0 0 0 474
70.89% 18.78% 2.11% 0.00% 0.00% 0.00% 6.75% 0.42% 0.21% 0.42% 0.21% 0.00% 0.21% 0.00% 0.00% 0.00% 0.00% 100.0%
CONTEO Y CLASIFICACION VEHICULAR
ESTACION: C-1 FECHA: 11/11/2020 UBICACION: Intersec. Alfonso Ugarte con Heroes del Cenepa
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA AV. ALFONSO UGARTE ENTRE LA AV. HÉROES DEL CENEPA HASTA LA QUEBRADA CRUZ BLANCA CAJAMARCA DEL DISTRITO DE CAJAMARCA -
PROVINCIA DE CAJAMARCA - DEPARTAMENTO DE CAJAMARCA
VEHICULOS LIGEROS BUS CAMIONES UNITARIOS SEMITRAILER TRAILER
Hora Sentido Autos Pick up C. Rural Micros 2E 3E 2E 3E 4E 2S1/2S2 2S3 3S1/3S2 >=3S3 2T2 2T3 3T2 3T3 TOTAL %
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
0-1
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
1-2
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
2-3
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
3-4
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 0.5%
4-5
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.9%
5-6
S 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.8%
E 3 2 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 7 3.3%
6-7
S 6 1 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 8 3.0%
E 7 1 1 0 0 0 1 0 0 1 0 0 0 0 0 0 0 11 5.2%
7-8
S 6 2 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 10 3.8%
E 7 1 1 0 0 0 3 0 0 0 0 0 0 0 0 0 0 12 5.7%
8-9
S 12 3 1 0 0 0 4 1 0 0 0 0 1 0 0 0 0 22 8.3%
E 9 4 0 1 0 0 4 0 0 0 0 0 0 0 0 0 0 18 8.5%
9-10
S 12 5 1 0 0 0 2 0 0 0 0 0 0 0 0 0 0 20 7.6%
E 11 3 2 0 0 0 0 0 0 0 1 0 0 0 0 0 0 17 8.0%
10-11
S 14 5 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 21 8.0%
E 12 5 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 19 9.0%
11-12
S 16 8 2 0 0 0 2 0 0 0 0 0 0 0 0 0 0 28 10.6%
E 12 4 0 0 0 0 2 1 0 0 0 0 0 0 0 0 0 19 9.0%
12-13
S 17 6 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 25 9.5%
E 12 4 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 19 9.0%
13-14
S 12 4 1 0 0 0 2 0 0 0 1 0 0 0 0 0 0 20 7.6%
E 8 2 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 11 5.2%
14-15
S 7 5 2 0 0 0 1 1 0 0 0 0 0 0 0 0 0 16 6.1%
E 10 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 12 5.7%
15-16
S 18 3 1 0 0 0 1 1 0 0 0 0 1 0 0 0 0 25 9.5%
E 11 2 0 0 0 0 1 0 0 1 0 0 1 0 0 0 0 16 7.5%
16-17
S 11 3 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 15 5.7%
E 11 3 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 15 7.1%
17-18
S 10 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 12 4.5%
E 11 4 1 0 0 0 1 1 0 0 0 0 0 0 0 0 0 18 8.5%
18-19
S 13 3 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 18 6.8%
E 5 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 3.8%
19-20
S 7 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 3.4%
E 4 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 2.8%
20-21
S 10 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 4.9%
E 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.5%
21-22
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
22-23
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
23-24
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 135 41 8 1 0 0 19 3 0 3 1 0 1 0 0 0 0 212 100.0%
Parcial
S 173 54 12 0 0 0 17 4 0 0 1 0 3 0 0 0 0 264 100.0%
TOTAL AMBOS SENT. 308 95 20 1 0 0 36 7 0 3 2 0 4 0 0 0 0 476
64.71% 19.96% 4.20% 0.21% 0.00% 0.00% 7.56% 1.47% 0.00% 0.63% 0.42% 0.00% 0.84% 0.00% 0.00% 0.00% 0.00% 100.0%
CONTEO Y CLASIFICACION VEHICULAR
ESTACION: C-1 FECHA: 11/12/2020 UBICACION: Intersec. Alfonso Ugarte con Heroes del Cenepa
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA AV. ALFONSO UGARTE ENTRE LA AV. HÉROES DEL CENEPA HASTA LA QUEBRADA CRUZ BLANCA CAJAMARCA DEL DISTRITO DE CAJAMARCA -
PROVINCIA DE CAJAMARCA - DEPARTAMENTO DE CAJAMARCA
VEHICULOS LIGEROS BUS CAMIONES UNITARIOS SEMITRAILER TRAILER
Hora Sentido Autos Pick up C. Rural Micros 2E 3E 2E 3E 4E 2S1/2S2 2S3 3S1/3S2 >=3S3 2T2 2T3 3T2 3T3 TOTAL %
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
0-1
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
1-2
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
2-3
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
3-4
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 3 1.3%
4-5
S 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.3%
E 2 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1.8%
5-6
S 2 1 1 0 0 0 2 0 0 0 0 0 0 0 0 0 0 6 2.1%
E 4 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 8 3.6%
6-7
S 4 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 7 2.4%
E 7 3 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 11 4.9%
7-8
S 11 2 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 15 5.2%
E 9 2 1 0 0 0 2 0 0 0 0 0 0 0 0 0 0 14 6.3%
8-9
S 11 3 1 0 0 0 3 0 0 1 0 0 0 0 0 0 0 19 6.6%
E 12 5 1 0 0 0 2 0 0 0 0 0 0 0 0 0 0 20 9.0%
9-10
S 17 6 2 0 0 0 2 1 0 0 0 0 0 0 0 0 0 28 9.7%
E 9 3 2 0 0 0 1 1 0 0 0 0 0 0 0 0 0 16 7.2%
10-11
S 19 4 0 0 0 0 3 0 0 0 1 0 0 0 0 0 0 27 9.3%
E 9 3 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 14 6.3%
11-12
S 15 6 1 0 0 0 3 0 0 0 0 0 0 0 0 0 0 25 8.7%
E 13 3 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 18 8.1%
12-13
S 12 4 1 0 0 0 2 0 0 0 0 0 0 0 0 0 0 19 6.6%
E 9 3 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 14 6.3%
13-14
S 11 4 1 0 0 0 2 0 0 0 0 0 0 0 0 0 0 18 6.2%
E 4 3 1 0 0 0 2 1 0 0 0 0 0 0 0 0 0 11 4.9%
14-15
S 11 5 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 18 6.2%
E 12 2 0 0 0 0 2 1 0 0 0 0 0 0 0 0 0 17 7.6%
15-16
S 12 3 1 0 0 0 2 1 0 0 0 0 0 0 0 0 0 19 6.6%
E 14 2 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 17 7.6%
16-17
S 13 5 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 19 6.6%
E 11 3 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 15 6.7%
17-18
S 21 3 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 26 9.0%
E 12 4 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 18 8.1%
18-19
S 15 3 1 0 0 0 0 2 0 0 0 0 0 0 0 0 0 21 7.3%
E 9 4 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 15 6.7%
19-20
S 8 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 4.5%
E 6 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 3.6%
20-21
S 6 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 2.8%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
21-22
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
22-23
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
23-24
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 143 45 9 2 0 0 19 4 0 1 0 0 0 0 0 0 0 223 100.0%
Parcial
S 189 57 13 0 0 0 24 4 0 1 1 0 0 0 0 0 0 289 100.0%
TOTAL AMBOS SENT. 332 102 22 2 0 0 43 8 0 2 1 0 0 0 0 0 0 512
64.84% 19.92% 4.30% 0.39% 0.00% 0.00% 8.40% 1.56% 0.00% 0.39% 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.0%
CONTEO Y CLASIFICACION VEHICULAR
ESTACION: C-1 FECHA: 11/13/2020 UBICACION: Intersec. Alfonso Ugarte con Heroes del Cenepa
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA AV. ALFONSO UGARTE ENTRE LA AV. HÉROES DEL CENEPA HASTA LA QUEBRADA CRUZ BLANCA CAJAMARCA DEL DISTRITO DE CAJAMARCA -
PROVINCIA DE CAJAMARCA - DEPARTAMENTO DE CAJAMARCA
VEHICULOS LIGEROS BUS CAMIONES UNITARIOS SEMITRAILER TRAILER
Hora Sentido Autos Pick up C. Rural Micros 2E 3E 2E 3E 4E 2S1/2S2 2S3 3S1/3S2 >=3S3 2T2 2T3 3T2 3T3 TOTAL %
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
0-1
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
1-2
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
2-3
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
3-4
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 2 0.8%
4-5
S 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1.1%
E 3 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 5 2.1%
5-6
S 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.7%
E 6 1 0 0 0 0 0 2 0 0 1 0 0 0 0 0 0 10 4.1%
6-7
S 5 3 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 9 3.3%
E 9 2 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 13 5.4%
7-8
S 10 4 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15 5.5%
E 11 2 1 0 0 0 0 2 1 0 0 0 0 0 0 0 0 17 7.1%
8-9
S 14 6 2 0 0 0 0 4 1 1 0 0 0 0 0 0 0 28 10.2%
E 11 4 1 0 0 0 0 3 1 0 0 0 0 0 0 0 0 20 8.3%
9-10
S 12 8 1 0 0 0 0 3 1 0 0 0 0 0 0 0 0 25 9.1%
E 6 4 1 0 0 0 0 2 0 0 0 0 0 0 0 0 0 13 5.4%
10-11
S 17 5 1 0 0 0 0 2 1 0 0 0 0 0 0 0 0 26 9.5%
E 16 4 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 22 9.1%
11-12
S 14 8 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 24 8.7%
E 13 3 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 18 7.5%
12-13
S 18 4 2 0 0 0 0 2 1 0 0 0 0 0 0 0 0 27 9.8%
E 7 3 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 12 5.0%
13-14
S 16 3 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 21 7.6%
E 10 3 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 15 6.2%
14-15
S 8 4 1 0 0 0 0 1 1 0 0 0 0 0 0 0 0 15 5.5%
E 9 4 1 0 0 0 0 1 1 0 0 0 0 0 0 0 0 16 6.6%
15-16
S 8 4 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 13 4.7%
E 11 4 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 16 6.6%
16-17
S 12 6 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 20 7.3%
E 18 6 0 0 0 0 0 1 0 0 0 0 0 1 0 0 0 26 10.8%
17-18
S 10 3 0 0 0 0 0 1 0 0 0 0 0 1 0 0 0 15 5.5%
E 11 4 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 17 7.1%
18-19
S 10 5 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16 5.8%
E 8 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 4.1%
19-20
S 8 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 4.0%
E 7 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 9 3.7%
20-21
S 3 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1.8%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
21-22
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
22-23
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
23-24
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 157 48 8 0 0 0 0 21 4 0 2 0 0 1 0 0 0 241 100.0%
Parcial
S 170 68 11 0 0 0 0 16 6 3 0 0 0 1 0 0 0 275 100.0%
TOTAL AMBOS SENT. 327 116 19 0 0 0 0 37 10 3 2 0 0 2 0 0 0 516
63.37% 22.48% 3.68% 0.00% 0.00% 0.00% 0.00% 7.17% 1.94% 0.58% 0.39% 0.00% 0.00% 0.39% 0.00% 0.00% 0.00% 100.0%
CONTEO Y CLASIFICACION VEHICULAR
ESTACION: C-1 FECHA: 11/14/2020 UBICACION: Intersec. Alfonso Ugarte con Heroes del Cenepa
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA AV. ALFONSO UGARTE ENTRE LA AV. HÉROES DEL CENEPA HASTA LA QUEBRADA CRUZ BLANCA CAJAMARCA DEL DISTRITO DE CAJAMARCA -
PROVINCIA DE CAJAMARCA - DEPARTAMENTO DE CAJAMARCA
VEHICULOS LIGEROS BUS CAMIONES UNITARIOS SEMITRAILER TRAILER
Hora Sentido Autos Pick up C. Rural Micros 2E 3E 2E 3E 4E 2S1/2S2 2S3 3S1/3S2 >=3S3 2T2 2T3 3T2 3T3 TOTAL %
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
0-1
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
1-2
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
2-3
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
3-4
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.4%
4-5
S 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 2 0.7%
E 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1.3%
5-6
S 2 2 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 6 2.1%
E 4 1 1 0 0 0 1 0 0 0 1 0 0 0 0 0 0 8 3.5%
6-7
S 7 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 10 3.5%
E 7 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 4.0%
7-8
S 9 3 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 14 4.9%
E 8 2 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 12 5.3%
8-9
S 16 5 1 0 0 0 1 0 0 0 0 0 2 0 0 0 0 25 8.7%
E 8 3 2 0 0 0 1 0 0 0 0 0 2 0 0 0 0 16 7.1%
9-10
S 18 6 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 25 8.7%
E 5 5 2 0 0 0 1 0 0 0 0 0 0 0 0 0 0 13 5.8%
10-11
S 18 5 1 0 0 0 2 0 0 0 0 0 0 0 0 0 0 26 9.1%
E 17 7 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 26 11.5%
11-12
S 22 7 2 0 0 0 2 0 0 0 0 0 0 0 0 0 0 33 11.5%
E 12 6 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 19 8.4%
12-13
S 20 9 1 0 0 0 1 0 0 0 1 0 0 0 0 0 0 32 11.1%
E 12 4 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 18 8.0%
13-14
S 12 7 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 21 7.3%
E 13 2 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 17 7.5%
14-15
S 6 2 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 10 3.5%
E 16 0 1 0 0 0 1 1 0 0 0 0 0 0 0 0 0 19 8.4%
15-16
S 16 4 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 21 7.3%
E 3 3 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 7 3.1%
16-17
S 12 3 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 17 5.9%
E 10 3 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 15 6.6%
17-18
S 11 4 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 17 5.9%
E 14 5 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 8.8%
18-19
S 7 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 3.1%
E 10 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 5.8%
19-20
S 9 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 4.2%
E 6 3 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 4.4%
20-21
S 5 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 2.4%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
21-22
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
22-23
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
23-24
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
E 147 49 15 0 0 0 11 1 0 0 1 0 2 0 0 0 0 226 100.0%
Parcial
S 191 65 10 0 0 0 15 0 0 1 2 0 3 0 0 0 0 287 100.0%
TOTAL AMBOS SENT. 338 114 25 0 0 0 26 1 0 1 3 0 5 0 0 0 0 513
65.89% 22.22% 4.87% 0.00% 0.00% 0.00% 5.07% 0.19% 0.00% 0.19% 0.58% 0.00% 0.97% 0.00% 0.00% 0.00% 0.00% 100.0%
RESUMEN DE CONTEO Y CLASIFICACION VEHICULAR (METODO AASTHO)
ESTACION: C-1
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA AV. ALFONSO UGARTE ENTRE LA AV. HÉROES DEL CENEPA HASTA LA QUEBRADA CRUZ BLANCA CAJAMARCA DEL DISTRITO DE
CAJAMARCA - PROVINCIA DE CAJAMARCA - DEPARTAMENTO DE CAJAMARCA
K= 1 UBICACION: Intersec. Alfonso Ugarte con Heroes del Cenepa
2) ESPESOR DE PAVIMENTO
esp = 200 mm asumido
3) INDICES DE SERVICIABLIDAD
Pt = 2 seviciabilidad final ΔPSI = Po - Pt = 2.5
INDICE DE SERVICIABILIDAD INICIAL INDICE DE SERVICIABILIDAD FINAL
Po = 4.5 para pavimentos rigidos Pt = 2.5 o más para caminos muy importantes
Po = 4.2 para pavimentos flexibles Pt = 2.0 para caminos de transito menor
1) CONFIABILIDAD
NIVELES DE CONFIABILIDAD R
TIPO DE CARRETERA
Suburbanas Rurales
Autopista Regional 85 - 99.9 80 - 99.9
Troncales 80 - 99 75 - 95
Colectoras 80 - 95 50 - 80
R= 80 %
TIPO ( So )
Pavimentos Rígidos 0.30 - 0.40
Construcción Nueva 0.35
En Sobre Capas 0.40
So = 0.35
DETERMINACION DEL MODULO DE REACCION EFECTIVO DE LA SUBRAZANTE
ESTACION: C-1
Ecuación de Kentucky
(regresión exponencial)
MR = 1910 (CBR)^0.68
MR = 14646.4969 psi = 101.06 Mpa
(regresión polinómica 2°) Solo para CBR < 55 %
MR = -7.5 CBR ^2 + 800 CBR + 1820
MR = 15220 psi = 105.02 Mpa
En el monograma
2) METODO AASHTO
1) PERDIDA DE SERVICIABILIDAD
ΔPSI = Po - Pt = 2
2) DRENAJE
CALIDAD DEL DRENAJE TIEMPO QUE TARDA EL AGUA EN SER EVACUADA
Exelente 2 horas
Bueno 1 día
Mediano 1 semana
Malo 1 mes
Muy malo el agua no evacua
Cd = 0.90
J= 3.00
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA AV. ALFONSO UGARTE ENTRE LA AV. HÉROES DEL CENEPA HASTA LA QUEBRADA CRUZ BLANCA
CAJAMARCA DEL DISTRITO DE CAJAMARCA - PROVINCIA DE CAJAMARCA - DEPARTAMENTO DE CAJAMARCA
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA AV. ALFONSO UGARTE ENTRE LA AV. HÉROES DEL CENEPA HASTA LA QUEBRADA CRUZ BLANCA
CAJAMARCA DEL DISTRITO DE CAJAMARCA - PROVINCIA DE CAJAMARCA - DEPARTAMENTO DE CAJAMARCA
DATOS:
K= 44.61 Mpa/m So = 0.35
Ec = 24820 Mpa R= 80 % => ZR = -0.841
S'c = Mr = 4.35 Mpa Pt = 2
J= 3.00 ΔPSI = 2
Cd = 0.90 W80 = 1.62 x 10 ^ 6
D= ??? mm por tanteo
D= 190.00 mm
RESOLVIENDO:
OK