THE RED SEA DEVELOPMENT COMPANY WORKFLOW TRANSMITTAL TRS02I16-WTRAN-016965

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Workflow Transmittal TRS02I16-WTRAN-016965 TRS02I16-WTRAN-016965

Final (WF-004915) R02I16B01 - Method Statement for Dry Type Transformer


Installation

From Mr Joseph Stratford - The Red Sea Development Company

To
(20) Mr Enrico Purugganan - AECOM (+19 more...)

Cc
(13) Mr Rowell Lizardo - NAPJV (+12 more...)

Sent Wednesday, 18 May 2022


3:21:54 PM AST (GMT +03:00)

Status N/A


DOCUMENT ATTACHMENTS
(1)

(0 selected)

File Document No Revision Title Status

R02-I16B01-NAP-MTS-EL- Method Statement for Dry Type Transformer Accepted with


00
0036 Installation Comments


ATTRIBUTES

Attribute 1 Airside


MESSAGE

Workflow Review History

The attached documents have completed the "R02I16B01 - Method Statement for Dry Type Transformer Installation" workflow with the
following results :

This transmittal was automatically generated.

Doc No Step Participant Review Outcome Comments

R02-I16B01-NAP-MTS- AECOM Document


E Purugganan Accepted
EL-0036 Controller

AECOM Supervision T Issa Accepted with Comments 1. JV to address and

https://ksa1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1353670278&USERID=1342251793 1/3
6/4/22, 4:03 PM Aconex

include the
comments/points stated on
the document. Amended
copy shall include all
missing/rectification points.
ex: lifting activity.
2. MS
shall be endorsed by the
supplier/manufacturer.
3.
Installation of Equipment
shall be done based on
specs procedure,
manufacturer instructions,
approved drawings and
MS.
4. Testing and
commissioning shall be
provided in separate
method statement ,,
endorsed by the specialist
3rd party.
5. Risk
assessment and HSE plan
is subject to HSE discipline
confirmation.

- Refer Comments and


TRSDC Sr. Project comply.
- Interfacing points
K Shanablih Accepted with Comments
Manager and connections shall be
considered.

TRSDC Environmental D Smith Review Not Required

TRSDC HSE E Sallam Accepted with Comments 1) Point 3 in risk


assessment in controls,
change severity to 4 as the
activity has high severity
2)
In point 4 in risk
assessment add in
controls : "Full body
harness must be inspected
prior to use"
3) In point 5 in
risk assessment, add in
controls : "Experienced
and third party certified
crane operators should be
appointed ".
4) Point 6 in
risk assessment , add in
controls : "Follow the
principle of clean as you
go" not only cleaning after
the work /task has finished.
5) Point 11 in risk
assessment / controls, add
"the load should be
evaluated and more than

https://ksa1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1353670278&USERID=1342251793 2/3
6/4/22, 4:03 PM Aconex

one person should lift it if


needed"
6) Change the
severity rating in point 9 in
risk assessment to 4

Please comply with the


TRSDC AD Airport
D Ballard Accepted with Comments comments from AECOM
Engineering
and TRSDC

TRSDC Associate Comply with AECOM and


D Ballard Accepted with Comments
Director TRSDC comments

TRSDC Construction Refer to reviewers


B Peries Accepted with Comments
Director comments.

Acceptance is subject to
TRSDC Airport Director M Macci Accepted with Comments satisfactory resolution of all
the comments.

refer to TRSDC/AECOM
TRSDC Project Director J Stratford Accepted with Comments
reviewer comments

https://ksa1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1353670278&USERID=1342251793 3/3