Handling of CBRN contingencies at Nuclear Power Plant (NPP) sites ( Compiled data received from units)

Task Identify other Work out a check-list based on Availability/deficiency of CBRN equipments @ 03 Availability of Availability/
for officers in the unit conduct of Mock Exercise in the past teams per site (If equipment is available over & trained power deficiency of
NPP including & experiences gained in handling above the required quantity same may also be including manpower for
DC/AC/Team such situation to guage state of intimated separately) MT/ToT/RSO & meeting exact
Commanders to preparedness for contingencies on additional requirement
be associated various parameters. requirement for 03 teams/
BN during visit of NPP site as
NPP site with CO. per
authorisation.
Noted for Check list for NPP Contingencies: - Availability/deficiency of CBRN equipments in 04 Availability of
04 Bn NDRF

compliance  Types of source Bn. Enclosed as per appendix “A”. CBRN trained
 Quantity personnel in 04
 Evacuation Bn are CBRN
 Availability of expert Basic-590, ToT-
 Decontamination (Time & 19, MT-08 & RSO-
location) 04.

Sh. Ashish Kumar No any mock exercise with this Few CBRN equipments including high-technology Availability of Sufficient
05 Bn NDRF

(Dy. Comdt) to be installation has been conducted on for 03 teams per site are required. List as below: CBRN trained manpower for
associate during such situation in past. SL. NAMES OF EQUIPMENTS QTY personnel in 05 meeting exact
visit of NPP site NO REQD Bn are ToT-17, requirement
with Commandant 01 Tactic ID Mobile 03 MT-04 & RSO-04. for 03
from 05 Bn. 02 2020 Combo PRO is a Photo Ionization 03 teams/NPP
Detector (PID) site as per
03 Personal Radiation Dosimeter (PRD) 03 authorization
05 X-am® 8000 03 is available in
06 Hapsite Smart Plus Chemical 03 05 Bn.
Identification System from Inficon
07 HDS-101 G/GN (Handheld Search and 03
Isotope
Identification Device )
08 Decocontain 3000 01
09 Multi Gas Detector 06
10 Decontamination Kit 09
11 Radiation Tag/Symbols 200
06 Bn NDRF Sh. Anupam, DC Check List: - C) Availability/ Deficiency of CBRN equipment:- Availability of Availability/
Sl. Name of BN held Team C ‘coy’ E ‘coy’
Sh. Ajay Kr Singh, (i) Equipment :- Teletector, GM Survey No equipment on wise Kakrapara KAPS Rawatbhata RAPP
trained Deficiency of
DC Meter, Contamination Monitor, Mini charge Auth. Held Defi Not Held Defic Not manpower in 10 CBRN
Sh. Yogesh kr Rad Meter, Portable Alpha cien workin iency wor
Bn are ToT-27, equipment is
cy g king
Meena, AC Contamination Monitor, NBC Suits M 1. Teletector 10 02 04 02 02 03 03 MT-10 & RSO-05. mentioned in
Sh. Rajender K- IV & V (permeable) 2. GM Survey Meter 30 06 12 06 01 09 09 their
decontamination, Electronic 3. Contamination
Singh, 2 I/C 54 06 20 -- 08 17 01
msg/reply.
dosimeter, Beta Gama Counting Monitor
Insp GD Kamlesh
system, Alpha Counting system, 4. Mini Rad Meter 10 02 04 02 -- 02 04
Karande Battery operated air sampler with 5. Portable Alpha 9 01 04 -- -- 02 01
Insp/GD Bharat filter paper, Micro R Survey meter,
Contamination
Monitor
Maurya Breathing apparatus set with spare 6. NBC Suits M K- IV 01 36 85 23 -- 50 58
Insp/GD Deepak cylinders, Portable decontamination & V (Permeable)
decontamination
&219

Babu apparatus, NBC Suit (Impermeable) 7. Thermo -- -- -- --


Insp/GD Ram Decontamination, Integrated Hood Luminescent
dosimeter (TLD)
Singh Saini Mask, Respirator (Gas mask NBC 8. Iodate tablets -- -- -- --
Insp/GD Anil with 01 canisters), Butyl Rubber 9. A level suits 04 02 02 04 -- 01 05

Kumar Dadhich Gloves (inner and outer), NBC over 10. Decontamination -- 01 -- 03 -- -- 03

Insp/GD Suresh boots, Resuscitator, Casualty bag kit (in set)


(SUDHIKA)
(full), Casualty bag (half), 11. Battery operated
Kumar Gurjar 07 02 04 02 -- -- 06
Decontamination kit (in set) sudhika, air sampler with
filter paper
Plastic Sheet (mtr’s), Plastic bag 12. Micro R Survey mtr 10 02 04 02 -- 03 03 03
(2’X3’), Cordoning tape (Mtr), Latex
13. Electronic 411 47 137 04 14 137 04 12
Gloves (Pairs), Tong (2 feet’s), dosimeter
Medical triage 4 set (50 M), 14. Beta Gama 02 -- 01 -- 01 01 --
Counting system
Radiation Tag with symbols, Thermo 15. Alpha Counting -- -- -- -- -- -- --
Luminescent dosimeter (TLD), system
16. Breathing 10 02 04 02 -- 03 03
Iodate tablets, Personal apparatus set with
decontamination kit. spare cylinders
(ii) Equipment must be calibrated 17. NBC Suit
(Impermeable)
79 12 29 07 -- 25 11

(iii) Small team Decontamination


18. Integrated Hood 14 03 08 01 -- 05 04
(iv) More light vehicle Mask
Experiences gained: - 19. Personal deconta-
mination kit
90 35 -- -- 20 --

 Better co-ordination with Nuclear 20. Portable 10 47 04 137 -- 02 139


Power Plant safety team and Civil decontamination
apparatus
Authority. 21. Respirator (Gas 130 45 37 98 -- 66 69
 More number of decon stations mask NBC with 01
canisters)
required. 22. Butyl Rubber Gloves 175 45 60 75 -- 57 78
 Separate decon station for women 23. NBC over boots 09 45 -- 135 -- 09 126
 These exercises increase our 24. Resuscitator 36 -- 12 -- -- 12 --
confidence levels.
08 Bn NDRF Name of the Unit did not conducted/participated Availability/ deficiency of authorized CBRN I. NDRF courses- This unit has
officers who will any of the mock exercise with Narora equipment in appendix-B • Basic CBRN-481 sufficient
be associated NPP. However, one officer was once • TOT – 26 CBRN trained
during the visit of nominated as an observer in a TTEx • MT- 11 personnel as
NPP site with at NPP Narora. II.Advance per
commandant- course- authorization
I.Sh. Aditya List of various stake holders and • MRDS- 10
Pratap Singh, Nodal officers - • RSO-05
DC/GD 1. DC/District Magistrate along • INMAS-04
II.Insp/GD with DDMA
Shatrughan 2. District Revenue Officers (Sub
Singh Divisions, Tehsil & Block level
III.Insp/GD Naveen officials)
Kumar 3. Head of DEOC
4. SP of Police
5. District Fire Officer
6. District Medical Officer/Civil
Surgeon
7. Veterinary Officer
8. Chief Development Officer
9. Asst. Director of Factories
10. State Electricity Board
11. Water Supply Department
12. Public Health Engineering
13. District Supply Officer
14. Public Works Department
15. District Transport Officer
16. Department of Labour
17. BSNL
18. District Information and Public
Relation Officer (DIPRO).
19. Food & Supplies and PDS
20. Municipal Corporation
21. District Forest Officer
22. CEO/Operations Head/Safety
Officer of local industrial units
23. Community Volunteers; local
NGOs, Red Cross NYKS, NCC, NSS,
Home Guards & CD
10 Bn NDRF Sh. J. Senthil Experience gained: Availability/deficiency of CBRN equipments @ 3 Availability of 10 Bn is able
Kumar, AC and Sh.  How to co-ordinate & operate with teams per site attached with this signal as trained to make one
Mohamed Aslam other stakeholders. appendix “B”. manpower in 10 compact
S, AC of 10 Bn  How to tackle the worst situation Bn are ToT-12, CBRN team as
have been & rescue the victims with various MT-05 & RSO-04. per
detailed to be methods and techniques. authorisation
associated during  How to co-ordinate with other for NPP Kaiga
visit of NPP site organisations & NGOs. and 02 other
with CO. The details of Mock exercise done in teams will be
the past and experienced gained in having
handling is attached with this shortfall of
message as appendix “A”. manpower for
CBRN duties.