Professional Documents
Culture Documents
Handling of CBRN Contingencies at Nuclear Power Plant (NPP) Sites (Compiled Data Received From Units)
Handling of CBRN Contingencies at Nuclear Power Plant (NPP) Sites (Compiled Data Received From Units)
Task Identify other Work out a check-list based on Availability/deficiency of CBRN equipments @ 03 Availability of Availability/
for officers in the unit conduct of Mock Exercise in the past teams per site (If equipment is available over & trained power deficiency of
NPP including & experiences gained in handling above the required quantity same may also be including manpower for
DC/AC/Team such situation to guage state of intimated separately) MT/ToT/RSO & meeting exact
Commanders to preparedness for contingencies on additional requirement
be associated various parameters. requirement for 03 teams/
BN during visit of NPP site as
NPP site with CO. per
authorisation.
Noted for Check list for NPP Contingencies: - Availability/deficiency of CBRN equipments in 04 Availability of
04 Bn NDRF
compliance Types of source Bn. Enclosed as per appendix “A”. CBRN trained
Quantity personnel in 04
Evacuation Bn are CBRN
Availability of expert Basic-590, ToT-
Decontamination (Time & 19, MT-08 & RSO-
location) 04.
Sh. Ashish Kumar No any mock exercise with this Few CBRN equipments including high-technology Availability of Sufficient
05 Bn NDRF
(Dy. Comdt) to be installation has been conducted on for 03 teams per site are required. List as below: CBRN trained manpower for
associate during such situation in past. SL. NAMES OF EQUIPMENTS QTY personnel in 05 meeting exact
visit of NPP site NO REQD Bn are ToT-17, requirement
with Commandant 01 Tactic ID Mobile 03 MT-04 & RSO-04. for 03
from 05 Bn. 02 2020 Combo PRO is a Photo Ionization 03 teams/NPP
Detector (PID) site as per
03 Personal Radiation Dosimeter (PRD) 03 authorization
05 X-am® 8000 03 is available in
06 Hapsite Smart Plus Chemical 03 05 Bn.
Identification System from Inficon
07 HDS-101 G/GN (Handheld Search and 03
Isotope
Identification Device )
08 Decocontain 3000 01
09 Multi Gas Detector 06
10 Decontamination Kit 09
11 Radiation Tag/Symbols 200
06 Bn NDRF Sh. Anupam, DC Check List: - C) Availability/ Deficiency of CBRN equipment:- Availability of Availability/
Sl. Name of BN held Team C ‘coy’ E ‘coy’
Sh. Ajay Kr Singh, (i) Equipment :- Teletector, GM Survey No equipment on wise Kakrapara KAPS Rawatbhata RAPP
trained Deficiency of
DC Meter, Contamination Monitor, Mini charge Auth. Held Defi Not Held Defic Not manpower in 10 CBRN
Sh. Yogesh kr Rad Meter, Portable Alpha cien workin iency wor
Bn are ToT-27, equipment is
cy g king
Meena, AC Contamination Monitor, NBC Suits M 1. Teletector 10 02 04 02 02 03 03 MT-10 & RSO-05. mentioned in
Sh. Rajender K- IV & V (permeable) 2. GM Survey Meter 30 06 12 06 01 09 09 their
decontamination, Electronic 3. Contamination
Singh, 2 I/C 54 06 20 -- 08 17 01
msg/reply.
dosimeter, Beta Gama Counting Monitor
Insp GD Kamlesh
system, Alpha Counting system, 4. Mini Rad Meter 10 02 04 02 -- 02 04
Karande Battery operated air sampler with 5. Portable Alpha 9 01 04 -- -- 02 01
Insp/GD Bharat filter paper, Micro R Survey meter,
Contamination
Monitor
Maurya Breathing apparatus set with spare 6. NBC Suits M K- IV 01 36 85 23 -- 50 58
Insp/GD Deepak cylinders, Portable decontamination & V (Permeable)
decontamination
&219