Total No. of Questions : 12] SEAT No.

P5140 [Total No. of Pages : 3


[77a1]-744
B.E. (Mechanical Engineering)
INDUSTRIAL ENGINEERING (Elective - III)
(2017 Pattern) (Semester - II)
Time : £ Hours 30 Minutes] [Max. Marhs :70
INSTRUGTIONS to the GANDIDATES:

m
1) Answers should be written in one answer booh.
£) Answer Q.1 or Q.£, Q.3 or Q.4, Q.5 or Q.6, Q.7 or Q.8, Q.9 or Q.10, Q.11 or

co
Q.1£.
3) Neat diagrams must be drawn wherever NEGESSARY.

s.
4) Figures to the right side INDIGATE full marhs.
5) Assume Kuitable data jf NEGESSARY.

Ql) a)
b) on
Define productivity? Explain various factors which affect productivity?[4]
Explain any two productivity models used in Industrial Engineering? [4]
iti
OR
ttu

Q2) a) Enlist elements of an organization? Explain the term departmentalization


in details? [4]
en

b) Enlist any 4 objectives of an industrial engineering? [4]

QS) What are therblings? Give any 5 therblings with symbols? [a]
om

OR
Q4) Describe Travel chart following with suitable example. [a]
m

Q5) a) Define the term:- work sampling. [2]


st

b) In a work sampling study carried out in heat treatment shop, following


data was collected [4]
La

i) Total time spent by the operator = 450 minutes


ii) Number of components produced = l50 No’s
iii) Working time of the operator = 70%
iv) Idle time for operator = 30%
v) Avg. rating for operator = 90%
Calculate the standard time for the component if total relaxation allowance
is 30% of the basic time?
P.T.O.
OR
Q6) a) Define the term with suitable example:- MOST. [2]
b) Compare : Work sampling and PMTS? [4]

Q7) a) Explain SCM with flow diagram? Discuss its importance in industry?[8]
b) Write a short note on [8]
i) Aggregate planning
ii) Push and Pull System

m
OR

co
Q8) a) Discuss the importance of sales forecasting. Explain any one method of
sales forecasting? [8]

s.
b) Discuss MRP-I and MRP-II with suitable example. [8]

Q9) a)
b) on
Enlist & Explain different computer aided layout design techniques? [8]
Classify & Explain different types of material handling equipments? [8]
iti
OR
ttu

QlO)a) Define Inventory and its importance. Enlist different types of Inventories?
Also explain various costs involved with Inventory? [8]
en

b) A manufacturing company requires 9000 units per year. Ordering cost is


Rs. l25/- per order and carrying cost is 20%. Purchase price per unit is
Rs. 42 Determine [a]
om

i) EOQ
ii) Optimum number of orders
m

iii) Total cost including acquisition of material


c) Explain the term:- ABC analysis. [2]
st
La

Qll)a) Write a short note on : [10]


i) kRA
ii) Break even analysis
b) What is cost accounting? What are objectives of cost accounting? Explain
elements of cost. [8]
OR

[55a1]-544 2
Ql2)a) What is industrial safety? What are the objectives of industrial safety?
Explain general safety rules. [8]
b) Calculate B.E.P.(In Unit and In Rupee) from the following information.[5]
Fixed cost = Rs l200/-
Variable cost = Rs 4000/-
Sales in rupee = Rs 7000
Sales in unit = Rs l000/-
c) Explain the term:- Payback method. [5]

m
AAAA

co
s.
on
iti
ttu
en
om
m
st
La

[55a1]-544 3
Total No. of Questions : 12] SEAT No. :
P3274 [Total No. of Pages : 3
[5670]-543
B.E. (Mechanical Engineering)
INDUSTRIAL ENGINEERING
(2015 Course) (Semester - II) (Elective - III) (402049B) (End Semester)

Time : 2½ Hours] [Max. Marks : 70


Instructions to the candidates:

m
1) Answers should be written in one answer book.
2) Answer Q.1 or Q.2, Q.3 or Q.4, Q.5 or Q.6, Q.7 or Q.8, Q.9 or Q.10,Q.11 or Q.12.

co
3) Neat diagrams must be drawn wherver necessary.
4) Figures to the right indicate full marks.

s.
5) Assume suitable data, if necessary.

Q1) Define Industrial engineering. Explain in brief various function of Industrial

on
engineering? [8]
OR
iti
Q2) Discuss in details factors that affect productivity. [8]
ttu

Q3) Explain with proper example Multiple activity chart. [8]


OR
en

Q4) a) Differentiate between Value Engineering and Value Analysis. [4]


b) Show and describe method study symbols for recording the facts. [4]
om

Q5) A work sampling study was conducted to establish the standard time for an
operation. The observations of the study given below; [6]
m

Total no. of operations = 160


st

Manual (hand controlled work = 14


Machine cotrolled work = 106
La

Average performance rating = 80%


No. of parts produced = 36
Allowance for personal needs and fatigue = 10%
Study conducted for 3 days
Available working hours/day = 8hrs
Calculate standard time per piece.
OR

P.T.O.
Q6) The elemental timings are given below along with the respective ratings.
Assuming rest and personal allowances as 12% and contingency allowance
as 2%, calculate the standard time for the operation. [6]
Element Observed Time Rating Remark
A 0.2 90
B 0.05 80
C 0.03 100
D 0.78 100

m
E 0.06 100

co
F 0.05 100
G 0.02 85 Once in 5 Pieces

s.
H 0.06 80
I
J
0.10
0.04 on 90
90 Once in 20 Pieces
iti
ttu

Q7) a) Explain in details MRP and MRP - II. [8]


b) ABC Company uses exponential smoothing with  = 0.15 for estimating
en

a demand. Following table shows the demand for 6 months. The forecast
for June is 500 units. Estimate the forecast for December. [8]
om

Month Actual Demand Forecast


June 450 500
m

July 505
st

August 516
September 488
La

October 467
November 554
OR
Q8) a) Short Note on ERP with Block Diagram. [8]
b) Explain in brief various functions of Production Planning and Control.[8]

[5670]-543 2
Q9) a) Write short note on: (i) Material Flow Patterns, (ii) Line Balancing. [8]
b) Define plant layout. What are various factors involved in selection in
selection of site for good plant. [8]
OR
Q10)a) Enlist material handling equipments. Describe any three material handling
equipment with suitable illustration. [8]
b) A manufacturing company requires 9500 units per year. Ordering cost
is Rs. 125 per order & carrying cost is 20%. Purchase price per unit is
Rs.
45. Determine: [8]

m
i) EOQ
ii) Optimum no. of orders

co
iii) Total cost including acquisition of material.

Q11)a) A Company has given following information. [8]

s.
Data Rs.

on
Sales 150000
Variable Overheads 120000
Gross Profit 60000
iti
Fixed Overheads 20000
Net Profit 40000
ttu

Find
i) P/V ratio
en

ii) BEP
iii) Net Profit when the sales are Rs. 400000
iv) Sales required to earn a profit of Rs. 80000
om

b) What is importance of standard costing? Explain different elements of


costs. [8]
m

OR

Q12)a) Explain break-even analysis with neat chart? What are assumptions made
st

in break-even analysis? What are different applications of break-even


analysis. [8]
La

b) Explain in brief different functions of human resource department.


Comment on concept of key result areas and performance appraisal of
employee. [8]

  

[5670]-543 3