Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

CATATAN

+ 13.11
+ 13.11 * MUTU MATERIAL MINIMUM :
FIN.ACP - BETON :
FIN.ACP PILE CAP : K-250
+ 9.00 TIE BEAM : K-250
PELAT LANTAI : K-250
+ 9.00

KOLOM : K-300
BALOK : K-250
+ 5.00
+ 5.00
- TULANGAN :
ULIR (D) : BJTD-32 = fy : 320 MPa
GESER GESER POLOS (Ø) : BJTP-24 = fy : 240 MPa
± 0.00
± 0.00
- KONTRUKSI RANGKA BAJA: MUTU BJ 41

TAMPAK SAMPING KANAN


TAMPAK DEPAN SKALA 1:250
SKALA 1:250

+ 13.11

+ 13.11

+ 9.00

+ 9.00

+ 5.00

+ 5.00

± 0.00 + 1.00 Peta Orientasi lokasi


± 0.00 + 1.00

± 0.00

LOKASI

TAMPAK BELAKANG
SKALA 1:250
TAMPAK SAMPING KIRI
SKALA 1:250

PENUTUP DINDING (ACP)

GS
B4
LOADING DOCK

0M
+ 0.90

A SJ
JALAN

AL
AN
GSB 40M AS
REINFORCED FLOOR UP TO
RAISED FLOOR FL +1.00
WAREHOUSE

27
.00
2.5 TON/M2

PENUTUP DINDING (ACP)

UTARA
.00
67 Nama Proyek/ lokasi

PEMBANGUNAN

24.00
O
EB
AZ
G

G
AZ
EB
O
GUDANG JNE 2 LANTAI
Jl. Lintas Timur/ Jl. Kapitiang,
VOID

Kel. Sialang Rampai Kec. Tenayan Raya


Pekanbaru-Riau

Pemilik : Paraf
PENUTUP DINDING (ACP)

00
90.
HUI MANDRA P. HOEIPAMAJAYA

36.
00
INF ED
W
RE RAIS AR
OR FL HO
CE OO
E
US
PT. JALINAN NUSANTARA EXPRES RKN
DF RF E
L L
2.5 OOR +1.0
TO U 0
N/M 2 P TO

145

50.0
LOADING DOCK

REINFORCED FLOOR UP TO

.00
No. SIBP : 004.B.1.2008
RAISED FLOOR FL +1.00

0
+ 0.90

WAREHOUSE

SIBP : RUDI HARTO, ST


2.5 TON/M2

W A
RE AISE REH
R
INF D F
OR L OU
LO CE OOR SE

Perencana :
AD
IN 2.5 D FL FL +
+ 0. G DO TO OO 1.0
90 CK N/M 2 R U 0
PT
O

Digambar : AHMAD RURI, A.Md

70
Nama gambar : Skala :

24.
W A
RE AISE RE
R
INF D H
OR FLO OU
CE OR SE
2.5 D FL FL +
TO OO 1
N/M 2 R U .00
PT
O

55. Tertera Tertera


LO
AD
ING
+ 0. DO
K
NAI
00
90 CK
AS
TER
PENUTUP DINDING (ACP)

IK
NA

Diperiksa oleh : Paraf


50. LO
AD

0
IN
+ 0. G DO

0 90 CK

WC
SE WC
LA
SA TO WC
-0.9 R IL
7 PR ET
IA WC
TO
WANILET
ITA

NAI
K
RA
MB
ram
p

NOMOR :

24.0
TANGGAL :

45.00
PENUTUP DINDING (ACP)
LOADING DOCK

0
REINFORCED FLOOR UP TO

R. STAFF
RAMB

+ 0.90

RAISED FLOOR FL +1.00

BALKON
+5.00
WAREHOUSE

DISETUJUI OLEH :
2.5 TON/M2

KEPALA DINAS PEKERJAAN UMUM


SELASAR

DAN PENATAAN RUANG


-0.97

121.00
KOTA PEKANBARU
BALKON
ramp

PANTRY

R. PERTEMUAN
+5.00

NAIK
WC

PENUTUP DINDING (ACP)

WC

R. TAMU

R. WAKIL
KANTOR
TOILET

KANTOR
+5.00

+5.00
PRIA

TOILET

R. KA.
+5.00
PRIA
WC

WC

SITE PLAN
WC

WC
WANITA
TOILET

WANITA

TURUN
TOILET
WC

SKALA 1:750
WC

INDRA POMI NASUTION, S.T.,M.Si


TURUN
TERAS

NAIK
NAIK

Pembina utama Muda


NIP. 19721111 20003 1 002
DENAH LT. 2 digambar no. revisi tanggal jumlah. lbr no. lbr
DENAH LT. 1 SKALA 1:300
SKALA 1:300 01-09-2021 4 1
CATATAN
* MUTU MATERIAL MINIMUM :
- BETON :
+ 13.11 + 13.11
PILE CAP : K-250
+ 13.10 TIE BEAM : K-250
PELAT LANTAI : K-250
KOLOM : K-300
DET. 2 DET. 2 DET. 2 BALOK : K-250
+ 8.00 + 9.00
+ 9.00
- TULANGAN :
DET. 1
DET. 3 DET. 3
DET. 1 ULIR (D) : BJTD-32 = fy : 320 MPa
+ 5.00 + 5.00
+ 5.00
POLOS (Ø) : BJTP-24 = fy : 240 MPa

A B C Pas. dinding 1/2


- KONTRUKSI RANGKA BAJA: MUTU BJ 41
WAREHOUSE
bata + plesteran
RAISED FLOOR FL +1.00
± 0.00 + 1.00
WAREHOUSE WAREHOUSE WAREHOUSE ± 0.00
RAISED FLOOR FL +0.90 RAISED FLOOR FL +0.90 RAISED FLOOR FL +0.90 ± 0.00

± 0.00 - 0.90

8 7 6 5 4 3 2 1

POTONGAN A-A POTONGAN B-B


SKALA 1:250 SKALA 1:250

DET. 2
Peta Orientasi lokasi

LOKASI

DETAIL SAMBUNGAN B
DETAIL SAMBUNGAN A SKALA 1:25 DETAIL SAMBUNGAN C
SKALA 1:25 SKALA 1:25

POTONGAN 1

Nama Proyek/ lokasi

RENCANA KAP ATAP PEMBANGUNAN


SKALA 1:300 GUDANG JNE 2 LANTAI
Jl. Lintas Timur/ Jl. Kapitiang,
Kel. Sialang Rampai Kec. Tenayan Raya
Pekanbaru-Riau

Pemilik : Paraf
SHEARWALL SHEARWALL
TEBAL PLAT
20CM
TEBAL PLAT
20CM HUI MANDRA P. HOEIPAMAJAYA
PT. JALINAN NUSANTARA EXPRES RKN

No. SIBP : 004.B.1.2008


POTONGAN 2 POTONGAN 3 D13-150
D13-150
D13-150
D13-150
D13-150
D13-150
D13-150
D13-150
D13-150
D13-150
D13-150
D13-150
SIBP : RUDI HARTO, ST

D13-150
D13-150

D13-150
D13-150

D13-150
D13-150
TEBAL PLAT TEBAL PLAT
20CM 20CM Perencana :
Digambar : AHMAD RURI, A.Md
Nama gambar : Skala :

Tertera Tertera

Diperiksa oleh : Paraf

D13-150
D13-150

D13-150
D13-150

D13-150
D13-150
NOMOR :
TANGGAL :
D13-150 D13-150 D13-150 D13-150 D13-150 D13-150
D13-150 D13-150 D13-150 D13-150 D13-150 D13-150 DISETUJUI OLEH :

KEPALA DINAS PEKERJAAN UMUM


DETAIL SAMBUNGAN 2 DAN PENATAAN RUANG
DETAIL SAMBUNGAN 3 SKALA 1:25
DETAIL SAMBUNGAN 3
SKALA 1:25 SKALA 1:25 KOTA PEKANBARU

Ikatan Angin Ø16mm Ikatan Angin Ø16mm

TEBAL PLAT
Turnbackle Turnbackle 20CM
Sambungan Las Sambungan Las
Gording Baja CNP 150.50.20.3,2
BUTT PLATE F.B-50X6 BUTT PLATE F.B-50X6
Baut Ø16mm Trekstank Ø10mm Baut Ø16mm
Baut 2D10mm
150 25 TEBAL PLAT
Plate t=6mm 50
96 20CM
96
Plate t=8mm 300 Plate t=8mm
29 48 29
50 150 48
80 Kuda-kuda baja WF
200 Kuda-kuda baja WF 350.175.7.11 350.175.7.11
Kuda-kuda baja WF
75 350.175.7.11

147
INDRA POMI NASUTION, S.T.,M.Si
Pembina utama Muda
RENCANA PONDASI NIP. 19721111 20003 1 002
DETAIL GORDING
Skala 1 : 8
POTONGAN 4 SKALA 1:300
digambar no. revisi tanggal jumlah. lbr no. lbr
DETAIL IKATAN ANGIN DETAIL IKATAN ANGIN
Skala 1 : 8 Skala 1 : 8 01-09-2021 4 2
CATATAN
* MUTU MATERIAL MINIMUM :
- BETON :
8D16 8D16
Base Plate t=20mm
Angkur Ø19-600 PILE CAP : K-250
TIE BEAM : K-250
PELAT LANTAI : K-250
WF350x175x7x11
K300 K300

Stifner Plate t=10mm Begel Ø10-150 Begel Ø10-150 KOLOM : K-300


BALOK : K-250
POT. B Kolom Pedestal 35x55cm
POT. B (PEDESTAL) POT. B (PEDESTAL)
10D16
- TULANGAN :
K300
ULIR (D) : BJTD-32 = fy : 320 MPa
WF350x175x7x11
Begel Ø10-150 SLOOF 25X60 SLOOF 25X60
POLOS (Ø) : BJTP-24 = fy : 240 MPa
POT. A
D10-150
D10-150 - KONTRUKSI RANGKA BAJA: MUTU BJ 41

B
STIFNER T=10mm ELEVASI +1.20
Base Plate t=20mm Angkur Ø16-600 LANTAI BETON K-250

D10-150
D10-150
Grouting sement

TEBAL PLAT
15CM
B MUKA TANAH B MUKA TANAH
A

SHEAR WALL T=20CM

TANAH URUG 9 D 16 9 D 16
MUKA TANAH 9 D 16
5 D 16
5 D 16 9 D 16
5 D 16
5 D 16

D10-150
D10-150
LANTAI KERJA T :5 CM

D10-150
D10-150
SIRTU PADATT : 10 CM LANTAI KERJA T :5 CM
9 D 16 5 D 16
9 D 16 5 D 16 SIRTU PADATT : 10 CM
DETAIL SHEARWALL

TIANG PANCANG 25X25


FINAL SET KEDALAMAN 20.4M
TIANG PANCANG 25X25
LANTAI KERJA T :5 CM (HASIL SONDIR) ATAU PADA
FINAL SET KEDALAMAN 20.4M
D10-150 D10-150 TANAH KERAS >200 KG/M2
D10-150 D10-150 SIRTU PADATT : 10 CM (HASIL SONDIR) ATAU PADA
TANAH KERAS >200 KG/M2

D10-150
D10-150

D10-150
D10-150
TIANG PANCANG 25X25
FINAL SET KEDALAMAN 20.4M
(HASIL SONDIR) ATAU PADA
TANAH KERAS >200 KG/M2

Peta Orientasi lokasi


(B1) 25X50

D 16- 150Cm
LOKASI
K300 (B1) 25X50

D 16- 150Cm
D 16- 150Cm
PENULANGAN PLAT
PEMBALOKAN LT.2

D 16- 150Cm
D 16- 150Cm
SKALA 1:300

D 16- 150Cm

DETAIL P2
SKALA 1:30
DETAIL P3
DETAIL P1/K1 SKALA 1:30
SKALA 1:30

BALOK MIRING RAMP

SLOOF 25X60

MUKA TANAH
Base Plate t=20mm
Angkur Ø19-600
9 D 16 5 D 16
Base Plate t=16mm
9 D 16 5 D 16
Angkur Ø16
WF350x175x7x11

LANTAI KERJA T :5 CM
WF250 x100x5,5x8
SIRTU PADATT : 10 CM
Stifner Plate t=10mm
Stifner Plate t=10mm
TIANG PANCANG 25X25 Kolom Pedestal 35x55cm Nama Proyek/ lokasi
FINAL SET KEDALAMAN 20.4M
(HASIL SONDIR) ATAU PADA
TANAH KERAS >200 KG/M2 K2. WF.200.100
K1. WF.350.175 PEMBANGUNAN
GUDANG JNE 2 LANTAI
Jl. Lintas Timur/ Jl. Kapitiang,
(B1) 25X50 Kel. Sialang Rampai Kec. Tenayan Raya
Pekanbaru-Riau
B1 25/60 ( TUMPUAN)
(B1) 25X50 BAK 5-D19 Pemilik : Paraf
KONTROL

D 16- 150Cm
HUI MANDRA P. HOEIPAMAJAYA
SUMUR PT. JALINAN NUSANTARA EXPRES RKN
RESAPAN
D 16- 150Cm
2-D13 No. SIBP : 004.B.1.2008
DRAINASE SIBP : RUDI HARTO, ST
LINGKUNGAN AIR PEMBUANGAN
DARI : - DAPUR Perencana :
- FLOOR DRAIN KM
3-D19
Digambar : AHMAD RURI, A.Md
- TALANG AIR HUJAN Nama gambar : Skala :
BATU
MANGGA Tertera Tertera
RENCANA RING BALOK PASIR
B1 25/60 (LAPANGAN)
SKALA 1:300
DETAIL P3A IJUK
SKALA 1:30 Diperiksa oleh : Paraf
3-D19
SUMUR RESAPAN

2-D13

NOMOR :
TANGGAL :
5-D19

DISETUJUI OLEH :
Muka tanah Muka tanah

Muka tanah Muka tanah


KEPALA DINAS PEKERJAAN UMUM
II
DAN PENATAAN RUANG
KOTA PEKANBARU
Muka tanah Muka tanah

Muka tanah
I

POTONGAN II-II DETAIL BAK KONTROL POTONGAN A


DETAIL SEPTICTANK INDRA POMI NASUTION, S.T.,M.Si
POTONGAN I-I
Pembina utama Muda
POTONGAN B NIP. 19721111 20003 1 002
digambar no. revisi tanggal jumlah. lbr no. lbr
01-09-2021 4 3
CATATAN
* MUTU MATERIAL MINIMUM :
- BETON :
PILE CAP : K-250
SR SR SR SR TIE BEAM : K-250
PELAT LANTAI : K-250
KOLOM : K-300
BALOK : K-250

- TULANGAN :
ULIR (D) : BJTD-32 = fy : 320 MPa
POLOS (Ø) : BJTP-24 = fy : 240 MPa
NAIK

NAIK
- KONTRUKSI RANGKA BAJA: MUTU BJ 41
TERAS

NAIK

NAIK

LOADING DOCK
+ 0.90

NAIK
LOADING DOCK LOADING DOCK LOADING DOCK
+ 0.90 + 0.90 + 0.90

NAIK
SELASAR
-0.97
SELASAR
-0.97

SR SR
ramp
Peta Orientasi lokasi
ramp

LOKASI
RAMB
0°28'11.9"N 101°33'13.0"E
RAMB

RENCANA INSTALASI AIR


SKALA 1:300

RENCANA INSTALASI LISTRIK LT. 1


SKALA 1:300

BALKON
TURUN

VOID
Nama Proyek/ lokasi

PEMBANGUNAN
GUDANG JNE 2 LANTAI
Jl. Lintas Timur/ Jl. Kapitiang,
Kel. Sialang Rampai Kec. Tenayan Raya
Pekanbaru-Riau

Pemilik : Paraf
HUI MANDRA P. HOEIPAMAJAYA
PENUTUP DINDING (ACP) PENUTUP DINDING (ACP) PENUTUP DINDING (ACP) PENUTUP DINDING (ACP) PENUTUP DINDING (ACP) PENUTUP DINDING (ACP) PT. JALINAN NUSANTARA EXPRES RKN

No. SIBP : 004.B.1.2008


SIBP : RUDI HARTO, ST
Perencana :
Digambar : AHMAD RURI, A.Md
RENCANA INSTALASI LISTRIK LT. 2 Nama gambar : Skala :
SKALA 1:300
Tertera Tertera
RENCANA PENANGKAL PETIR
SKALA 1:500 Diperiksa oleh : Paraf

NOMOR :
TANGGAL :

DISETUJUI OLEH :

KEPALA DINAS PEKERJAAN UMUM


DAN PENATAAN RUANG
KOTA PEKANBARU

LIGHTNING WEIGH 2KG DETAIL LIGHTNING PROTECTION


INDRA POMI NASUTION, S.T.,M.Si
Pembina utama Muda
NIP. 19721111 20003 1 002
digambar no. revisi tanggal jumlah. lbr no. lbr
01-09-2021 4 4

You might also like