Professional Documents
Culture Documents
Centerline Cuts and Embankments
Centerline Cuts and Embankments
Centerline Cuts and Embankments
Yes. The site location was previously a banana plantation, wherefore the drainage
strategies and the drainage system required is different. Implementation of
drainage plan is required to ensure that the runoff water is efficiently controlled
and disposed of. Where possible, land should be shaped to allow the ready
movement of water off the block and into a system of waterways.
Yes.
6. Erosion protection measures for back slopes, side slopes, and ditches, including riprap
recommendations or special slope treatment.
Yes.
Yes.
Fills
10. Recommended fill slope design?
Yes.