Method Statement For Reinforcement Cement Concerte Work

You might also like

Download as pdf
Download as pdf
You are on page 1of 18
ProwEcr STANDBY SRU & ADDITIONAL TANKS, IOCL PARADIP REFINERY LSTK - 2 Package (Group ~B) : Design & detailed engineering, supply, fabrication, installation, painting, calibration, testing, mechanical completion, PACKAGE re-commissioning, commissioning ncluging piping, electrical, instrurmentstion, fre protection system, cathodic protection system, tank foundation Works, ‘dyke and other civil works for storage tanks at 1OCL Paracip fefinery, Osiaha, T M/s. India Oil Corporation Limited (Refinery Division) Poradip Refinery, Odista, India WW/s. Techni India Unite, Technip Centre, 19, Veachery Malin pac ey Guindy, Chennal - 600 032 M/s. Bridge and Roof Co, (nda) MAIN AGENCY / Limited ‘CONTRACTOR 4th & Sth Floor, Kankarta Centre Russel Street, Kolkata ~ 700 071, Proiéct no. | 080557¢ axrcee ro, lennmncveesmeneemse | reno | ons, /b0c, | Method Statement for Reinforcement Cement Concrete Beschioron | Work DocumentCetegory: Approval amie ea) etl [© #2021) Third submission | Subhendu [Jayant Sahani| — F.Mallick | : Layek | [509.2021 second susmissionlcouax nono ANIL NARKHEDE | KAMPLES MANDAL Ls 107.2023] First submission | rasoutT ADAK | SAMUSSWAL SEN| KAMALES MANDAL APPROVED Rev] pate | pescriprion | prepareD | cHECKED i, 'SRU & Additonal Tankages Project at Paradip Refinery Ca OD eee. PROJECT sao [ = Group-B z INDIANOILCORPORATION CuENT LIMITED Wethod Statement for poses Docume: Rane Retvorcament cement | gggtsne®_|anvrou-tocl/oe0357/a0087/ms-06| "2 ‘conrenr .oMEcTVE 2.score 5. RESPONSIBLTIES |LREFERENCE CODES & SPECIFICATION 5.GaaDe OF concRETE 6. TVPES OF CONCRETE MNES ‘CONCRETE Mix PROPORTIONING a. parcHing 9-CONCRETE Moan 10, TRANSPORTATION, PLACING AND COMPACTION OF CONCRETE 21. CONSTRUCTION JoMTS 22. SEPARATION JOWNTS 15. EXPANSION ISOLATION NTS sawarersrors 15. PROTECTION OF FRESHLY LO CONCRETE ascuRNG 17 FNsHNG OF CONCRETE {8 PROTECTIVE COATING TO CONCRETE (SUB STRUCTURE) 19, EPA ANO REPLACEMENT OF UNSATISFACTORY CONCRETE 20-FoRMWoRK 21STAGING SCAFFOLDING 22 POSED / ARCHITECTURAL CONCRETE WORKS 23. REINFORCEMENT 2a. LeaR TEST 25. QUALITY REQUIREMENTS y TPM: ‘SRU & Additional Tankages Bssun. Prosect | “Project at Parilip Refinery “croup B ae ess | INDIANOILCORPORATION pen — J CLIENT LIMITED Eegkerenrcomcre — [_flee | ayrpncrocl/oso8s7aons 1-05 Reinforcement coment Bay 7 ‘Concrete Work eeaee 26, SAFETV REQUIREMENTS sLomecrve ‘odie & describ the guideine tocar out execution of relforced coment concrete worksSRU & Ationl ‘ankage Projectin foundations, ths, ete as requed as per FC drawings. 2.SCORE octntend to execute revamp of thei Refinery as prt ofthe Mederazation of the fiery. W/s BER she EPC contractor forthe erent project required to exeete th ACE Wars the Units under the sexpe of this rojak The procedure coves Concrete work nd uses the requirement of mates, mix ropotoning. acing tof al ypes of asin and precast concrete sed in foundations, underpound and above {rund structures lors, pavements et. ay spel requemantss shown or notedon the FC drawings on Shallsupersede the provisions of this procedure S.RESPONSIBUITES ‘ridge and Rot Co tl) td, shall be responsible forthe overalimlementation ofthis wok procedure Uisor/eoorinton with the enginern-charge to ensure the efficent control and safety procedures, |The cualty Manager salle response to review the operably of he procedure ard Conduct te ws during work execution on 2 regula bas 1b, The Contraction Manager of Tein wl be responsible o ensure the ts drawings tobe {alable at ste work loeston for Reltoreed cement concrete works «The Disipine ad Engineer wil be responsible for coordination with TEW/OCLSubAgencies and censure sient esource aval 35 er pon, cally progress reporting oconstructon manager. 14 TheDisciine Fed engineer il be rexpenable or rangement rele to execute the job a er AFC ravings standards Specietons and al aches fered for spacton (spe I) ‘& The DacimentContiale wil be responsible be For scanning ofthe of approved documents a sue the drawings wth ates revisor othe sub agencles/ilé Eginerandvevert Bock the obsolete 44. Stety Manager Supers will make sure hata the safety requements ar files prie to start {nd during of he ob Jo Safty AralysSafet TarkAsgnment wil be sttyiplerentes. AREFERENCE CODES a SPECICATIONS stot Indian standards refered: Construction of enforced concrete work Spedeation no. 280557C- 000. 43$5-1700-001 shall ben accordance th the Indian Standard Code of rat for Pisin ard Reinforced ‘onerete™ 56: 200 slog with alamendments a date another relevant codes mentionesthren, 4.1.1 Pain and reinforced concrete: Standard pesteaton or Chi & Suucural works 4.1.2 For UquidRetining Stuctures, peceation sal be apple, 14.1.3 For Conroe Penetrating Corrosion Inhibiting Admiture sper speciation \ \ PE = | SRU& Additions! Tankages ED v1. PRosect | “project at Parad p Refinery ‘Group: B cesta a INDIANOILCORPORATION tain Ses 7 NATED cuENT Mathod Statement for ane ‘Bosumenna. nN Meriecemene cement | ggaelase®* | yrexL-tocl/os05s7C/40087/"S-06 | ““c ‘Conerete Work shot applable {44 terior eonerete vi coment, orzlanas, Fly Ash, Ground Granulated Blast Furnace Sg, Son, Course aeregte, Water, ete shallbe as described in Spctication {45 Materia oll enforcement, embudent, insets, water bars esha conform to Speciation [4.6 Matai tobe used as ade to concrete shal anfrm to speteston 41715 399:1970Speieation for course and fie agaregates fom natural sources for concrete 4.85 14994991 Potand slag coment 41.918: 082 990 tacking and Storage of Contraction materials ad components ‘S.GRADES OF CONCRETE “characterise Compresive strength for diferent grades of conrete sale pe following ble Tabet = — Group Grade ‘characteristic Compressive | Strength of 150mm cube at 28 days (N/mm) wa 30 =| ordinaryeonerete [ns 15 = mas = standordooneete [ws mes ao m Mas 45 [mo Ed at ao ‘TBE OF CONCRETE MK = - : vat Tanager _— rower | fojecu Parc Rein ‘Grou a INDIANOILCORPORATION x SS lu unre Vethod Statement for Prajeoto panisena I Renoreerert cement [pote [aRProCleH@357c/4087mS-04 Unless there noted on drawings, a leap oneet shal be af Nomina Mi type and enforced concrete shal be Design Mic type ‘Nominal Mix Concrete ‘his cnerete shall be made (without preliminary tests) by adopting nominal concrete mx withproportons of mattis as speed ini: 455, 8, Design Mix conerte ‘Them shal be designed as pe: 10252 in an approved laboratory to produce the grade of concrete having the recited worabit and characterise srengh not less thanapproprite values gen iable-. The targetmean svenath of conerte mix shale equa the characterise strength pls 1.65 tines the standard ‘deviation. However, the source / quality of materi changes or heres a beak the cont of ontruction, theEaineerin Cargeshall ask fora new design mix respective of the rade cf concrete ‘eauiredto be produced a er characterise strengtnertev, minimum cement conten and "aku in ‘rater cementation the dein concrete shal be sy maintained as stipulated in 6456, Speciation no '80557¢-000-1SS-1700-001 Proportining shall means the proces of determining the proportions ofthe various grein toe used to prose concrete ofthe required worabty whan fesh/greenandstrength, durability surface finish when ardned The eqired information shal be collected rie to design ofthe concrete mi. The Engineer i Charge shal vay the strength ofthe concrete mix before ging hi sncton of suse. f dung the execation of the wor, abe test show loner strengths than quired, the Enpneerin-Charge shal ode sh al mes to bemade bythe Contractor. No eli to ae the ates of concrete workshal be entertained eto sch changin mie Variations Ary vrationncement consumption sal be taken ito consideration or materia coro, Preliminary esis shall be establshed well ahead of sar of work 2) Msimum Density Sable proportion f sand andthe diferent sie of coarse aggregates foreach rade of conzet shall be selected to gv a8 nearly 2 practicable the maximum deny as pe douse 10.23 of S86. Tis shall be {etermined by mathematical means, laboratory tests, ld asad stable changesin area radaton 1) Consisteney ‘The conrete shall hve conssteny sich hat shal be workable ia the requled postion and when properly rate flows around enforcing steal embeded fate, ‘1 Wortabity ‘Workabity f Concrete" shall be as pe IS: 56. Project Speciation 895570: 000-JSS-170001 4) ourabity o “Omer ‘SRU & Addit Tankages @: Prosect | “pyoject at Paraip Retinery — ‘Group-B a z INDIANOILCORPORATION ncn es eae LIME=D. Wethod Statement for ee DasmeniN. a Reinforcement Cement | astnac”_| BR/TPN-1OCL/080557C/40087/HS~04] Fr acheingsuficiently durable corte strong, dense aggregates, low water cement ati nd adequate cement content alvays be used. Workabiltyof concrete shalbe such hat concrete canbe conpltaly ampacted withthe means aralbl. Leak pret formwork shall be used soa to ensure no los of cement slur during pouring and compaction Cove reinforcement shaluniform. Concrete mix design sallavays ak ito aceunt the typeof cement, minimum cernent content ieespetve ofthe type of cement and maximum water coment ato 3nd rnimum rade of conerete conforming to environmental exposure condions as par IS 456. & Project Speteation No 608870-000-J8S-1700001. ) Water Cement Ratio ‘Once 2m rclung ts water cement rato, hasbeen determined and approved for us by the ngseee ‘charge, wate cement rato shale msntine. The Contractor shall determine the water conten ofthe _azarenntesreqvemty a the progress, © amount cf mvng water al beaded sos tomalaain the {Spproved water cement ratio, Maximum wate-cement aio shal be er Tale of: 456 for ilerent ‘exposure contin. ‘The minimum cement content as mentioned ia Tbl 5 of: 456 shal be alte For agregnts other han 2am nominal maximum sz as defined in Table 6 of 456, Where spectied, ipl concrete penetrating ‘errsion ibn Admistre in enforced concrete as per Techni pectin Ne. BIS87C-900-700- (01 shale used fr protecting the reitorement rom covesion ‘its to Deeterous Constituents 15-456 habe flowed. 6) ube Sampling ad stump test (et ot onae ne work Taber of sales i Te Tape eT og 2 Sampe (aes) ey Sia aT H=60 Sample (2a) aan | a Sipe las oe atonal sa socesch sional oor part ees NOTE Alas oo sags akan fom cach St wire conc proaod at "eens posi sl sucha ety mind concep, Heaney areng nay bo aad upon lb supp and pacha. - | “Camnats | PC: ‘SRU@ Adaitional Tarkages—|~ BD vce, PRoseCt | “Project at Paradip Refinery ‘Group: B a INDIANOILCORPORATION Inca cune COMED. Hethod Statement for Paice DosR aecno Reinforcement Cement | gnssnac_| BR/TPI-10C./080857C/40087/H5-04] " ‘crrsive coating a per he design bass or il work Applicaton salle cared es per mauTecturers Specs. ~ ¥ Ve re ce Tia amatToe 2 a ntl = INDIANOILCORPORATION = = eae ‘epar shallbe made as soon as posable afer he forms are removed and before the coneete becomes 09 hat wth aor persion am the Engineer in Charge, n wring + stone pockets, sepregation patches and damaged ares shal be chipped out andthe edges underaut Sah to orm a ey Allove mater hal be washed out before patching. No excess water hall beet Inn cay, but the concrete shall be rp. kgood bona between the ptch and parent concrete sha [abtained by spiking dry cement onthe wet surface or by throwing mortar wth fort onto the ‘ct conerteror by of rush ina coat of Gack cement grout of abou 1: (1 cement ond) just before “pphne the potching materia Before this har drie, theremainer ofthe patch shalbe led with Morar or onerete, depending onthe extent ofthe rapa. Cement concrete/mortarwedln pa of ‘Cipoatd sarees sat be made with ecment rom the sme source as that sean concrete and ended Seth sufficient amount of white Portand cement to produce the same colour asin the adhinng concrete “The popervons of agent shal be same ashore ued paret concrete. The mora sal be 38 dry ‘Srpossble and wel compacted into the vty. Alig shall be tightly Bonded tothe coneret and shall besoune, re rom shrinkage cracks aftr the iling hasbeen cred an died «+ fonmurepattrdened cone, ees lomorkbesng tah a the wes ofthe city sal be rode Carte shale ppd ut 0a Sogth of a es 100% an preterby 150 Mar sa ede a sures thar brash before acing the conte Danagdrenerement alae — ‘Shen wh new te! soto masta the orga strength. Aaalonal enforcement, i reuked ia he patch, sel be provided a per the Instructions of Engineer n-hare «+ Roproved epony formation for bonding fresh concrete used for reals wth already harsened concrete ‘all sed byte Contactor asked byte Engineer in Charge. All epar work ue tnon- Conformance o non-adherence to speciation, alowed by the Engneer--Charge, sl be cari out free of cost tothe one. + For anyother major repar/éamage separate procedu tobe submited 20, FORM WORK .Ganecat Forms for coezete sal be conforming ts: 6461 (Prt ) or tel ora rected by the Engineer in-Chorge and thaleve smooth and even surface afer removal ther res dested by Engineor- Charge, the Contractor shal prepare, before commencement of ual wrk, (design anc rains for formwork and get them approved the Enginoer in Charge. Fr deta regacing (dag, detain et, tference may be made tS: 687, Fem work ants supports shall nai their torre postion and be tocoret shape and profes thatthe final concrete structures with the iis oF ‘mensional terances specie unless equed others, for funcionalaesthelc reasons, The edn ofthe Engineer: Charge sal be fia na bing inthis rena «+The formoork shal be tue rig pd adoguatly races both hrizntaly 25 wells dognay The forms Ihatfhave smooth and even surface andbe suet songto cary, without deformation, the dead ‘righ the green concrete, waking lod, wndlondandalso he side presure exertec bythe geen e ~ Caner [PHC =) SRO E Aaitionat Tankaass ED sx. Prorect | “Project at Parad Refinery en Group B as a INDIANOILCORPORATION nian = a cMTED Wathod statement for | Pasjeea. Dasa, —— tae | Asinfrcement cement | usac_[BA/TPU-toc\/080387C/4o087ms-04| "+ Aefaras racial, mp salle used thal the fers togather, Where se of als is unavoidable mum uber of nal sal be se + Projected part of all shal ot be bet or twisted or sey withdrawal. Where through rods are requred tobe put toad the frmuork and maintain accurate mension they shall vay be nsrted ttroush a precast concrete block (of ame mix proportion alto be wad for cocreting) wth 2 hough halo bigger rater. Te Precast black hal igh ft agaist line aces of former The les et titer the withdraval of Ue rode salle fly grouted with cament-snd rar of same proper 3 that teed for coneet, However, use of such recast ck shal inno cas ipa the esd appearance or ‘uray ofthe sructre, No suche Fs shal Be used in any gud retining or basement structure. + ‘Tewire salle permite only upon speroval fhe Engineer--charge and sal be eu of sh ith the face of the concrete or counters led ad frshedin he aceptable manner es specie. + Formjcints sal nt permit an lelage The formwork shalbe strong enough to withstand the eect oF rations practically wathout any efecto, bulge, stron or loosening of ts components + Avert! wall fos may be designe and constructed forthe required adequate presse. The Contractor shall ensure that the formuorkis adequately tong and study Aloczotal forms shall be ‘designed and consteucted to withstand the dead oad of the preenconerete enercerer, equipment, tmatrl erbedrert and minum ve load of 2.0 KN/m2 tspectin of Forms “ermporary openings hal be provided atthe base of clam and wal forms an other laces neessaryto Faciitatedeaning and inspection Before concrete placed al forms shall be crea inspactet to ensure that theyare proper pace, slicenty ged and tehtthorouhtyceanee, propery treated and ree ram orlgn Imaterl The complet formwork shale spate and approved by the Engineer n-Charg before the - ‘einfcment bars ae placed in postion. When for appear tobe unsatisfactory n any way ether before ‘or during plcing of concrete, the work shal be stopped util the delecs have Been | rece spr the strton of the Engineer in Chae. leaning and Teatment of Formwork “The surtace for that woud come n contact with concrete sal be wel eated wth de aparoved non inn form release agents such a5 at sap, sl, emulsions et Release agent hall be appl so aso provide thin form coating to the fos without coating the enforcement. 4. hamfers an ilts ‘ntcorners and srl hl ba formes wth 45 depre mouldings to form chamfer or lets the ished oncete he standard dimensions of camfers and lets, nes thera or deta oe spaced shal de 25x25 Care shal be execed to ensure acute moulding, The diagonal fae ofthe moulin hal be | ane o surfaced tothe same texture asthe forms to whichitsattached i a ~ Gamer [PNG ol Tg BD see, PRosect | “Projet at Parsdip Refinsy ‘Group B er = INDIANOILCORPORATION on | Se a Hethod Statement Tor Reinforcement Cement Concrete Work = Taran ae obese [enzo toc e808 toons] | Reuse of forms fore reuse alfoms shale thoroughly srapsed, cleaned, examined and when necessary, epied and ‘retreated, before resetng, Fomor stall not be reused dectard nfl or un sencable one Enncer in. {.nemovalo Forms/Srpping Tie Inthe determination of time fr removal of forms, consideration shall be given to the locaton and character of thestructres, the wether and ther conto incuding the etn and curing ofthe concrete and mater ied in the mi, Forms and thee supports shal not be removed without the approval ofthe Engineer in Charge fos shall at be released uti the concrete has achieve a strength of at tice tests to ch the cents may bo subjected atthe time of removal. The formwork shal be removed without shock and methods form remota ty to couse ovr stressing ox damage tothe cnerete shal not be adopted Supports shall be moved such {manne aso permitthe concrete to uniformly and radually ake the sresses duets oun wh n nora cumstances when average a temperature exceeds 15 dezee Cale during the pid unde cnaereton ter pouring of concrete and where ordinary Portland cements sed, forms may general be removed os por 154562000, , ! For other cements, the stripping time recommended fer ordinary Portand cement shale stay modied spertheinstrctons of he Enpneer in Charge 19 The number of props et under, their ses, supporting arrangerent and dspostion sal be sich as tobe abet safely cary the ful dead loud ofthe sb, beam or arch asthe case of maybe tageter tay tne ood aly to ocur ding ering or futher construction. ') Where the shape ofthe elements such tha the formwork has re-entrant sles, the form wor shall be ‘removed as oon pose afer te concrete has Set, to av0d svinkage cracking occuring ut the resraintimpore, wor rapt hardeing cement, 3/7 ofthe above mentioned periods shal be considered subject minimum oF ove Fo Portandporlanaor low het cement, 10/7 ofthe above-mentioned periods hal be cons deed 24. Stanin/Satoling StapingSatoing sal be propery planed and designed by the Contractor Use of nl see tubes is ermted for taging/cflding. The Contractor shall it reviewed by Engineer in Charge before ammencement of work Whe designing and during erection of eatfoldngstgng, the following measures shale considered (a) suficiensts renderings in addition to base plates sal be provided pty e ¥ Caner [PN SRU & Additonal Tanaaes es Prorect | “projec at Paradp Refinery ‘Groupe B rior a INDIANOILCORPORATION Indian = ‘cuent Mtb Tethod Statement Tor = Dasa pal BN Reinvorcement Cement ‘ervrPIL-toci/080557c/40087/MS-04| *"¢! ‘Comerete work ae where seafelding erated on st grounds (0) Adjustable bases to compensate fr uneven ground shal be use. {o Proper anchoring ofthe scaffoling/ aging at reasonable intervals shall be provided in each etion with ‘themain structure wherever avaiable (o}ingonal braces (ct Worizona races shal be provided o prevent the safldng/staging rom rocking shal beprovded ontinovay rm bt to top between two adacent rows of pris (Te scatding/taging shall be checked at every stage fo plum re, (a Wherever the xattolding/tagns found tobe ou of plumb ln shal be smartled ancre-eected afresh defor shal not be phys Fore ade orig in ine wth (0) Ants ad ols shal be propery tehtane and ar shal be taken that alclampsfcuping ae fy tiene to 200d snags. (For any major structure, design clelation tobe submit. 22, NPOSED/ARCHITECTURAL CONCRETE WORK | Form Work Foxmwot shall be of high ality, ate shal be taken to arrange the formsso thatthe ints etweon forms Correspnd wth the pater inceatedin the drauigs The fers shall be buting with each oerin straight lines, the cores ofthe bards ing tral a lt angles. Theos between the forms shall os inthe two (dection aright als, These of fos shal be elected sto exact math th the patter of forms Impression onthe concrete face inated in the drawings. Maru care shall be taken to make the form work ‘terior of sal 9 be ud for teatmat of forms. The Cortratrsallbe permite euseof forms ‘brought new onthe work place en forms are propery ene fr, stored and treated after exh vse. The Engineer inchage may, ats absolute dseretion, order removal of any forms considered untae for wen bnsing Repairing to expose concrete work shal be avoided. Rendering and plastering hal not be done. Minor | rapa, unvoiable shal be done with the writen permission ofthe Engneer-e-chaee. | 23, RRINEORCEMENT $ ¥ Caner PVC: ‘SRU & Adaiional Tankaes PDs, Prosect | “Project at Paralip Refinery Groupe B [ons a INDIANOILCORPORATION, ‘naan Ss LIMITED. ~“Nethod Statement for | peajcaano DasERINS. Rune Reinforcement coment | guosrac roct/080557¢/40087/MS-08 | “The contractor shall develop the bar bendng sched fora RCC structures) structural past no waa costo ‘the Gamer and hal get reviewed bythe Engineern-harge. Reeforement shall be cut and De bet to shape 18 pee dimensions shown athe bar bending schedule ravings. ‘+ strlehtoning ating and Bending Froctdut forcing and bending shale as given i 52502. Bas sallbe bantin slow ond regular ‘ovement to avoid fractures by mechanical means oy. ease at are supped inca. they shal be Sroothy steghtene without ny knks, ar hall Be cat & bend in a ar Geng Mache. Bars which ‘evelops cracts or spite after banding hall be rejected. cond Bending of enforcement bts shall be ‘olde but when reiforcaent bars ace Bent ase at constuction jit and afterwars bet back into their orginal poston, cre shoul be taken ensure tht at note i rads of th bens than G6 times bar eameter for high strength deformed bars. Care shal ao be akan when being beck the dowel basta ensure that concrete around the bars not damaged. Al bas shall propery aeeed for easy identification. Placing and Fag Avebforemet shal be cleaned to ensure freedom from laos mils, losers, olor releasing ‘gents gente or any other ham materal before lang them In pesto. Reinforcement shal ot be ‘rrounded by concrete unas fre from al such materials Rough handing 2 of éropping of Feiforcemen rom height shal be avoided, Al rmnforcemen shal be ed inthe covert postion and ‘halle propel sbppated to ensure that dsplacement wil not occur when the conereels placed and ompected “the uncoated reinforcement bas shal ete at ever intersection by two strands of 16 WG backsoft | annealeg binging wire, The Epony coated enforcement bas shal be ied wth 2 strands ct PVC coated Gt SW wre at every intersection. Crosing bars shal not be tack welded fr asembl of forcement. The reinforcement bars shall be kept in potion by using the following methods: Incase of bam and sa constuction, recast over blocks (havingthe sare sand contens asthe concrete wh shall be placed) thcknes equal tothe pected covers shat be placed frm between the bars and foums ato secure and maintain the specie covers ove the enforcement. When einfrcement bas ae placed or more oyers in beams the vertical stance tetween the horizontal bars shal be rsintained by introducing spacer bars at to 1.2m cate to cet. nese thick rate ple caps & having two or it lsyer of reiforcarent, the vetealastance Baten the horizontal bares be maintained by introducing stable cis, pacers, Incase of nts and wal the vertical bars stall be kept in position by means of timber templates with slots aceratel cut nthe. The trates sallbe removed ater the concreting has bee» done below. {ages partons of enforcement brs sha not be subjected to impacto ough Rang ang workmen wil aot de permitted to cimb o extending brs unl the concrete has atainedsulicent strengths that ‘omoverent ofthe brs inthe concrete possible e ‘SRU & Additional Tankages ‘Owner: | PMC! la” oo. | == ‘Group: B = INDIANOILCORPORATION Incianit Ses cuenr LIMITED Hethod Statement for Projeawo, J Documenna—— Tae Reinforcement Cement | ggosyrac’”_ | BR/TPL-t0cL/080557¢/40087/MS-06 | ®*%? Concrete Work - + Seling/Overapping ‘nt bars ful ent hall be weds shown nthe rowing, Bt where this cannot be dor overlap of bas shal be done a5 drected bythe Engineer-in-Charge. The overapringbassallbe ted wh evo stone, of 16SWG blak soft annealed bing wire. The ovrap skal be staggered or diferent bow apd lost at nt alang te spon where nether shes nor banding moments maximum Length stone tev yen, Technip general nates of conerete + Welded Joins Weling ot renforig bars shall nt be permited without the witen permision ofthe Engheein Charge Where welding of enfreing bars i permite it shall be In accordance with the econmentntion: of 2758 andi: $417, Welded joints shall be located table taggered potions este sal te meas oe rect bythe Enpnerin-Charge to prove thatthe ts are ofthe fl tenth ofthe bars. Maxim one welded joint shall be alowed per bar “Tolerances on Placing ofRlnorcerment 15456 2000%o be flowed 2.uEAK TEST teak tf laud retii strutures as wll as peed in FC dain shal be caedot, Weer shale fie fora al depth and shal be etsined for minimum 28 hours. Any leakage found sat be coe Dressue posting wth approved arouting material Test shal be repeated tin leakage scbsenea 25. QUALIT REQUIREMENT *Alconponents of equipment shal be recent calibrated ain good woking codon dung pouring andaterpouing. + Athenecessary concrete pour cards and checlstswllbe fied up ding pre-pourng 26, SAFETY REQUIREMENTS 1 hekthe underaroundacties tke electrical ables, pipe ines, structres ad other tty sens * Ensure the perenne ae provided vith appropiate PE (ney shoe Helmet watherap, Cloves tee rotecton Cover al reflective jackets dung night shit and Eafe Proper iting ana Housekeeping mandatory. Ensure proper housekeeping on day basis without al Ensue to cpl the valid and required necessary work permits at werk location on dpa board Regula tol box meeting shoud be conducted and wok speiic tsk instruction fo be ernie . once workman's hte 8 athe woking ares cordoned of wth hard barcding during concreting pplabe | Inaon to above points all works tobe executed as per the ate revision of Safty a standodee, | ‘rocedues anda instructed by Salty Ofc, ee ee

You might also like