Inspection & Testing Plan For Installation of GRP Pipes
Inspection & Testing Plan For Installation of GRP Pipes
Frequency of Applicable
Inspection THIRD
Inspection / Test to be carried out Test / Acceptance Criteria Specification / Control Data / Forms
Method JEC WINNER PARTY/SITE
Inspection Standard
LAB
Specifications/appr
Prior to start of oved material Ref. Approved Shop Drawings
1.2 Drawings Engineers Approval N/A H H N/A
work JEC-C1040-SD-ME- IFC Drawings
DR-SP-00
Specifications/appr Approved Method Statement
Prior to start of oved material Ref.
1.3 Delivery of GRP pipes Quantity verification Visual R S N/A
work JEC-C1040-SD-ME-
DR-SP-00
Dust and Dirt protection Approved Method Statement
Prior to start of Manufacturer's
1.4 Proper storage and proper cover.Not over Visual W S N/A
work stacking
recommendation
No Damage material, Specifications/appr
Dimensions / Sizes, oved material
Prior to start of
1.5 Material Inspection Marking on material, Material submittal Visual W W N/A
work
As per material
approval
1 BICC-P1122-FM-000 8rev.00
Inspection & Testing Plan for Installation of GRP pipes
Ref. P1122-0000-GEN-ME-ITP-0150-03 Rev. (03) Form Issue Date: 13/06/2022
Frequency of Applicable
Inspection THIRD
Inspection / Test to be carried out Test / Acceptance Criteria Specification / Control Data / Forms
Method JEC WINNER PARTY/SITE
Inspection Standard
LAB
2 INSTALLATION PHASE
Approved shop
Visual check
drawings/material submittal
satisfactory, proper
GRP pipes are installed in correct location as per As per approved and manufacturer
2.1 For each location size pipes and Visual R S N/A
approved drawings and equipment schedule shop drawings recommendations and check
accessories free of
list Ref. P1122-0000-GEN-
damage
HV-CK-0002
Specifications/appr
Visual check Approved shop
oved material
satisfactory, as per drawings/material submittal
2.2 Below Ground Drainage Gravity test For each location Visual R/W W N/A
approved material and manufacturer
submittal recommendations
No Damage to manufacturer's
Final inspection of complete installation including pipes/accessories and recomm.,Proj.
2.3 For each location Approved Drawings Visual R H N/A
identification prior to cover up works installed as per Spec., Approved
approved SD SD
Visula check
Approved shop
satisfactory, proper As per approved
drawings/material submittal
2.3 Clearance for civil work For each location sizes pipes and shop drawings/ N/A H H N/A
and manufacturer
accessories free of Details drawings
recommendations
damage
As per approved
complying all the IFC Drawings and
2.3 Review & endorse Red Line drawings For each location shop drawings/ N/A H H N/A
comments specifications
Details drawings
Visual check
Functional testing of complete drainage piping satisfactory, as per Spec. & Local Approved Drawings/Specs/
2.3 Final Hand over Visual H W N/A
system approved SD and Authority Material submittal
details drawings
1 BICC-P1122-FM-000 8rev.00
Inspection & Testing Plan for Installation of GRP pipes
Ref. P1122-0000-GEN-ME-ITP-0150-03 Rev. (03) Form Issue Date: 13/06/2022
Frequency of Applicable
Inspection THIRD
Inspection / Test to be carried out Test / Acceptance Criteria Specification / Control Data / Forms
Method JEC WINNER PARTY/SITE
Inspection Standard
LAB
Visual check
satisfactory, as per Spec. & Local Approved Drawings/Specs/
2.3 Final connection with Manhole/Infrastructure Final Hand over Visual H R/A A
approved SD and Authority Material submittal
details drawings
Visual check
satisfactory, as per Spec. & Local Approved Drawings/Specs/
2.3 Testing & Comissioning for gravity system For each location Visual H R/W A
approved SD and Authority Material submittal
details drawings
1 BICC-P1122-FM-000 8rev.00