Description Moniter Hall SQM SQM Ls Subtotal Stage SQM SQM SQM SQM Subtotal Civil Work For Two Rooms SQM SQM Ls Subtotal Fence Wall CM SQM SQM SQM

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

description

moniter hall
gypsum board sqm
gypsum board (computer shelves) sqm
computer table ls
subtotal
stage
gypsum board sqm
gypsum board front side sqm
floor and steir sqm
partetion of offices sqm
subtotal
civil work for two rooms
floor tilles for the rooms sqm
floor tilles for the room two sqm
distempering of rooms internal and exernals ls
subtotal
fence wall
construction of the foundation wall cm
construction of the block was for the fence sqm
plastering of the fence wall internal and sqm
white washing of the fence wall sqm
distempering of the fence wall internal and exernals sqm
pavement tiles on the fence wall internal and externalsqm
subtotal
machine rooms
roofing of machine room1 removing and sqm
roofing of machine room2 removing and sqm
plastering and fitting of the damaged points ls
white washing and distempering of the ls
subtotal
total
tax 16.75%
grand total
22.08 $ 75.00 $ 1,656.00
18 $ 75.00 $ 1,350.00
1 $ 1,530.00 $ 1,530.00
$ 4,536.00

9.6 $ 75.00 $ 720.00


12.48 $ 75.00 $ 936.00
9.6 $ 122.00 $ 1,171.20
47 $ 145.00 $ 6,815.00
$ 9,642.20

27 $ 23.00 $ 621.00
8.55 $ 20.00 $ 171.00
1 $ 400.00 $ 400.00
$ 1,192.00

8 $ 50.00 $ 400.00
80 $ 20.00 $ 1,600.00
160 $ 4.00 $ 640.00
160 $ 3.00 $ 480.00
160 $ 5.00 $ 800.00
154 $ 20.00 $ 3,080.00
$ 7,000.00

147.3 $ 28.00 $ 4,124.40


133.1 $ 28.00 $ 3,726.80
1 $ 240.00 $ 240.00
1 $ 600.00 $ 600.00
$ 8,691.20
$ 31,061.40
$ 5,202.78
$ 36,264.18