Volume 8 of 8 Environmental Protection & Enhancement Requirements and Mycrest Works
Volume 8 of 8 Environmental Protection & Enhancement Requirements and Mycrest Works
UNTUK
VOLUME 8 OF 8
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 1
GOVERNMENT REQUIREMENTS (NEEDS STATEMENT)
CONTENTS
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 2
GENERAL
1.1 The works shall cover planning, design, construction, monitoring, auditing, reporting,
training and maintenance of environmental protection and enhancement work.
1.2 The contractor is deemed to have visited the site to familiarize himself with site and local
conditions that pertain to the necessary programme, design and execution of this work. The
contractor shall take all necessary actions and precautions during construction and
maintenance works so as not to affect the surrounding environment.
1.3 During the tender submission, the tenderer should submit their proposal regarding the
environmental requirement to protect site condition including drawings and the breakdown of
prices and all necessary as per Appendix 2 - Schedule 1: Summary of documents to be
enclosed with submission.
2.1 An EMP report should be submitted by the contractor to the P.D. and shall be approved
prior to commencement of any works on site. For projects subjected to EIA requirements, the
EMP shall be submitted after the approval of the EIA. No site clearing and earthworks shall be
carried out prior to EMP approval by relevant parties/authorities.
2.2 The contractor shall need to include the environmental activities in the work programme
to be submitted to the P.D. These activities shall contain all the necessary actions and
interactions in detail.
2.3 The onus of obtaining timely approval from each relevant Local Approving Authority on
environment shall be the contractor’s responsibility. Untimely receipt of approvals which may
affect the contractor’s design/construction programme shall not in any way be a basis/cause
for consideration of time extension or variation to the contract.
2.4 The contractor shall take serious and urgent actions on all findings and
recommendations toward protecting the environment as in the report or/and as instructed by
the P.D. Failure to do so, the P.D. shall appoint other party and all costs will be borne by the
contractor.
2.5 The contractor shall provide rain gauge to determine rain fall intensity and turbidity
measuring equipment to determine direct in-situ measurement on water quality for immediate
rectification action should pollution occur.
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK
3
3.0 Legal Requirements
Prior to the execution of the project, the project proponent/contractor shall comply with all
related federal and state legislations such as, but not limited to, the following:
m) Solid Waste and Public Cleansing Management Act 2007 (Act 672)
n) Street, Drainage and Building Act, 1974: Act 133 and Amendment, 1978
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 4
For Sabah:
For Sarawak:
a) Natural Resources and Environment Ordinance, 1993 - Chapter 84, Laws of Sarawak
1958
The current and updated legislations (including any amendments) shall be used as reference
at all times.
Where EIA/PMM is required by the said Act, the contractor shall prepare, submit and obtain
approval from the DOE/NREB/EPD. The contractor shall incorporate in his works all the
abatement and mitigation measures for environmental protection and enhancement including
monitoring and auditing.
Where required by the said Act, the contractor shall prepare, submit and obtain approval from
the relevant approving authorities for other management plans, if applicable, such as:
b) Flora Management Plan, including Site Inventory Analysis and Penilaian isi hutan;
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, 5
PERAK
d) Coral Reef and Marine Ecosystem Management Plan;
The contractor shall identify the significant environmental aspects and impacts of the projects
and execute all mitigating measures proposed in the Conditions of Approval by the Approving
Authority and in the EMP/ECR. Reference shall be made to the JKR Standard JKR/SIRIM
3:2020 Environmental Protection and Enhancement Works for Projects, for a more
comprehensive understanding of the scope of works. The contractor shall also observe/carry
out the following.
a) Limit and control site clearing works to construction areas only. Existing trees of 80 cm
girth at breast height are to be retained as much as possible and only minimum tree
cutting is allowed unless they impose danger to the public and traffic after completion of
the project.
b) Transport and stockpile topsoil to designated areas approved by the P.D. for reuse
during turfing, hydroseeding and landscaping.
c) Turf or hydroseed slopes immediately upon reaching their formation levels. For cut
slopes, hydroseeding shall be carried out together with supportive materials.
Landscaping works shall commence early as directed by the P.D.
e) Construct berm/bench drains, interceptor drainage and other related drainage works to
slopes which have reached the required formation levels. Provide temporary cover, for
example, erosion control blanket to the exposed slopes.
f) Provide and maintain sediment control measures namely silt fences, silt traps, sediment
basins, gabion walls, check dams, silt curtains, etc. Upon completion, reinstate site
including landscaping where sediment basins were located and remove other measures
which are not required as directed by the P.D.
g) Take necessary precautions to ensure that tyres of all vehicles leaving the site are free
of mud.
i) Supply and lay immediately at least to binder course layer on roads which have reached
the required formation levels including the required drainage system.
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 6
k) Preserve mangrove areas on site unless deemed necessary for construction. However,
the clearing of mangroves shall be limited to the construction infrastructural area only
and with approval from the relevant authorities.
The contractor shall provide and maintain suitable accommodation for workers as follows:
The contractor shall maintain the site in a clean and sanitary condition that complies with all
requirements of government, health and sanitary authorities.
5.1 All types of waste i.e. solid waste and scheduled wastes are to be segregated, stored
and disposed in accordance with the DOE requirements and other approving authority
requirements (e.g. the local authority).
5.2 Wastes with sharp edges are to be stored in specially designed containers and specially
manufactured for that purpose.
5.4 The disposal of solid waste and scheduled wastes shall be properly designed and
programmed to abide with the relevant authorities’ requirements.
Stormwater management design and construction works shall comply with the requirements
of JKR Malaysia, ‘Erosion and Sedimentation Control Plan (ESCP), Jabatan Pengairan dan
Saliran’s latest edition of Manual Saliran Mesra Alam (MSMA) and other relevant local
authority requirement.
Stormwater drainage shall be designed for least maintenance cost, effective initial cost and
serves its function. There shall be no flooding, ponding/silting up and erosion during
construction and after completion of the works.
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 7
7.0 Environmental Management Plan (EMP)
The contractor shall submit for prior approval by the Government, Environmental Consultant
registered with DOE/NREB or other approving authorities for preparation of site-specific EMP.
The EMP shall be submitted to P.D. for endorsement before site possession, site clearing and
commencement of earthwork in compliance with the Conditions of Contract and/or in
compliance with the requirements of the conditions of approval of the EIA report by the
DOE/NREB or other approving authorities. The earthwork can only be commenced after EMP
is approved by P.D./DOE/NREB or other approving authorities.
The EMP shall make reference to the following but not limited to:
It should be clearly noted that the EMP is a document for practical use on site by nominated
personnel and thus should be concise, up to date and site specific.
The contractor shall prepare an ESCP certified by a Professional Engineer and submit the
ESCP to the Drainage and Irrigation Department (JPS) or relevant local authority for
acceptance.
The approved ESCP shall be submitted to the P.D. 30 days prior to commencement of any
earthwork activity at project site. For Sabah, ESCP shall be approved as submitting document
for EIA approval condition. For Sarawak, submission of ESCP can be done either post-EIA in
compliance to the Terms and Conditions of the EIA approval or prior to EIA approval if time
permits.
a) The document shall be prepared in accordance with the Manual Saliran Mesra Alam
(MSMA) or Sarawak Urban Stormwater Management (SUStoM) or MS 2526.
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 8
d) It shall be amended if discharges are causing water-quality deterioration or the Best
Management Practice (BMPs) are ineffective in minimising pollutants in storm water
discharging from the construction site.
e) The document shall be revised within seven calendar days following an inspection when
additions and/or modifications to BMPs are necessary to correct observed problems.
8.1 Monitoring
The contractor shall monitor monthly water quality, quarterly ambient air quality and noise;
and vibration, if required, or as specified by the relevant authorities. All samples taken shall
be tested by an accredited laboratory. The contractor shall produce and submit environmental
monitoring reports consisting in-situ and laboratory results, sampling photographs with
weather charts and analyses of the monitoring data in terms of environmental performance,
monthly or as specified by the relevant authorities. Reference to the contents of the reports
can be made to the Standard Report Format attached in Annex E.
8.2 Auditing
8.3 Reports
The submission of monitoring and audit reports shall follow the requirements given in Table 8
of JKR/SIRIM 3. The contents of the report shall be in accordance with the Standard Report
Format as attached in Annex E of JKR/SIRIM 3.
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, 9
PERAK
8.4 Training
The contractor shall provide yearly training by competent trainers in environment for the
project team in the field of environment. This training shall include environmental law and
regulations, environmental management and conservation, post EIA and environmental
monitoring, emergency response preparedness, waste management and any competency
training approved by DOE/NREB/EPD. The contractor’s E.O. shall also provide regular
training/awareness briefing for site personnel involved in works that have impact on the
environment.
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, 10
PERAK
APPENDIX 1
ANNEX E, STANDARD REPORT FORMAT FOR EMP, EMR, EAR, ECAR,
CSWMP AND ANNEX H
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, 11
PERAK
Annex E
(normative)
Chapter 1: Introduction
Chapter 2: Policy
This chapter should detail the aspects related to the Environmental Management Unit (EMU)
and the allocations provided for Environmental Protection as follows:
b) Name, mobile phone contact number and e-mail address of environmental manager,
environmental officer (EO), engineering consultant, contractor, site supervisor and
competent person (wherever relevant and available).
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, 12
PERAK
Chapter 4: Training requirement
This chapter should provide information on plan for staff training to develop competency to
discharge responsibilities on environmental requirements and compliance. The training areas
shall include maintenance and performance monitoring of all P2M2 (LD-P2M2, IETS, APCS,
STS, management of scheduled waste), wherever relevant.
This chapter should outline the need for the EMP and detail the following:
NOTES:
1. The contents of the above table are to be derived from “Summary of Impacts and pollution prevention and
mitigation measures” recommended in the EIA Report and additional requirements stipulated in the EIA
approval conditions (COAs).
2. P2M2 are those which can be described as “state of the art technologies” or “industry best practices”.
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 13
f) Materials and waste management:
The following information shall be provided: Proposal for the management of scheduled
waste to comply with Environmental Quality (Scheduled Waste) Regulations 2005
generated during construction and post construction stages.
The following information shall be provided: name and contact details (mobile phone
number, e-mail address) of the professional who has been tasked to prepare the ERP
and the schedule for its preparation and submission to DOE.
In a particular case where the project proponent intends to abandon a project whether it
is in the construction stage or after it has started operation, an abandonment and closure
plan shall be prepared.
The project proponent is required to make a declaration (Example of format in the Table
B) that all the actions/measures/plans outlined in the EMP will be implemented. The form
is required to be filled out and submitted to the DOE together with the EMP document.
A checklist to assist the Consultant in the EMP preparation and to summarise the EMP
actionable items is given in Table C.
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 14
Table B. Declaration by Project Proponent/Authorised Person (Example)
I certify that the Environmental Management Plan (EMP) has been prepared with my knowledge
and I shall undertake the responsibility to ensure the actions plans/pollution prevention and
mitigation measures (P2M2) stated in the EMP will be implemented. I have provided sufficient
allocation for the implementation of the EMP and P2M2.
…………………………………………..
Name of Project Proponent/Authorised Person
Signature: ………………………………
Date: …………………………….
PROJECT TITLE:
NAME OF CONSULTANT:
Signature: …………………………
Date: ……………………………
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 15
E.2 Format for Environmental Monitoring Report (EMR)
TABLE OF CONTENTS
EXECUTIVE SUMMARY
1.0 INTRODUCTION
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 16
6.0 NOISE QUALITY MONITORING
Photos to verify site observations. For EIA project, aerial view photos or videos are required.
8.0 CONCLUSION
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, 17
PERAK
E.2.2 EMR for projects under the control of NREB
a) Project title.
b) Date of commencement.
a) Frequency.
b) Date of sampling/monitoring.
This chapter should include compliance to the Terms and Conditions of the EIA approval
and implementation of the prescribed mitigating measures on:
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK
18
Chapter 3: Result and discussion
b) Interpretation of data with comparison to the baseline and the previous monitoring
data.
c) Discussion.
d) Recommendation(s).
Chapter 4: Appendices
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, 19
PERAK
E.3 Format for Environmental Audit Report (EAR)
Information including:
Information including:
C MAIN REPORT
Information including:
i. Audit Finding Summary Sheet presented at the closing meeting and signed by the
organization.
ii. Environmental control equipment compliances such as valid licenses, conditions
that are conformed with, etc.
iii. Environmental Sampling Results (if any was done during the audit).
iv. Additional non-compliances (if any) for the Environmental Sampling Results.
v. Additional notations/explanations on the audit findings if pertinent and of material
value.
vi. Recommendations for the non-compliances found.
vii. A statement of the confidential nature of the contents of the audit report.
D ATTACHMENTS
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK
20
E.3.2 For non-EIA projects
TABLE OF CONTENTS
EXECUTIVE SUMMARY
1.0 INTRODUCTION
3.0 RECOMMENDATIONS
4.0 CONCLUSION
APPENDIX:
PROJECT PHOTOGRAPHS
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 21
E.3.3 For NREB projects
I. Title Page
— Title of Project
— Period of Audit
— Name and address of project proponent
— Name of Audit Team
— Confidentiality Note
Chapter 1: Introduction
1.1 Project Background
1.2 Legal Requirement for Independent Environmental Audit
1.3 Audit Objectives
1.4 Audit Scope
1.5 Audit Methodology
1.6 Audit Team
Chapter 4: Status of NCRs Raised in Previous Audit (not applicable for the
first audit report)
Chapter 5: Recommendations
Chapter 6: Conclusion
Chapter 7: Disclaimer
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 22
Appendices:
— Attendance Lists of Opening and Closing Meetings
— Prescribed Criteria or Approval Document
— Corrective and Preventive Action Report (CAR)
— Relevant Document
TABLE OF CONTENTS
EXECUTIVE SUMMARY
1.0 INTRODUCTION
APPENDIX:
PROJECT PHOTOGRAPHS
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, 23
PERAK
E.5 Construction Solid Waste Management Plan (CSWMP)
b) detailed descriptions on the project location, expected activities to be carried out and
expected duration of the activities;
c) estimated quantity and types of C&D waste to be generated from the project activities at
different stages of the activities;
d) proposed on-site management plan for the C&D waste (such as specific area for C&D
waste segregation and storage, specifications of waste bins to be used, methods of on-
site recycling or reuse, etc.);
e) detailed information on the licensed C&D waste contractors engaged and the expected
collection frequency;
f) proposed plan of the destinations of C&D waste, either to recyclable buyers, treatment
facilities or authorised disposal site; and
g) Emergency Response Plan (ERP) in relation to possible incidents caused by C&D waste
handling.
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK
24
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, 25
PERAK
Figure G.11. Instruction to contractors on disposal of surplus cut material
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 26
Table 8. Period for submission of documents by the contractor
Documents No. of copies Reporting frequency Duration (as required Report submission
by JKR MALAYSIA)
For Peninsular, including Federal Territories
Environmental 5 hardcopies Once only (to be EMP shall be approved For EIA, submission to
Management Plan updated when before commencement DOE and JKR
(EMP) necessary) of site clearing and Malaysia
earthwork activities on For non-EIA,
site a submission to JKR
Malaysia only
Environmental 3 hardcopies, 1 Monthly 14 days after For EIA, submission to
Monitoring Report softcopy or as required monitoring b DOE and JKR
(EMR) by DOE Malaysia
For non-EIA,
submission to JKR
Malaysia only
Environmental Audit 3 hardcopies, 1 Quarterly 14 days after audit c For EIA, submission to
Report (EAR) softcopy DOE and JKR
Malaysia
For non-EIA,
submission to JKR
Malaysia only
Environmental Closure 3 hardcopies, 1 Once only 14 days prior to For EIA, to DOE and
Audit Report (ECAR) softcopy issuance of Certificate JKR Malaysia
of Practical Completion For non-EIA,
(CPC) c Submission to JKR
Malaysia
For Sarawak
Environmental 5 hardcopies Once only (to be As directed by For EIA, submission to
Management Plan updated when S.O./P.D. a NREB and JKR
(EMP) necessary) Malaysia
For non-EIA,
submission to JKR
Malaysia
Environmental 5 hardcopies Quarterly 14 days after For EIA, submission to
Monitoring Report monitoring b NREB and JKR
(EMR) Malaysia
For non-EIA,
submission to JKR
Malaysia only
Environmental 4 hardcopies, 1 2 times internal audit 30 days after audit c For EIA, submission to
Compliance Audit softcopy and 1 time external NREB and JKR
Report (ECAR) audit Malaysia
For non-EIA,
submission to JKR
Malaysia only
For Sabah
Environmental 1 hardcopy Monthly to quarterly Not applicable
Submission to EPD
Compliance Report (depends on duration Sabah.
(ECR) of the project) Additional 1 hardcopy
to Sandakan Branch
(for EIA/PMM projects
located at the East
Coast Region of
Sabah)
aTo be carried out by registered environmental consultant and shall be approved prior to commencement of any works on site.
bTo be carried out by accredited laboratory.
cTo be carried out by registered third-party environmental auditor.
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 27
Annex H
(informative)
Malaysia marine, national water quality, national lake water and ground water
quality criteria and standards
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 28
Table H.1. Malaysia marine water quality standards (MMWQS)
(continued)
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, 29
PERAK
Table H.2. National water quality standard
CLASS
PARAMETER UNIT
I IIA/IIB III# IV V
Al mg/l - (0.06) 0.5
As mg/l 0.05 0.4 (0.05) 0.1
Ba mg/l 1 - -
Cd mg/l 0.01 0.01* (0.001) 0.01
Cr (VI) mg/l 0.05 1.4 (0.05) 0.1
Cr (III) mg/l - 2.5 -
Cu mg/l 0.02 - 0.2
Hardness mg/l 250 - -
Ca mg/l - - -
Mg mg/l - - -
Na mg/l - - 3 SAR
K mg/l - - -
Fe mg/l 1 1 1 (Leaf) 5 (Others) L
Pb mg/l N 0.05 0.02* (0.01) 5 E
Mn mg/l A 0.1 0.1 0.2 V
Hg mg/l T 0.001 0.004 (0.000 1) 0.002 E
U L
Ni mg/l 0.05 0.9* 0.2
R S
Se mg/l 0.01 0.25 (0.04) 0.02
Ag A
mg/l L 0.05 0.000 2 - A
Sn mg/l - 0.004 -
U B
mg/l - - -
Zn L O
mg/l 5 0.4* 2
B E V
mg/l 1 (3.4) 0.8
Cl mg/l V 200 - 80 E
Cl2 E
mg/l - (0.02) -
CN mg/l L 0.02 0.06 (0.02) - IV
F mg/l S 1.5 10 1
NO2
mg/l 0.4 0.4 (0.03) -
NO3 O
mg/l 7 - 5
P mg/l R 0.2 0.1 -
Silica mg/l 50 - -
SO4
mg/l A 250 - -
S mg/l 0.05 (0.001) -
CO2 B
mg/l S - - -
Gross- Bq/l 0.1 - -
E
Gross- Bq/l 1 - -
Ra-226 N
Bq/l < 0.1 - -
Sr-90 T
Bq/l <1 - -
CCE -
g/l 500 - -
-
MBAS/BAS g/l 500 5 000 (200) -
O & G (Mineral) -
g/l 40; N N -
-
O & G (Emulsified Edible) -
g/l 7 000; N N
-
PCB 0.1 6 (0.05) -
Phenol g/l -
g/l 10 - -
Aldrin/Dieldrin -
0.02 0.2 (0.01) -
BHC g/l -
2 9 (0.1) -
Chlordane g/l -
0.08 2 (0.02) -
t-DDT g/l 0.1 (1) -
-
Endosulfan g/l 10 - -
-
Heptachlor/Epoxide g/l 0.05 0.9 (0.06) -
-
Lindane g/l 2 3 (0.4) -
-
2,4-D g/l -
70 450 -
2,4,5-T g/l -
10 160 -
2,4,5-TP -
g/l 4 850 -
Paraquat g/l 10 - -
1 800
* = At hardness 50 mg/l CaCO3
# = Maximum (unbracketed) and 24-hour average (bracketed) concentrations
N = Free from visible sheen, discolouration and deposits
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, 30
PERAK
Table H.2. National water quality standard (continued)
CLASS
PARAMETER UNIT
I IIA IIB III IV V
Ammoniacal nitrogen mg/l 0.1 0.3 0.3 0.9 2.7 > 2.7
Biochemical oxygen demand mg/l 1 3 3 6 12 > 12
Chemical oxygen demand mg/l 10 25 25 50 100 > 100
Dissolved oxygen mg/l 7 5-7 5-7 3-5 <3 <1
pH - 6.5 - 8.5 6-9 6-9 5-9 5-9 -
Colour TCU 15 150 150 - - -
Electrical conductivity* S/cm 1 000 1 000 - - 6 000 -
Floatables - N N N - - -
Odour - N N N - - -
Salinity ppt 0.5 1 - - 2 -
Taste - N N N - - -
Total dissolved solid mg/l 500 1 000 - - 4 000 -
Total suspended solid mg/l 25 50 50 150 300 300
Temperature °C - Normal + 2 °C - Normal + 2 °C - -
Turbidity NTU 5 50 50 - - -
Faecal coliform** count/100 ml 10 100 400 5 000 (20 000)a 5 000 (20 000)a -
Total coliform count/100 ml 100 5 000 5 000 50 000 50 000 > 50 000
N = No visible floatable materials or debris, no objectional odour or no objectional taste
* = Related parameters, only one recommended for use
** = Geometric mean
a = Maximum not to be exceeded
CLASS USES
Class 1 Conservation of natural environment.
Water supply I – Practically no treatment necessary.
Fishery I – Very sensitive aquatic species.
Class IV Irrigation.
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, 31
PERAK
Table H.3. National lake water quality criteria and standards
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 32
Table H.3. National lake water quality criteria and standards (Continued)
NV – Not visible
nd – Not detected
NOTE. Other parameters that are not mandatory to be measured are given in National Lake Water Quality
Criteria and Standards, NAHRIM, 2015
LAKE CATEGORIES
NO CATEGORIES DESCRIPTION
1 CATEGORY A Lakes that are managed in which the water to be used for
recreational purposes – primary body contact such as
swimming, diving and kayaking.
2 CATEGORY B Lakes used for recreational purposes – secondary body
contact such as boating and cruising.
Swimming is not allowed.
3 CATEGORY C The lakes are meant for the preservation of aquatic life and
biodiversity.
4 CATEGORY D Lakes managed for minimum preservation of good aquatic life
It applies good management practices of lakes.
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, 33
PERAK
Table H.4. National ground water quality standards
Agriculture
Parameter Potable water Industry use
use
Total coliform, MPN/100 ml 5 000 - -
E. coli, MPN/100 ml 5 000 - -
Turbidity, NTU 1 000 - -
Colour, TCU 300 - -
pH 5.5 - 9.0 - 6.5 - 8.0
Temperature, °C Normal ± 2 - -
Conductivity, µS/cm 1 000 700 -
Total dissolved solid, mg/l 1 500 3 000 -
TDS/Cond, mS/m - - 450/70
Suspended solid, mg/l - - 5
Chloride. mg/l 250 4.0 mEq/l 100
Ammonia, mg/l 1.5 - -
Nitrate, mg/l 10 - -
Iron, mg/l 1.0 - 0.3
Flouride, mg/l 1.5 - -
Hardness 500 - 250
Manganese, mg/l 0.2 0.2 0.2
Chemical oxygen demand
10 - 30
(COD)
MBAS 1.0 - -
Biological oxygen demand
6 - -
(BOD)
Nitrite, mg/l 0.4 - -
Mercury, mg/l 0.001 - -
Cadmium, mg/l 0.003 0.01 -
Arsenic, mg/l 0.01 0.1 -
Cyanide, mg/l 0.07 - -
Lead, mg/l 0.05 - -
Chromium, mg/l 0.05 0.1 -
Copper, mg/l 1.0 0.2 -
Zinc, mg/l 3.0 2.0 -
3.0 mEq/l
Natrium, mg/l 200 -
(SAR 3)
34
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK
Table H.4. National ground water quality standards (Continued)
Agriculture/
Parameter Potable water Industry use
Livestock
Sulphate, mg/l 250 1 000 200
Selenium, mg/l 0.01 - -
Silver, mg/l 0.05 - -
Magnesium, mg/l 150 - -
Mineral oil 0.3 - -
0.000 03 –
Pesticides, mg/l - -
0.03
Phenol, mg/l 0.002 - -
Nickel, mg/l 0.05 0.2 -
Aluminium, mg/l - 5.0 -
Nitrate & Nitrite, mg/l - 100 -
Silica, mg/l - - 20
Boron, mg/l - 0.7 -
Gross alpha, Bq/l 0.1 - -
Gross beta, Bq/l 1.0 - -
Alkalinity - - 300
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, 35
PERAK
APPENDIX 2
SCHEDULE 1: SUMMARY OF DOCUMENTS TO BE ENCLOSED
WITH SUBMISSION
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
36
PERAK
APPENDIX 2
Signature of Tenderer :
Name Of Authorized Personnel :
Official Stamp Of Tenderer :
Date :
37
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK
APPENDIX 3
JKR SUSTAINABILITY & GREEN MISSION 2.0
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK 38
39
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING,
PERAK
MyCREST
NEEDS STATEMENT
CONTENTS
GENERAL
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, PERAK 2
Malaysian Carbon Reduction and Environmental Sustainability Tool (MyCREST)
____________________________________________________________________________________
1.0 INTRODUCTION
1.2. To measure the level of sustainability, the project shall be rated by using the
Malaysian Carbon Reduction and Environmental Sustainability Tool (MyCREST).
MyCREST certification is to encourage sustainable development which reduces
operational cost, upgrade the level of comfort and productivity and minimise impact
to the environment.
2.1. MyCREST rating shall be implemented for this project AND achieve at least 1
STAR rating which will be evaluated throughout Design and Construction stages.
2.2. The tenderers shall follow the MyCREST workflow as enclosed in Appendix A.
2.3. The tenderers shall submit their proposal regarding the targetted criterias by using
MyCREST Scorecard template (refer Appendix B) and all necessary documents.
2.4. In the event of differences, it is noted and agreed that the higher requirements from
either Architectural, Mechanical, Electrical and MyCREST Needs Statement shall
prevail.
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, PERAK 3
Malaysian Carbon Reduction and Environmental Sustainability Tool (MyCREST)
____________________________________________________________________________________
3.0 REQUIREMENTS
3.1 The project shall be designed in accordance to nine (9) main criterias in MyCREST
Design assessment tool and the required criteria shall comply as below:
a) Pre-Design (PD)
b) Infrastructure and Sequestration (IS)
• Req1 Site Inventory Analysis On Greenery
• Req2 Compliance with Landscape Requirement from Local Authority
c) Energy Performance Impacts (EP)
• Req1 Building Envelope Performance
• Req2 Roof Thermal Performance
• Req3 Building Energy Efficiency Performance
• Req4 Fundamental Refrigerant Management
• Req5 Main Commissioning of Building Energy Systems
d) Occupant and Health (OH)
• Req1 Air Quality Performance
• Req2 Indoor Smoking Restriction
e) Lowering the Embodied Carbon (EC)
• Req1 Recycling Facility
f) Water Efficiency Factors (WE)
• Req1 Reduce Potable Water – 10% Reduction
g) Social and Cultural Sustainability (SC)
h) Demolition and Disposal Factors (DP)
i) Sustainable and Carbon Initiatives (IN)
3.2 The project shall be constructed in accordance to eight (8) main criterias in
MyCREST Construction assessment tool as below:
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, PERAK 4
Malaysian Carbon Reduction and Environmental Sustainability Tool (MyCREST)
____________________________________________________________________________________
3.4 The rating points are as described in the MyCREST Reference Guide for Design
and Construction Stage; a document published by CIDB and Public Works
Department Malaysia (JKR) which can be download at http://www.cidb.gov.my
or http://www.cidb.gov.my/index.php/my/bidang-utama/pembinaan-mampan .
4.1 The tenderers shall fill in all the necessary data for MyCREST scorecard
template as per enclosed in Appendix B.
4.2 The tenderers shall submit all the necessary documents based on identified
criteria in the targeted Design Stage and Construction Stage Scoring Plan for
MyCREST rating indicated in the MyCREST Reference Guide.
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, PERAK 5
Malaysian Carbon Reduction and Environmental Sustainability Tool (MyCREST)
____________________________________________________________________________________
4.5 Documentation shall be submitted in softcopy (PDF format) and hardcopy (not
exceeding A3 size). The submittals shall be sort out according to criteria list.
4.6 In the event of differences with procedures for certification, it is noted and agreed
that the latest procedures from CIDB and JKR shall prevail.
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, PERAK 6
Malaysian Carbon Reduction and Environmental Sustainability Tool (MyCREST)
____________________________________________________________________________________
APPENDIX A
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, PERAK 7
MyCREST Work Flow
APPENDIX A
Design and Build
2. DESIGN STAGE
1. START 3. CONSTRUCTION STAGE
*1 *2
Submit MyCREST Registration Application for Design and Application for Construction
HOPT Construction Stage assessment to HOPT Stage assessment to MyCREST
HOPT form to MyCREST coordinator
(CASKT) MyCREST coordinator (CASKT) coordinator (CASKT)
All the submittal documents shall Prepare and submit all the
Submit MyCREST HODT be prepared and submitted to Contractor submittal documents to PD
Registration form to CIDB HOPT
CASKT MyCREST secretariat
Compile and Submit the Compile and Submit the
HOPT documents to MyCREST HOPT / PD documents to MyCREST
coordinator (CASKT) coordinator (CASKT)
MyCREST Project is registered under
Secretariat MyCREST
Submit documents to MyCREST CASKT Submit documents to MyCREST
CASKT secretariat
secretariat
Additional
information
Additional
/ submittal
information
documents
CASKT, Project Meeting on targeted / submittal Check the
MyCREST
HOPT, MyCREST scorecard documents submittal
HODT,
Secretariat No
Check the documents
Consultant MyCREST submittal
Secretariat documents No
Yes
MyCREST MyCREST committee (Assessor)
Provision of MyCREST Needs Secretariat meeting on submittal documents
CASKT Yes
Statement received
MyCREST committee (Assessor)
MyCREST meeting on submittal documents Additional
Secretariat received information
/ submittal
*Notes: MyCREST documents
MyCREST
Additional Secretariat Committee
Design Stage: information (Assessor) No
1. Design submittal documents / submittal results
documents
shall be submitted after the design has
been finalised. MyCREST
MyCREST Committee Yes
Construction Stage: Secretariat (Assessor) No
results MyCREST AWARD
2. Construction submittal
documents shall be submitted within 12
months after project completion (CPC).
Malaysian Carbon Reduction and Environmental Sustainability Tool (MyCREST)
____________________________________________________________________________________
PEMBINAAN BANGUNAN STOR FARMASI LOGISTIK DAN FARMASI STERIL HOSPITAL TAIPING, PERAK 8
MyCREST Building Rating System (Version 1.0)
Malaysian Carbon Reduction and Environmental Sustainability Tool
Project Details
Project Name
Project Location
Building Rating
2
Project Gross Floor Area* m
Building Type Air-Conditioned Building
Building Categories House & Residential
Design Stage
MyCREST Rating Stage Construction stage
Operation & Maintenance Stage
Date
*GFA must excludes Car Parks ** Involve 1 year value * Involve once per building lifespan
BAU Actual
***
Malaysian Carbon Reduction and Environmental Sustainability Tool
Sub Criteria Points Summary
Date:
DESIGN
Maximum
Criteria Notes
Points Target Points
Design Stage
PD - Pre-Design Notes:
PD1 MyCREST SUSTAINABLE AND CARBON REDUCTION TARGET IN NEEDS STATEMENT Ci 1
Ci
3.1 Install individual sub-meters to monitor the major water usage 1
3.2 Linking all private meters to the EMS for leak detection Ci 1
WE4 RECYCLED GREY WATER
Recycle grey water ≥10% Ci 1
Recycle grey water ≥20% Ci 2
TOTAL 8 0
Provide more than 3% (based on cost) any building component/assemblies that can be
Ci 1
disassembled for future reuse or recycling
Implement alternative strategy(s) to reduce carbon emission and/or contribute to sustainability which complies with one of three mandatory criteria
which are:
1. Carbon Sequestration
2. Carbon Reduction under Scope 3 of GHG Emissions
3. Technological Advancements to Improve Building Performance
IN1 CERTIFIED MyCREST QUALIFIED PROFESSIONAL Ci 1
IN2 INNOVATION: CARBON REDUCTION POINTS Cr
6
IN3 INNOVATION: CARBON IMPACT POINTS Ci
a) Exemplary Perfomance (CR points only):
i) Cr
ii) Cr
b) Other Strategies Proposed by Developers
i)
ii)
iii)
iv)
TOTAL 7 0
Elective Points
HEALTHCARE
Infrastructure and Sequestration Notes:
HC1 CONNECTION TO NATURAL WORLD S 1
HC2 EQUIPMENT AND MEDICAL EQUIPMENT EFFICIENCY S 1
TOTAL 2 0
TOTAL
TOTAL TARGET
TOTAL DESIGN STAGE (ELECTIVE) MAXIMUM
POINTS
POINTS
TOTAL
TOTAL TARGET
TOTAL DESIGN STAGE (CORE + ELECTIVE) MAXIMUM
POINTS
POINTS
AIR-CONDITIONED BUILDING 142 0
NON-AIR-CONDITIONED BUILDING 114 0
Construction Stage
IS - Infrastructure and Sequestration Notes:
IS8 ENVIRONMENTAL IMPACT FROM CONSTRUCTION ACTIVITY
8.1 Proper Timing of Erosion & Sedimentation Control Strategies Ci 1
8.2 Proper Implementation of Staging and Spill Prevention Plan Ci 1
8.3 Implementation of Erosion and Sedimentation Control Plan Ci 1
IS9 CARBON ACCOUNTING ON SITE (FOR GREENFIELD OR GRADED LAND) IS-CAL02
9.1 Carbon Sequestration - Preservation (For Mature Trees)
Preserve more than 80 Percent of trees Cr 2
9.2 Carbon Sequestration - Preservation/Restoration/New Planting
Plant new vegetation on 20% of site area including building foot print Cr 2
Plant new vegetation on 25% of site area including building foot print Cr 3
Plant new vegetation on 30% of site area including building foot print Cr 4
Integration of shaded trees within 5 meters from the building perimeter Cr 1
Produce carbon sequestration of not less than 0.5tCO2e Cr 1
IS10 IMPLEMENT ENVIRONMENTAL MANAGEMENT PLAN (EMP) Ci 3
IS11 ENVIRONMENTAL MANAGEMENT PRACTICE
11.1 Implement effective environmental friendly programmes Ci 1
11.2 Main contractor has good track records in green practice S 1
11.3 Implement the ISO 14000 procedure S 1
IS12 EMISSION REPORTING - CONSTRUCTION MACHINERY IS-CAL03 Cr 2
TOTAL 19 0
(Non-air-conditioned area minimum 80% of total floor area excluding car parks and common areas)
Req8 ENERGY VERIFICATION - ENERGY EFFICIENCY PERFORMANCE & ASSESSMENT Cr Required Required
EP21 BUILDING PERFORMANCE Ci 15
AIR-CONDITIONED BUILDING 59 0
TOTAL
NON-AIR-CONDITIONED BUILDING 29 0
Implement alternative strategy(s) to reduce carbon emission and/or contribute to sustainability which complies
with one of three mandatory criteria which are:
1. Carbon Sequestration
2. Carbon Reduction under Scope 3 of GHG Emissions
3. Technological Advancements to Improve Building Performance
IN1 CERTIFIED MyCREST QUALIFIED PROFESSIONAL S 1
IN2 INNOVATION: CARBON REDUCTION POINTS Cr
6
IN3 INNOVATION: CARBON IMPACT POINTS Ci
a) Exemplary Performance - CR point only:
i) Cr
iI) Cr
b) Other Strategies Proposed by Developers
i)
ii)
iii)
iv)
TOTAL 7 0
NON-AIR-CONDITIONED BUILDING 98 0