The document lists various sections, systems, and areas of a facility along with the number of items associated with each. The total number of items for the onsite sections is 768 and the total number of items for the offsite sections is 391.
The document lists various sections, systems, and areas of a facility along with the number of items associated with each. The total number of items for the onsite sections is 768 and the total number of items for the offsite sections is 391.
The document lists various sections, systems, and areas of a facility along with the number of items associated with each. The total number of items for the onsite sections is 768 and the total number of items for the offsite sections is 391.
AGE Regeneration Section 12 AGR Absorption Section 49 AGR Absorption Section 91 Amine Drain 11 Amine Storage and Make-up 8 Boiler 12 Condensate Loading System 49 Condensate Stabilization 1 Deaerator - HP BFW System 2 Deep Well Pump D and B 2 Export Gas Launcher 3 FGS Field Devices - Condensate and Produced Water Storage 3 FGS Field Devices - Process-Condensate (Phase-2 Area) 31 HP Steam and HP Condensate 10 Instrument Main Cable and Junction Box - Process Area (Phase 2) 45 Instrument Air-Process and Offsite 6 Instrument Main Cable and Junction Box - Telecom Tower and Panel Room Area 4 Instrument Main Cable and Junction Box - Sulphur Granulation & Amine Tank Area 3 Instrument Main Cable and Junction Box - Condensate Truck Loading Area 33 LP BFW System , LP Steam (Phase-2), MP Steam (Phase-2) 20 Production Separator and Slug Catcher 10 SCADA - Main Control Room 1 SRU - Acid Gas KO Drum 22 SRU - Fuel Gas Distribution 18 SRU - Incinerator 52 SRU - Incinerator Air Blower 21 SRU - Process Air Blower 35 SRU - Sulfur Locks and Degassing 31 SRU - Thermal and Claus Reactor 136 SRU - WHB Blow down 3 Sulfur Granulation 7 Sulfur Waste Water Treatment 3 UCP For Sulphur Granulation Package (MCR Area) 1 Wash Water 7 PURGE AIR TO 35-LT-506 (7000-25 Rotameter) 6 CPP => 768 AS Trunk Line & Well Head 149 FGS Field Devices - Well Pads-Alur Siwah & Alur Rambong 50 Instrument Main Cable and Junction Box - Alur Siwah and Alur Rambong 62 AR Trunk Line & Well Head 60 JR Well Head-JR Cluster 2 27 FGS Field Devices - Julu Rayeu Cluster-2 4 PCS - ESS (Alur Siwah Wellpad Area) 16 PCS - ESS (Alur Rambong Wellpad Area) 16 Produce Water Injection Wellhead 7 OFFSITE => 391