1159

AGE Absorption Section 20


AGE Regeneration Section 12
AGR Absorption Section 49
AGR Absorption Section 91
Amine Drain 11
Amine Storage and Make-up 8
Boiler 12
Condensate Loading System 49
Condensate Stabilization 1
Deaerator - HP BFW System 2
Deep Well Pump D and B 2
Export Gas Launcher 3
FGS Field Devices - Condensate and Produced Water Storage 3
FGS Field Devices - Process-Condensate (Phase-2 Area) 31
HP Steam and HP Condensate 10
Instrument Main Cable and Junction Box - Process Area (Phase 2) 45
Instrument Air-Process and Offsite 6
Instrument Main Cable and Junction Box - Telecom Tower and Panel Room Area 4
Instrument Main Cable and Junction Box - Sulphur Granulation & Amine Tank Area 3
Instrument Main Cable and Junction Box - Condensate Truck Loading Area 33
LP BFW System , LP Steam (Phase-2), MP Steam (Phase-2) 20
Production Separator and Slug Catcher 10
SCADA - Main Control Room 1
SRU - Acid Gas KO Drum 22
SRU - Fuel Gas Distribution 18
SRU - Incinerator 52
SRU - Incinerator Air Blower 21
SRU - Process Air Blower 35
SRU - Sulfur Locks and Degassing 31
SRU - Thermal and Claus Reactor 136
SRU - WHB Blow down 3
Sulfur Granulation 7
Sulfur Waste Water Treatment 3
UCP For Sulphur Granulation Package (MCR Area) 1
Wash Water 7
PURGE AIR TO 35-LT-506 (7000-25 Rotameter) 6
CPP => 768
AS Trunk Line & Well Head 149
FGS Field Devices - Well Pads-Alur Siwah & Alur Rambong 50
Instrument Main Cable and Junction Box - Alur Siwah and Alur Rambong 62
AR Trunk Line & Well Head 60
JR Well Head-JR Cluster 2 27
FGS Field Devices - Julu Rayeu Cluster-2 4
PCS - ESS (Alur Siwah Wellpad Area) 16
PCS - ESS (Alur Rambong Wellpad Area) 16
Produce Water Injection Wellhead 7
OFFSITE => 391