QA/QC/Site Engineer Technical Exam

Name :

Position Desired:

Contact # :

I.

1.) what is initial setting time of cement? __________

2.) Class AA of Concrete Mixture?______________

3.)Class A Concrete Mixture?_________________

4.)Class B Concrete Mixture?_________________

5.)Class C Concrete Mixture?__________________

II. Determine the Work Desciption from the given Item No. of DPWH standard

1.) Item 100 = __________________________________________________.

2.) Item 101 = __________________________________________________.

3.) Item 102 = __________________________________________________.

4.) Item 103 = __________________________________________________.

5.) Item 104 = __________________________________________________.

6.) Item 105 = __________________________________________________.

7.) Item 106 = __________________________________________________.

8.) Item 107 = __________________________________________________.

9.) Item 200 = __________________________________________________.

10.) Item 201 = __________________________________________________.

11.) Item 202 = __________________________________________________.


QA/QC/Site Engineer Technical Exam
12.) Item 203= __________________________________________________.

13.) Item 204 = __________________________________________________.

14.) Item 205 = __________________________________________________.

15.) Item 206 = __________________________________________________.

16.) Item 207 = __________________________________________________.

17.) Item 300 = __________________________________________________.

18.) Item 301 = __________________________________________________.

19.) Item 302 = __________________________________________________.

20.) Item 303 = __________________________________________________.

Choices:

Removal of Structures and Obstructions ,

Structure Excavation, Embankment,

Compaction Equipment and Density --------------- Control Strips,

Aggregate Subbase Course,

Aggregate Base Course,

Crushed Aggregate Base Course,

Lime Stabilized Road Mix Base Course,

Portland Cement Stabilized Road Mix,

Subgrade Preparation ,

Asphalt Stabilized Road Mix Base,

Portland Cement Treated Plant Mix,

Aggregate Stockpile,

Aggregate Surface Course,


QA/QC/Site Engineer Technical Exam
Bituminous Prime Coat,

Excavation,

Clearing and Grubbing ,

Bituminous Tack Coat,

Bituminous Seal Coat,

Bituminous Surface Treatment,

Bituminous Penetration Macadam

III.) Fill In The Blanks. NBCP CODES

1.) P.D. ______is also known as the National Building Code of the Philippines.

2.)Rooms for Human habitations ______ sq.m with at least dimensions of ______m.

3.)Kitchens ______ sq.m with atleast dimensions of ________m.

4.) Bath and Toilet _______sq.m wiith atleast dimension of __________m.

5.)Stairs Should be ______mm in clear width.with a rise of ______mm,and a minimum of _______mm.