This document provides details about a sewage treatment plant (STP) in Mangalaghat, Puri, Odisha that serves a population of over 100,000 people. The STP was commissioned in 2014 at a cost of 80.45 crore INR and has a capacity of 15 million liters per day. Treated water from the STP is reused for gardening, horticulture, and site maintenance. The technology used includes sedimentation, anaerobic contact media, aerobic attached growth processes, and disinfection. Inlet water has 95 ppm BOD and 180 ppm TSS, and the outlet meets standards with 14 ppm BOD and 30 ppm TSS.
This document provides details about a sewage treatment plant (STP) in Mangalaghat, Puri, Odisha that serves a population of over 100,000 people. The STP was commissioned in 2014 at a cost of 80.45 crore INR and has a capacity of 15 million liters per day. Treated water from the STP is reused for gardening, horticulture, and site maintenance. The technology used includes sedimentation, anaerobic contact media, aerobic attached growth processes, and disinfection. Inlet water has 95 ppm BOD and 180 ppm TSS, and the outlet meets standards with 14 ppm BOD and 30 ppm TSS.
This document provides details about a sewage treatment plant (STP) in Mangalaghat, Puri, Odisha that serves a population of over 100,000 people. The STP was commissioned in 2014 at a cost of 80.45 crore INR and has a capacity of 15 million liters per day. Treated water from the STP is reused for gardening, horticulture, and site maintenance. The technology used includes sedimentation, anaerobic contact media, aerobic attached growth processes, and disinfection. Inlet water has 95 ppm BOD and 180 ppm TSS, and the outlet meets standards with 14 ppm BOD and 30 ppm TSS.
Best Practices in Technology – Case Study for Residential complex
S.no. Particulars Details
1. Site & Name of town STP,Mangalaghat,Puri 2. Name of State Odisha 3. Population 256533 2011 Census Current Population 4. Population covered by 102613 persons approx. STP 5. Capacity of STP 15ML/day 6. Year of Commissioning 2014 7. Time taken in 3 year. Construction 8. Land area required 16.86 Square kilometres Approx. 9. Cost of the Project INR 80.45 crore 10. O&M arrangement WATCO ( Puja and Ureka (PSSO)) In house/Out sourced 11. O&M cost (per KL) INR 5.3 per KL 12. Recycle & Reuse of Gardening, Horticulture and Under Treated water congratulations Site, Road sweeping. 13. Reuse of Treated Sludge Can be used as manure, removed on monthly bases. 14. Description of Sedimentation separation followed by Anaerobic Technology contact media, Aerobic attached growth process, second sedimentation & disinfection. 15. Inlet Parameters (BOD, BOD: 95ppm, COD: 220ppm, TSS 180ppm COD, TSS etc) 16. Outlet Parameters BOD: 14ppm, COD:50ppm, TSS:30PPM (BOD, COD, TSS etc) 17. Skill requirement for Product works automatically; Common service O&M person was given desired training to maintain the plant. 18. Mode of collection of Existing local Sewage network Sewage from Household to the Treatment Facility 19. Unit Sizing- (including 11.29MX 2.4M layout map) 20. Description on technical Design MLSS - 2500-3000ppm (attached growth details process) (A) Design F/M ratio TBD- F/M ratio, SRT & SOTE B) Design MLSS C) HRT HRT- Sedimentation Separation: 3.278hours D) SRT Anaerobic chamber: 5.60 hours E) Design SOTE Aeration chamber: 6 hours Second sedimentation chamber:2.42 hours Disinfection chamber: 0.18hours