Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

Out Existing projects and Accomplishments

To transform our University into 21 century e-university, all aspects of the university operations
should be automated and the foundation of automating our university business operation involves
basic activities such as

 Building the best infrastructure that can handle all university’s business transactions.
 Develop a system that automating the core processes (teaching, learning, research and
community services) and
 Develop a system that support processes (Human Resource, Finance, procurement,
student services and others).

Some of the projects that are undertaken by the UoG ICT directorate to transform the university
into e-university include the following:

Our existing projects as we know we have successfully implemented and achieved different ICT
projects in our university among the project we have done as well they planned to work at you
institution are listed in the table as follows:

No Project Name Description Contractor’s Name


.
1 Video The construction of video conference and Neuronet PLC
Conferencing smart class room solution for University Tsegaye Habtu
and Smart Class of Gondar Zefco Bldg., Sierra Leone
Room solution  Video conferencing infrastructure is St., AA, Ethiopia
mainly used as way of communication Tel: +251-11-4660943/44
with other peer university in Ethiopia Mob: +251-911-215100
and from other countries. Email:
 In each campuses, smart classes with a habtu@neuronetethiopia.com
total capacity of 80 peoples are built
and by using those smart classes, one
teacher can teach many students
simultaneously and our students can
take online courses and our teachers can
teach from anywhere.
Smart interactive whiteboard system
 Our university bought some of the new
generation teaching technology
whiteboard system and installed in all
campuses for trail and by considering
the significance of such whiteboard
system for the teaching and learning
process, currently additional 290 smart
whiteboard systems are under purchase
process and to start installation
trucking in all classes.
 Using such system will avoid previous
teaching experience, it will make it
more modernized and will incorporate
all the latest technological & ict
advancements and that will automate
our university learning teaching
processes.
2 Datacenter and Symbol PLC
LAN
Infrastructure
project
3 Surveillance  Our camera control room fully designed IP COM
CCTV Camera and furnished with the latest technology
and Campus that meets international standard and
Check Point has 9 screen with three column and
Security Project managed by axis camera station
 Our Camera Management System is a
fully-featured video management
system. It offers effective video
management that meets the need of our
control system.
4 Wireless LAN Symbol PLC
Project
5  UoG ICT directorate install a digital
signage to display and disseminate any Neuronet PLC
up-to-date information, information that Tsegaye Habtu
are mostly used by the university Zefco Bldg., Sierra Leone
Digital Signage community, DSTV and TV channels St., AA, Ethiopia
Solution inside the university premises every Tel: +251-11-4660943/44
day. Mob: +251-911-215100
 Additional 5 outdoor LED screen are Email:
under processes and to be installed in habtu@neuronetethiopia.com
all campuses.

You might also like