Professional Documents
Culture Documents
Ma Rks CO R.B. T. Leve L
Ma Rks CO R.B. T. Leve L
Ma Rks CO R.B. T. Leve L
Programme: CivilEngineering
OR
2 a) Explain different storage zones of reservoir withn neat sketch.
12 Co5 L2
2 b) A channel section is to be designed for the following data;
Discharge Q=15cumecs, Lacys factor f=1 and side slope=0.5 H to 1V 13 Co5 L3
Part -B
3 a) What is meant by design of canal? Differentiate between the Kenedys and 12 Co4 L1
Lacys thoery.
Define hydrograph. Explain hydrograph with its components.
3 b) 13 Co4 L2
OR
4 a) Define canal. Explain types of canal based on alignment of canal. 12 Co5 L2
4 b) A channel section is to be designed for the following data; 13
Discharge Q=30cumecs, Lacys factor f=1 and side slope=0.5 H to 1V Co5 L3