Activity Normal Duration (Week) Crash Duration (Week) Normal Cost ( 1000 L.E./week) Crash Cost ( 1000L.E./ Week) Remarks
Activity Normal Duration (Week) Crash Duration (Week) Normal Cost ( 1000 L.E./week) Crash Cost ( 1000L.E./ Week) Remarks
Activity Normal Duration (Week) Crash Duration (Week) Normal Cost ( 1000 L.E./week) Crash Cost ( 1000L.E./ Week) Remarks
after crashing.
ACTIVITY Normal Crash Normal Crash Cost Remarks
duration duration Cost (*1000L.E./
(week) (week) (*1000 week)
L.E./week)
A 10 5 1000 4000
B 20 5 1500 6000
C 30 5 1500 3000
D 10 5 2000 4000
E 5 5 1500 1500 has a lag with 10 weeks
F 20 10 1000 2500
M 20 5 2000 4000
N 10 5 2500 5000
O 20 15 2000 2500 has a lead with 5 weeks with Q
X 10 5 2000 4000
Z 20 5 1500 5500
Q 20 10 2000 3000 has a delay with 10 weeks with Y
Y 10 5 1500 3000
Contract allows an advanced payment of 7, 500, 000 L.E
Table (2) shows the receipts. The conditions of contract allow interim measurements to be
made as scheduled and payment of amount certified less 10 % retention to be paid to the
contractor one month later.
Table (2)
Week no. 10 20 30 40 50 60 70 80 90
Value of work each month
9 30 50 60 46 20 35 60 60
(* 10^6 L.E) (Net value)
N M
10 30
20 20
X Z
20 Y Q
10 40 50 80
10 20 d10y
A 10
0
10 15
O
B L5(Q)
20
C D E F
30 60 65 75 15 90
30 5 5 F(10)