Ibu Lucy:: Release 3: V2
Ibu Lucy:: Release 3: V2
Ruko: bintaro
No.
Iss. : Release 3
Ver. : V2
PROGRESS MGG LALU PROGRESS MGG INI PROGRESS S/D MGG INI
No. Deskripsi pekerjaan Rencana Volume Sat BOBOT KETERANGAN
Vol Bobot % Vol Bobot % Vol Bobot %
A Preliminary works
I. Breakdown/demolition
1 Bangunan existing
a. Plafon
* Lantai 2
** Cover R 18.80 m2 0.21% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
** Kerangka R 18.80 m2
b. Atap
* Cover atap R 20.00 m2 0.19% 0.00 0.00% 8.00 0.08% 8.00 0.08% 40.00% -
* Kerangka R 20.00 m2 0.47% 0.00 0.00% 8.00 0.19% 8.00 0.19% 40.00% -
c. Lantai
d. Kusen, pintu, bovenlicht, dan jendela
* Kusen + pintu S
* Kusen + jendela S
e. Dinding
* Dinding Lantai 3 R 10.15 m2 0.33% 10.15 0.33% 10.15 0.33% 100.00% Selesai
B Struktur utama
I. Pondasi
1 Batu belah
a. Setempat di bawah footplate S
b. Lajur/menerus S
c. Setempat di bawah groundtank & septictank S
2 Balok struktur beton bertulang R 16.55 m 4.83% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
C Fisik dinding
1 Preparation
a. Chipping dinding
* Persiapan sambungan dinding baru R 7.00 m 0.20% 7.00 0.20% 0.00 0.00% 7.00 0.20% 100.00% Selesai
D Atap
I. Atap mesh
1 Pemasangan kerangka baja ringan
a. Truss (kuda-kuda) S m2
b. Purlin (gording) R 37.60 m2 4.96% 0.00 0.00% 37.60 4.96% 37.60 4.96% 100.00% Selesai
c. Battens S m2
2 Peninggian dinding bata - bottom chords locking R 13.20 m 0.93% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
3 Pemasangan kerangka listplank R 7.90 m 0.24% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
4 Pemasangan underlayer
a. Glasswool S
b. Alumunium foil R 37.60 m2 1.24% 0.00 0.00% 37.60 1.24% 37.60 1.24% 100.00% Selesai
c. Roofmesh S
5 Pemasangan cover atap R 37.60 m2 5.13% 0.00 0.00% 37.60 5.13% 37.60 5.13% 100.00% Selesai
* Spandex Metal berpasir
6 Pemasangan carpus
a. Puncak atap (horizontal) S m
b. Sisi miring S m
11 Listplank cement board R 7.90 m 0.30% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
3 Langsiran Pekerjaan atap R 1.00 ls 0.47% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
I. Plafon Baru
1 Pemasangan plafon baru : Lantai 3
a. Plafon Mesh
* Kerangka R 27.72 m2 3.78% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
* Panel plafon R 27.72 m2
c. Manhole R 1.00 set 0.09% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
d. List plafon R 21.40 m 0.50% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
c. Manhole R 1.00 set 0.09% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
d. List plafon R 12.40 m 0.29% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
F Lantai
I. Lantai deck
1 Lantai deck : existing
a. Screeding R 14.52 m2 1.37% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
b. Acian halus R 14.52 m2 0.21% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
G Pengecatan
I. Pengecatan lantai 3
1 Exterior
a. Wall base coating S
b. Cat dinding S
c. Coating waterproof R 40.20 m2 2.65% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
d. Pengecatan lisplank R 7.90 m 0.19% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
2 Interior
a. Cat plafon
* Plafon lantai 2 R 18.80 m2 0.62% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
* Plafon lantai 3 R 27.72 m2 0.91% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
b. Cat deck exposed
* Bidang floordeck S
* Bidang deck beton S
* Balok dan listplank beton R
c. Cat dinding R 47.70 m2 1.80% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
1 Bongkar dan pasang jendela façade depan lantai 3 R 1.00 ls 0.71% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
* Material
* Equipment
* Pengerjaan
2 Perbaikan jendela façade depan yang bocor R 1.00 ls 0.94% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
* Material
* Equipment
* Pengerjaan
2 Feeder cable
* Meteran PLN ke panel S
3 Panel system
a. Main breaker single line R
b. Breakers
** Lighting R
** Powerline R
** AC S
** Spare R
c. Fuse S
d. Indicator lamps S
e. Metering system S
f. Panel box R
g. Busbar system R
h. Terminal system : neutral & grounding R
i. Wire track & protector
* Cable trunk S
j. Wiring & setting R
k. Terminasi R
4 Grounding system
a. Earth termination (earthing) S
b. Grounding terminal S
c. Ground wiring S
II. Lighting
1 Lantai 3
a. Wiring
* Instalasi single R 1.00 ttk 0.26% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
* Instalasi seri R 1.00 ttk 0.26% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
b. Wire track & protector
* Conduit piping
c. Lighting equipments
* Single switch S
* Serial switch R 1.00 set 0.04% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
d. Lighting set
* Outbow fitting + LED bulb 15W R 1.00 set 0.09% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
* Downlight 5 " R 2.00 set 0.26% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
IV. AC powerline
1 Lantai 3
a. Wiring
* Instalasi single : baru R 1.00 ttk 0.30% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
* Instalasi seri/group : baru S
b. Wire track & protector
* Conduit piping S
c. Equipments
* AC socket R 1.00 set 0.12% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
K General
1 Mob - demobilisasi R 1 ls 2.35% 0.12 0.27% 0.23 0.55% 0.35 0.82% 35.00% -
2 Shelter / worker cabin R ls
3 Scaffolding system dan/atau perancah kayu R 1 ls 1.88% 0.43 0.81% 0.00 0.00% 0.43 0.81% 42.86% -
4 Safety euipments S
5 Healthy requirements S
6 Tirai, terpal, dan/atau partisi kerja temporer R 1 ls 0.94% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
7 General cleaning R 1 ls 0.47% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
8 Pembuangan puing & sampah R 1 ls 0.56% 0.00 0.00% 0.00 0.00% - 0.00% 0.00% -
9 Listrik & air kerja S
10 Perijinan kerja & biaya sehubungan dengannya S
11 Biaya-biaya lingkungan S
12 Biaya-biaya tidak resmi S
Catatan : 1. Pekerjaan yang tidak / belum tercantum di atas akan diperhitungkan sebagai pekerjaan tambahan
2. Di sini nilai pekerjaan diperhitungkan secara garis besar dan perlu dihitung lebih detail lagi, maka nilai total akhirnya dapat berubah
Kharisma Adiluhung