Professional Documents
Culture Documents
Amodi1 2
Amodi1 2
-XIII
TRENCHING DETAILS
DI / HDPE PIPE L-SECTION OF AMODI LIFT IRRIGATION SCHEME
MIN 1.0M MIN 1.0M
BRANCH-1/ FROM CH. 1020 m TO 2040 m
OD OD
TOTAL LENGTH OF PIPELINE: 1020 m SHEET 2 6
0.15M OD
OD 0.20M 0.20M
0.20M 0.20M
0
3332
315
98 BR-7
1012
0P.5-13
1026
1025
8
A 8.O1014
BR-74 m
1021 1024
@122 T
BR-87
@88 T
1005 10221023
@181
3374 88.53M 1020
323 1018
314 324
M
6
322 1003 60
P-19
P-26
1019
.OT
TAIL 1004 1013
9m
1017
.O
1002 1043
3
313 AP-8
326 25.76m6 412
327 1392.309m 5.7 2 3407 30 AP-10
3352 325
J-189 AP-7 J-199 1001 1812.751m P-71 1044
P-17 1229.708m P-23 3408
3406 AP-9
P-237
297
312
0
410
0 0 P-25
413 1512.933m 0
0 998
3372
995
1046
411 422
2070
1000
J-19
1830
990
1392.31
1812.75
1860
1890
1920
1950
1980
2010
1020
2040
1050
1380
CD
1080
1110
1350
1140
1290
1320
1170
1200
1260
180B
1229.71
1230
1738.15M
300
10491048
14B
1770
421
174
1710
1440
@ -75.
1680
30
1650
1470
BR-1
1620
P-72
1590
10R-84
330 3371
FLOW
1560
1500
311
-10
30
1530
BR-1
1512.93
0R
@1392
420
1
310 47. 328 408 3357 409 997 1050
35
8
999
P-2
329 17
13 T
996
DIRECTION 308
3358 60 3405 423
P-73
81
3.83
m
3356 414 419 60 3373
.OT
309
O
332 3367
7
407 3334 3364 3370
BR-
m
3333 994
P-2
406 90 86.32 991
335 333 424 90
331 399 418 3368 3369
334 400 405 415
BR-81;BR-84
BR-74;BR-75
BR-87
OL-17
CD-1
AV-1
340
339
338
337
336
FLOW
DIRECTION 301
SR. SYMBOL SR.
300 NO.
PARTICULARS
NO.
PARTICULARS SYMBOL
J-190
J-199
2. Other minor crossings and provision of specials shall be as per approved typical drawing.
Node 3. Vertical bends below 10 deg. should be taken care of by bending the pipes during
17
execution.
4. The chainages shown in the drawing may vary during execution as per site condition
and field boundaries.
DI-K7
Diameter (mm) 5. Thrust Block and Anchor block locations are tentatively shown. The actual provision
700MM shall be as per approved detailed drawings for Thrust Blocks and Anchor Blocks.
6. Network under flood zone should be executed with precaution against floatation and
erosion. If necessary, precautionary measures should be taken.
48.44 339.83
47.99 339.75
339.67
339.59
47.32 339.51
46.64 339.43
45.97 339.36
45.29 339.28
339.12
43.62 339.05
43.86 338.97
43.18 338.89
42.87 338.86
43.85 338.82
43.48 338.74
43.11 338.67
42.57 338.56
42.36 338.52
41.99 338.45
41.62 338.38
40.87 338.23
40.51 338.16
40.13 338.08
39.76 338.01
38.19 337.94
39.15 337.87
39.05 337.84
37.48 337.73
38.61 337.66
38.47 337.53
337.46
36.42 337.33
44.89 339.2
42.74 338.6
41.24 338.3
38.92 337.8
38.54 337.6
36.79 337.4
7. The location of the valves shown in the LS is tentative and it shall be decided as per the
HGL (m) ground condition during execution.
8. Scour valve should be placed 0.3 to 0.5 m above the lowest valley point to avoid
submergence of scour valve.
46.8
43.3
37.2
Depth of cutting (m)
291.39 289.45 290.19 2.14
ENGINEERS LIMITED
G VPR ENGINEERS LIMITED
Ground level (m)
ALIGNMENT PLAN & L-SECTION DRAWING FOR
BRANCH-1/ FROM CH. 1020 m TO 2040 m
AMODI (ID NO-193)
1020
1050
1080
1110
1140
1170
1200
1260
1290
1320
1350
1410
1440
1470
1560
1590
1620
1650
1680
1710
1740
1770
1860
1890
1920
1950
1980
2010
2040
Chainage (m)
GVPR/OD-13/193/LS/1005
GVPR/OD-13 SHEET 2 OF 6