MEGA LIFT IRRIGATION PROJECTS, CLUSTER NO.

-XIII
TRENCHING DETAILS
DI / HDPE PIPE L-SECTION OF AMODI LIFT IRRIGATION SCHEME
MIN 1.0M MIN 1.0M
BRANCH-1/ FROM CH. 1020 m TO 2040 m

OD OD
TOTAL LENGTH OF PIPELINE: 1020 m SHEET 2 6
0.15M OD
OD 0.20M 0.20M
0.20M 0.20M

0
3332
315
98 BR-7
1012
0P.5-13
1026
1025
8
A 8.O1014

BR-74 m
1021 1024

@122 T
BR-87
@88 T
1005 10221023

@181
3374 88.53M 1020
323 1018
314 324
M

6
322 1003 60

P-19
P-26
1019

.OT
TAIL 1004 1013

9m
1017

.O
1002 1043

3
313 AP-8
326 25.76m6 412
327 1392.309m 5.7 2 3407 30 AP-10
3352 325
J-189 AP-7 J-199 1001 1812.751m P-71 1044
P-17 1229.708m P-23 3408
3406 AP-9
P-237
297
312
0
410
0 0 P-25
413 1512.933m 0
0 998
3372
995
1046
411 422

2070
1000
J-19

1830
990

1392.31

1812.75

1860

1890

1920

1950

1980

2010
1020

2040
1050

1380

CD
1080

1110

1350
1140

1290

1320
1170

1200

1260

180B
1229.71
1230

1738.15M
300
10491048

14B

1770
421

174
1710
1440

@ -75.
1680
30

1650
1470
BR-1

1620

P-72
1590
10R-84
330 3371
FLOW

1560
1500
311

-10
30

1530
BR-1

1512.93

0R
@1392
420

1
310 47. 328 408 3357 409 997 1050
35

8
999

P-2
329 17

13 T
996
DIRECTION 308
3358 60 3405 423

P-73
81
3.83

m
3356 414 419 60 3373

.OT
309

O
332 3367

7
407 3334 3364 3370

BR-

m
3333 994

P-2
406 90 86.32 991
335 333 424 90
331 399 418 3368 3369
334 400 405 415

BR-81;BR-84

BR-74;BR-75
BR-87

OL-17

CD-1
AV-1

340
339
338
337
336
FLOW
DIRECTION 301
SR. SYMBOL SR.
300 NO.
PARTICULARS
NO.
PARTICULARS SYMBOL

299 1 INVERT R.L. OF PIPE 14 SURVEY BOUNDARY


2 H.G.L. 15 SURVEY NUMBER 42
298 3 GROUND LEVEL 16 BORE WELL / WELL
297 4 MAJOR / B T ROAD 17 MAIN DISTRIBUTORY
296 5 CARTRACK / METAL ROAD 18 MINOR
6 BUTTERFLY VALVE 19 SUB MINOR
295 7 AIR VALVE 20 VILLAGE POND FEEDING PIPE LINE
294 8 SCOUR VALVE 21 DISNET NOMENCLATURE RM 1
9 VILLEGE BOUNDARY 22 IRRIGATION WATER OUTLET
293 10 TANK / POND 23 VILLAGE POND WATER OUTLET
292 11 H T LINE 24 OUTLET NUMBER 23
12 VILLAGE AREA 25 JUNCTION NUMBER
291 13 CHAK NUMBER & AREA 176
THRUST/ANCHOR BLOCK 26 3.64
290
289
Datum:288 1. Special crossings such as National Highway crossing, Railway crossing etc. should
be got approved from competent authority.
J-189

J-190

J-199
2. Other minor crossings and provision of specials shall be as per approved typical drawing.
Node 3. Vertical bends below 10 deg. should be taken care of by bending the pipes during
17
execution.
4. The chainages shown in the drawing may vary during execution as per site condition
and field boundaries.
DI-K7
Diameter (mm) 5. Thrust Block and Anchor block locations are tentatively shown. The actual provision
700MM shall be as per approved detailed drawings for Thrust Blocks and Anchor Blocks.
6. Network under flood zone should be executed with precaution against floatation and
erosion. If necessary, precautionary measures should be taken.
48.44 339.83

47.99 339.75

339.67

339.59

47.32 339.51

46.64 339.43

45.97 339.36

45.29 339.28

339.12

43.62 339.05

43.86 338.97

43.18 338.89
42.87 338.86
43.85 338.82

43.48 338.74

43.11 338.67

42.57 338.56
42.36 338.52

41.99 338.45

41.62 338.38

40.87 338.23

40.51 338.16

40.13 338.08

39.76 338.01

38.19 337.94

39.15 337.87
39.05 337.84

37.48 337.73

38.61 337.66

38.47 337.53

337.46

36.42 337.33
44.89 339.2

42.74 338.6

41.24 338.3

38.92 337.8

38.54 337.6

36.79 337.4
7. The location of the valves shown in the LS is tentative and it shall be decided as per the
HGL (m) ground condition during execution.
8. Scour valve should be placed 0.3 to 0.5 m above the lowest valley point to avoid
submergence of scour valve.

Working Pressure (m)


48.6

46.8

43.3

37.2
Depth of cutting (m)
291.39 289.45 290.19 2.14

291.76 289.82 290.56 2.14

292.28 290.33 291.08 2.14

292.79 290.85 291.59 2.14

293.92 291.45 292.19 2.67

294.12 292.05 292.79 2.27

294.61 292.66 293.39 2.15

296.23 293.57 294.31 2.86

295.83 293.89 294.63 2.14

295.43 293.49 294.23 2.14

295.11 293.17 293.91 2.14

1380 295.71 293.78 294.52 2.14

296.2 294.23 294.97 2.17

296.56 294.53 295.26 2.23

296.93 294.82 295.56 2.31

1500 297.22 295.13 295.86 2.29


1512.93297.33 295.29 295.99 2.24
1530 297.47 295.42 296.16 2.25

297.75 295.72 296.46 2.23

298.04 296.02 296.76 2.22

298.61 296.62 297.36 2.19

298.89 296.92 297.65 2.17

299.18 297.21 297.95 2.17

299.46 297.52 298.25 2.14

299.75 297.81 298.55 2.14

1800 300.11 297.98 298.72 2.33


1812.74300.17 298.09 298.79 2.28
1830 300.2 298.14 298.88 2.26

300.25 298.32 299.05 2.14

300.47 298.31 299.05 2.36

300.55 298.32 299.06 2.44

300.5 298.33 299.06 2.37

300.26 298.33 299.06 2.14

300.61 298.67 299.41 2.14

300.91 298.97 299.71 2.14


1229.7 295.19 293.29 293.99 2.1

1392.3 295.99 294.09 294.79 2.1

298.32 296.32 297.06 2.2

Pipe top RL (m)

Pipe invert RL (m) XIII

ENGINEERS LIMITED
G VPR ENGINEERS LIMITED
Ground level (m)
ALIGNMENT PLAN & L-SECTION DRAWING FOR
BRANCH-1/ FROM CH. 1020 m TO 2040 m
AMODI (ID NO-193)
1020

1050

1080

1110

1140

1170

1200

1260

1290

1320

1350

1410

1440

1470

1560

1590

1620

1650

1680

1710

1740

1770

1860

1890

1920

1950

1980

2010

2040
Chainage (m)

GVPR/OD-13/193/LS/1005
GVPR/OD-13 SHEET 2 OF 6