Professional Documents
Culture Documents
(Mechanical) CMD Roof Works: Tamimi Global Co - LTD
(Mechanical) CMD Roof Works: Tamimi Global Co - LTD
(SHARQ) ( MECHANICAL)
COMPANY: NEW
MOS CMD ROOF WORKS TAMIMI GLOBAL REVISED
CO.LTD
JOB LOCATION (Plant) :CMD Area:
Name
Date
APPROVED BY
Signature
DISTRIBUTION LIST
Eastern Petro Chemical Company JOB DESCRIPTION: ELEVATED WORK DATE: JSA TYPE:
(SHARQ) ( MECHANICAL)
COMPANY: NEW
MOS CMD ROOF WORKS TAMIMI GLOBAL REVISED
CO.LTD
JOB LOCATION (Plant) :CMD Area:
INDEX
1. PRELIMINARY ACTIONS
2. EXECUTION
4. RESPONSIBILITIES
5. MATERIAL
6. WORK PROCEDURE
7. SAFETY
Eastern Petro Chemical Company JOB DESCRIPTION: ELEVATED WORK DATE: JSA TYPE:
(SHARQ) ( MECHANICAL)
COMPANY: NEW
MOS CMD ROOF WORKS TAMIMI GLOBAL REVISED
CO.LTD
JOB LOCATION (Plant) :CMD Area:
1. PRELIMINARY ACTIONS
To perform site visit to identify the web profile and sandwich panel specifications.
After confirmation of the specifications need to purchase the same web profile and
corrugated sheet from the market
During site visit need to perform water leak test on weekends so that building
employees are not affected.
Identifying the leakages and prepare the leakage report and submit for client’s
approval
Based on the report and site visit procure the corrugated sheets and necessary
accessories for the affected area
2. Execution
Apply necessary sealants, bead flowmastic rolls so that the sheets are intact.
Remove existing eave gutter along with downspout at west side and install new
with all the required accessories.
Eastern Petro Chemical Company JOB DESCRIPTION: ELEVATED WORK DATE: JSA TYPE:
(SHARQ) ( MECHANICAL)
COMPANY: NEW
MOS CMD ROOF WORKS TAMIMI GLOBAL REVISED
CO.LTD
JOB LOCATION (Plant) :CMD Area:
3. Scope of Work
Assessment with complete inspection and repair of leakage from MTC roof
This document addresses the different procedural processes involved in Roof /cladding
sheet installation process for execution job.
3.1. Equipment’s
Crane(2 nos-160T) with man-basket
Rigger with radio
Sling belt and Rope for material shifting.
Dyna truck.
3.2. Tools.
Drill machine
Scaffolding
Grinding Machine
Screw gun
hand cutter
Rivet gun.
Silicone gun
Cutting machine
3.3. Materials
Sandwich panel Roof sheet / cladding sheet
Stitch screw
Bead mastic sealant, silicone sealant
Rivet
Cutting disc
Eastern Petro Chemical Company JOB DESCRIPTION: ELEVATED WORK DATE: JSA TYPE:
(SHARQ) ( MECHANICAL)
COMPANY: NEW
MOS CMD ROOF WORKS TAMIMI GLOBAL REVISED
CO.LTD
JOB LOCATION (Plant) :CMD Area:
2. RESPONSIBILITIES.
The responsibility and Discipline for Site Engineer, Supervisor and Foreman with
assistance are described. Similarly, they shall ensure that the needed drawings are of
latest revisions. The HSE inspection shall take place before works starts to ensure that the
work area is safe i.e. adequate access, checking the supports, crane with man-basket and
scaffold inspections, etc. if applicable.
These all concern is under assist by the Area Owner / plant In-charger.
3.4. Engineer
Supervise operations in accordance with the approved Method Statement,
Specifications, material submittals and schedules to achieve the acceptance of the
project deliverables.
Everyone know about the JSA and it will explained to the employee.
does not comply with the procedures. Will advise for Health & Safety requirements and
monitor the Hazard controls implemented on site as per the Plant rules.
3. MATERIAL:-
Material Shifting
Plan A: - All Material are stock by heavy scaffolding Tower.
Plan B: - Material shifted by crane one by one.
4. WORK PROCEDURE:-
General: - we are suggesting two plan to execute
Plan A: - Using scaffolding tower with life-line up to 3 m extension from the tower.
If scaffolding is not allowed to install over the roof sheet then they are connecting their
safety harness to sling (3-5m length) and that sling into scaffolding.
Now they nearer to the roof center of the ventilation area and remove the old Sandwich
Panel using Screw machine.
After install the new pieces using drill machine and screw gun. And one of the roof sheet
must be open space.
Due to the breaking of locking system easily. And tool are tied with rope and harness.
5. SAFETY
Man lift & Crane operator and rigger must be qualified for his job
Fall Prevention Plan (FPP) is required to be implemented for steel structure & fabric
installation at work places.
• For fall prevention production & Personal fall prevention equipment;
• Responsibilities;
• Hazard identification and risk assessment (RA);
• Control measures and methods;
• Safe work procedures;
• Inspection and maintenance;
Safe access to the fabric roof must be carefully planned in order to select the most
appropriate method and equipment.
• Reduce the amount of time spent working on the single roof;
• Reduce the amount of travelling around the single roof to collect materials;
• Reduce the possibility of stray work materials falling off the roof and injuring the
person below.
If lifting operations by cranes are required, refer to the JSA and lifting plan of Practice
for Lifting operations for guidance.
If the lifting equipment is mounted near the edge of Located near the center roof, it is
important that suitable workers.
The JSA have the detail safety analysis to execute it. This is just a procedure to
execution for the job.
*************************************