Professional Documents
Culture Documents
Solar Analysis: Prepared For: Prepared by
Solar Analysis: Prepared For: Prepared by
Solar Analysis: Prepared For: Prepared by
Prepared for:
Prepared by:
Dylan Wolman
Mike Perkins
3225 SW Hamilton St
mperkins@powernw.com
CCB# 229987
About Us - Power Northwest
We believe in quality
NABCEP Certified Installers
Tier 1 Panels with full 25 year warranties
10 Year Workmanship Warranty
Production Guarantee
System approach to solar
The Energy Experts at Power Northwest will help
you get the very most out of your solar system and
home energy usage by highlighting opportunities
such as energy efficient equipment, gas to electric
conversions, and battery storage.
$80/ mo
523 kWh / mo
6,281 kWh / yr
Environmental Consumption
Your New System
average energy
6,489 kWh produced the first
year
kWh
800
600
400
200
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Production Consumption
Your System
How much will I save?
$955 $741
$58,034 $32,029
Financing Example*
Solar Loan
Term 15 Years
Down Payment $0
Interest Rate 4.24%
Initial Payment / mo $160
*Loan amounts may vary based on loan approval. Rates based on 740 credit score.
Additional Benefits
4.1% 6.83%
Increased Home Value Return on Investment
According to a study by Put your money to work for
, homes with solar you and earn a tax free return
sell for 4.1% more than on investment with relatively
homes without.
no risk.
The information provided in this proposal, such as savings calculations, is based on the following assumptions:
Utility Assumptions:
Utility Company — Portland General Electric Co
Current Utility Rate — 7 Residential
Current Estimated Annual Utility Bill — $955
Annual Utility Price Increase Rate — 5.0%
System Design:
(17) REC REC400AA Pure Black
(17) Enphase Energy Inc. IQ8PLUS-72-2-US
System Size — 6.80kW
Annual System Degradation due to soiling and general wear — 0.5%
Total System Cost — $23,243
Estimated First Year Production - 6,489kWh
Financial Assumptions:
Energy Trust Incentive — $1,960
information that
you have provided us. We based the
system size, design, configuration, utility rates, applicable rebates, tax
benefits realized, and your household's energy usage off of this information.
All energy pricing models are based on historical
data, assumed cost
escalation, and assumed degradation rates. Annual electric generation will vary
year to year and the
modeling is based on averaged data provided by third
parties.
Sign Contract Site Visit Permits Installation Utility Approval Power Up!
Today!
3-5 days
4-6 weeks
2-5 days
1-2 weeks
Start saving
Review and sign Finalize design City permitting Installation and Utility Connection money and the
proposal and prepare and approvals Inspections
Net Metering environment
drawings