OPERATION

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

standar

d time
observe ratin norma allowanc output/
total in
d time g l time e hour
OPERATIO standar minute
N OBSERVATIONS d time s

1 2 3 4 5 6 7 8 9 10
1. Place
the paper
10. 7. 5.
at the 8.3 5.8 6.6 8.1 7.7 5.7 7.3
8 7 7
center of
the jigs 73.6 2.5 0.30 0.72 0.02 0.74 0.01 4851
2. Fold the
upper 10. 12. 10. 5. 5.
8.3 5.1 7.4 6.3 4.8
corner of 3 3 6 3 5
the A4 75.9 2.5 0.25 0.62 0.02 0.64 0.01 5653
Fold the A4
10. 5. 4.
paper into 8.0 5.9 5.0 6.5 9.6 7.4 8.9
7 5 1
crosswise 71.5 2.4 0.24 0.57 0.01 0.58 0.01 6185
4. Remove
11. 4. 3.
the upper 7.9 6.9 6.6 7.7 9.7 9.7 8.7
2 1 9
jigs 76.3 2.5 0.23 0.58 0.01 0.59 0.01 6088
5. Place
10. 11. 11. 5. 4.
the final 8.7 9.8 8.6 6.5 4.4
6 0 0 3 6
jigs 80.5 2.7 0.26 0.69 0.02 0.70 0.01 5107
6. Fold the 3. 4.
5.4 3.7 4.8 3.5 4.4 2.6 3.7 4.8
final wings 4 2 40.6 1.4 0.22 0.29 0.00 0.30 0.00 12048
7. Fold the 2. 1.
5.7 6.2 9.4 7.2 5.6 3.1 4.5 3.7
final tail 4 9 49.7 1.7 0.18 0.29 0.00 0.30 0.00 12134
8. Finally
fold the
wings,
14. 11. 6. 8.
center and 4.3 3.5 6.8 7.0 3.9 6.8
8 9 9 2
removed
the final
jigs 74.1 2.5 0.17 0.41 0.01 0.42 0.01 8534
9. Arrange
17. 17. 13. 11. 12. 10. 10. 9. 9.
the final 9.5 121.
8 6 4 2 7 9 0 5 2
output 7 4.1 0.23 0.92 0.04 0.96 0.02 3740

Total
cycle
time 5.24 0.09 687
OPERATION OBSERVATIONS TOTAL OBSERVE RATING NORMAL ALLOWANCE STANDARD OUTPUT/
TIME RATING STANDARD TIME IN HOUR
TIME MINUTES
1. assemble
magazine
2. screwing
magazine
3.attach
spring in air
pump
4. attach air
pump, slide
& trigger
5.assemble
inner body
6. screwing
back part
7. screwing
front part
8. attach air
release, air
pump &
pump spring
9. screwing
& attach
slide
10. attach
magazine
grip
11.
inspection
12.
packaging
TOTAL CYCLED TIME

NAME:

You might also like