C. Indirect material
D. Labor
Answer: Direct labor
7. The available capacity can be increased by ________
A. Limiting subcontracting
B. Using fewer workers
C. Rerouting away from other work centers
D. Scheduling overtime
Answer: Scheduling overtime
8. The transit time between work centers is _____.
A. run time
B. move time
C. setup time
D. wait time
Answer: move time
9. Raw Materials and WIP can be classified under ________
A. Indirect Material
B. Direct Material
C. Finished Material
D. Standard Parts
Answer: Direct Material
10. _________ are the basic materials which have not undergone any conversion since their receipt from
suppliers.
A. WIP
B. Raw Material
C. Finished Parts
D. Work Made Parts
Answer: Raw Material
11. Buying according to the requirements is called ________
a. Seasonal Buying
b. Hand to mouth buying
c. Scheduled Buying
d. Tender Buying
Answer: Hand to mouth buying
12. Which is not a part of 5R’s of buying?
a. Right Quality
Livemcqs.com
Livemcqs.com
b. Right Quantity
c. Right Source
d. None of the above
Answer: None of the above
13. The business cycle, price trends, National Economy is ___________
a. Micro Factors
b. Macro Factors
c. Controllable Factors
d. None of the above
Answer: Macro Factors
14. __________ also called part lists or building lists is the document generated at the design stage.
a. MRP (Material Requirement Planning)
b. BOM (Bill of Materials)
c. MPS (Master Production Schedule)
d. None of the above
Answer: BOM (Bill of Materials)
15. Purchasing responsibilities can be divided into Buying, Clerical and ________ division.
a. Packing
b. Traffic
c. Record
d. Follow up
Answer: Traffic
16. Materials Management has an important role in ______ management.
A. Production
B. Supply chain
C. Operations
D. All of the above
Answer: All of the above
17. The first activity of Purchasing cycle is _____________
a. Communicating requirement to the purchase
b. Source Selection and development
c. Recognizing the need for procurement
d. Inspection of goods
Answer: Recognizing the need for procurement
18. ________ is the time that elapses between issuing replenishment order and receiving the material in
stores.
Livemcqs.com
Livemcqs.com
a. Replenishment time
b. Lead time
c. Idle-time
d. None of the above
Answer: Lead time
19. _________ is the scientific technique for planning the ordering and usage of materials at various levels of
production and for monitoring the stocks during these transactions.
a. MPS
b. MRP
c. BOM
d. None of the above
Answer: MRP (Material Requirement Planning)
20. _________ is the task of buying goods of the right quality, in the right quantities, at the right time and at
the right price.
a. Supplying
b. Purchasing
c. Scrutinizing
d. None of the above
Answer: Purchasing