Renov Admin CR
V. Replacement of Fixtures
Water Closet t6 (its )with bidet and compl
10 sets 15,000.00 1,800.00 178,500 00
acc
1,050.00 17,650.00
Urinal with auto flush 4 sets 15,000 00 1,800.00 1,050_00 17,850.00 71,400.00
(1 2 x 2 4 ) Mirror with Casing 4 sets 3,500.00 420.00 245.00 4,165.00 16,660.00
Lavatory Counter Top 9 sets 6 000 00 720.00 420.00 7,140.00 64260.00
with upright Faucet and complete acc Material Cost: 330,820.00
4" diem LED slim type pinlight 12 seta 450.00 54.00 31.50 535.50 6,426 00
Material Cost: 31,854.00
Material Cost: 321,347.60
Labor Cost: 119,070.92
.... 1 _ TOTAL ESTIMATED PROJECT COST: 1,066,254.52