2. Scope : This procedure applies to all works for gas system in this project.
3. Responsibility:
- The Project Manager, Site Engineers, WSH Personnel and Supervisors shall be responsible in ensuring that the
area is safe for work before any work has to commence;
- The WSH personnel and Site Supervisors shall ensure that proper precaution has been taken before using any
machine or tools in carrying out the work and in lifting heavy pipe for installation in high level;
4. Procedure:
Mobilization & Demobilization – Material or Equipment:
- Pre-job meeting.
- Safety induction and train personnel for the work activities including statutory requirements (Trained, Qualified and
Authorized).
- All site personnel to attend maincon safety induction course.
- Tool box meeting to be conducted daily to briefing & training.
- Provided of banksman for traffic.
- Ensure that you know your body condition, physical limitations and the approximate weight of goods. Ask
for assistance when necessary.
- The use of lifting and moving equipment such trolley, pallet-jack and fork-lift should be considered and employed
where necessary.
- Make sure the loading / unloading area is even and not obstructed. Maintain good housekeeping to prevent slip
and trip hazards.
- Be aware of hazardous and unsafe conditions around you.
- Stack the cartons and properly secure loads on pallets, trolleys, trucks and forklifts so that goods will not slip and
fall off. Use film-wrap for enhanced securing of cartons on pallet when necessary.
- Ensure proper lighting is provided in the loading /unloading area and warehouse area.
CRIMSON & PENGUIN RESTAURANT @ MANDAI LAKE ROAD (MANDAI BIRD PARK) Page 1
SAFE WORK PROCEDURE
- When climbing up and down from truck, use the handle and foot support so that you will not twist or strain your
body.
- No horse-play during the loading, unloading and transportation of goods.
- Use appropriate work aid tools such as trolleys, pallet jack to carry/lift the heavy loads.
- Proper access path are provided at storage and Loading/ unloading area.
- Obstacles should be removed before commencing the loading/unloading activities.
- Educate and train workers on the proper manual handling techniques.
- Safety boots and gloves are to be worn.
- Ensure that vehicles maintain a safe distance behind the work area.
Storage of Materials:
- Proper PPE must worn.
- More than one person to lift up heavy material.
- Use the correct lifting methods (Lift up with your legs and not your back).
- Watch where you walk, be observant of co-workers.
- Beware of sharp edges, and hazardous materials.
- Maintain a safe working distance between co-workers.
- Use the correct tools for the task to platform.
- Beware of failing materials.
- Smoking to be carried out in manner and area as per site policy.
Drilling Works:
- Pre site inspection to be carried at area of work to ensure there is not hidden
services lines.
- Electrical tools are to be protected by RCCB or double insulted.
- LEW to conduct monthly check on it that is in good working condition.
- Ensure electrical cord has no defects and hangs 2m above the ground level.
- Must provide buddy system, safety harness, proper lifeline if there is work-at-
height.
- Must worn safety dust mask, ear plug, safety glass and safety hand gloves.
Installation of Brackets:
- Conduct tool box meeting by supervisor.
- All installation pipes shall be kept clean and free of all foreign materials.
- All pipe opening shall be covered when no person is attending to the
installation work.
- The installation pipes shall be adequately supported at all times.
- Gas pipes shall be prevented from physical contact with other services.
- Apply PTW.
- Must worn appropriate PPE.
Cutting of Pipes:
- Examine the power cord, extension lead, plugs, sockets and power outlet for
damage.
- Ensure that the grinding disc, guard, handle are secured and correctly fitted.
- Inspect the grinding disc or cutting disc for damage. Do not use damaged disc.
- Never make adjustments while the machine is running.
- Keep flexible electrical cords clear of oil, grease, machines and sources of
heat.
- Be aware of flying sparks.
- Avoid trip hazards & prevent damage to electrical cord.
- Must worn proper PPE.
- Provide proper signage.
Paint Works:
- Provided and use adequate and appropriate PPE.
- Paint should be stored in a dry and in a designated area and should be away from other
flammable materials.
- “No-smoking” signs to be put at the paint storage area.
- A fire extinguisher is to be placed at the storage area.
- When carrying out painting works, site supervisor is to ensure there are no other hot works
being carried out in the same area.
- Conduct training on proper lifting methods.
- Implement job rotation.
- Ensure adequate ventilation during painting.
- Use non-drip roller.
- Practice good housekeeping.
Maintenance Works:
- The maintenance works shall be carried out regularly by a competent person.
- Test the gas installation for gas tightness.
- Check to ensure the identification markings on gas pipes are intact.
- Check to ensure no unauthorized work has been carried out.
- Check to ensure all valves are operating and functioning satisfactorily.
- Test to ensure the gas pressure is within the supplied range.
- Test the operation of the gas appliances and ensure that they are working safely and satisfactorily.
- Clean up any oil spill immediately.
- Must worn proper PPE.
Emergency Occurrence:
- Follow Maincon / Owner Emergency response plan.
- If any emergency situation activate emergency plan and emergency response team to mitigate
emergency situation.
Housekeeping:
- Monitoring all work areas and store area.
- Clean up accumulated dirt and debris as necessary before the end of each shift.
- Keep stored equipment clean and organized.
- Keep paint storage areas clean and organized.
- Store pipes and fittings in proper area storage according to size.
- Keep your working area clean while working to prevent tripping and slipping hazards.
Human Factor (Foreign Workers Who Are Not Familiar With The Local Working
Environment):
- Briefing workers on the proper housekeeping during task briefing.
- Barricade the area with warning signs.
- Training will be given to workers on the proper housekeeping techniques.
- Housekeeping will be carried out regularly.
- Worker must wear proper PPE as according to main-contractor requirement.
Working Under Adverse Weather (Exposure To Hot Weather, Lightning & Hazy Condition):
- Activate emergency plan and emergency situation.
- Follow range construction emergency response plan.
- Worker must wear proper PPE as according to main-contractor requirement.
Terrorism Threat:
- Ensure all attending SIC to produce the original ID for verification.
- Any suspicious items or personnel seen on site must be reported immediately to main contractor.
- Security guard must be alert at all times to suspicious vehicles left abandoned or seen repeatedly
driven around the site on different occasions.
- Relevant information of SG Secure to update the workers.
- Get workforce to be familiar with “Run, Hide & Tell and “ Press, Tie and Tell”
- Brief the workforce on the lock down procedure.
- Adhere to Main Con Emergency Evacuation Procedure.
- Familiar with Emergency Evacuation route
Covid-19:
- Follow & update on COVID 19 advisories at Government Websites.
- Records Body temperature twice daily (morning & afternoon).
- Maintain social distancing (at least 1-1.5m apart) at all times.
- Good respiratory hygiene (Always cover mouth and nose with tissue when coughing or sneezing,
dispose tissue into bin and wash hand).
- Arrange all staffs/members to attend Covid Safe Training Course.
- Download Trace Together Apps for tracing contact purpose.
- Appoint SMO/SDO to assist in implementation & Coordination of Safe Management of work
place/site.
- Appoint SMO/ SDO to conduct, remind & update & health records of worker. Provide hands
sanitizer when washing bay not available.
- Regularly disinfection of equipment and work surface.
- Put in place an evacuation plan for suspected case as well as for other site personnel.
- Any employee who is feeling unwell or showing mild symptoms to leave the workplace & consult
doctor immediately. Track & record these cases as part of safe management measure.
- Carry out a thorough cleaning & disinfect all relevant on site area and assets exposed to confirm