500 SERIES

BERAWA APARTMENTS - DETAILS


B C

0,90 11,30
+12.25

0,40

0,40
+12.45
POOL TOP +13.45
+12.65
1,00 0,30 9,70 0,30

1,50
+12.85

+13.05

+13.25

2,10
POOL FFL +13.05

1,00
+13.45

0,30 1,30
0,60 1,60
6,00

5,20
A 2,70 A

+13.45 POOL FFL +12.25

11,30
11,00
0,40
0,40

0,40
POOL TOP +13.45

POOL PLAN
B C

HEVEATECH WOOD 30mm, EXTERIOR PAINTING, EXTERIOR PAINTING, CEMENT TILE 20x20,
NATURAL COAT COL. DARK GREY COL. DARK GREY COL. GREENISH GREY

0,60 0,30 1,30 9,70 0,30


CEMENT TILE 20x20, CEMENT TILE 20x20,
0,10

COL. GREENISH GREY COL. GREENISH GREY


FFL +13.45 FFL +13.45 FFL +13.45
WATER LEVEL
FFL +13.35

0,40
CEMENT TILE 20x20, CEMENT TILE 20x20, CEMENT TILE 20x20,
FFL +13.05
COL. GREENISH GREY COL. GREENISH GREY COL. GREENISH GREY
1,20
1,10

CEMENT TILE 20x20,


CEMENT TILE 20x20, CEMENT TILE 20x20, COL. GREENISH GREY

0,80
COL. GREENISH GREY COL. GREENISH GREY

COWORKING SPACE
FFL +12.25 FFL +12.25
11,30

SECTION A-A

NOTE PROJECT TITLE CLIENT REVISION LOCATION DRAWING TITLE PRINT SIZE SCALE DATE DRAWING NUMBER DESIGNED BY

The drawing is the property of El Colectivo Hub. Copyright is reserved by them and the document
is issued on the condition that is not copied, reproduced, retained by or disclosed to any
unauthorized persons, either wholly or in part, without the written consent of El Colectivo Hub
BERAWA APARTMENTS ARVIND MOHINDRA
BERAWA
CANGGU, BALI BA POOL DETAIL 1 A3 1/50 FEBRUARY 2019 BA - A - 501
B C

0,90 11,30
+12.25

0,40

0,40
+12.45
POOL TOP +13.45
+12.65
1,00 0,30 9,70 0,30

1,50
+12.85

+13.05

+13.25

2,10
POOL FFL +13.05

1,00
+13.45

0,30 1,30
0,60 1,60
6,00

5,20
A 2,70 A

+13.45 POOL FFL +12.25

11,30
11,00
0,40
0,40

0,40
POOL TOP +13.45

POOL PLAN
B C

EXTERIOR PAINTING, EXTERIOR PAINTING, EXTERIOR PAINTING, HEVEATECH WOOD 30mm, HEVEATECH WOOD 30mm, EXTERIOR PAINTING,
COL. DARK GREY COL. DARK GREY COL. DARK GREY NATURAL COAT NATURAL COAT COL. DARK GREY
1,20

1,20
6,00 6,00
0,40 1,10 1,00 3,10 0,40 0,40 0,40 2,70 2,10 0,40
CEMENT TILE 20x20, CEMENT TILE 20x20, CEMENT TILE 20x20, CEMENT TILE 20x20,
0,10

0,10
CEMENT TILE 20x20, COL. GREENISH GREY CEMENT TILE 20x20, COL. GREENISH GREY CEMENT TILE 20x20, COL. GREENISH GREY COL. GREENISH GREY COL. GREENISH GREY COL. GREENISH GREY COL. GREENISH GREY
FFL +13.45 FFL +13.45 FFL +13.45 FFL +13.45 FFL +13.45 FFL +13.45
WATER LEVEL
FFL +13.35
FFL +13.25 CEMENT TILE 20x20,
CEMENT TILE 20x20,

0,40
CEMENT TILE 20x20, CEMENT TILE 20x20, COL. GREENISH GREY
COL. GREENISH GREY
HEVEATECH WOOD COL. GREENISH GREY COL. GREENISH GREY
CEMENT TILE 20x20, CEMENT TILE 20x20,
FFL +13.05 30mm, NATURAL COAT FFL +13.05
COL. GREENISH GREY COL. GREENISH GREY
CEMENT TILE 20x20, CEMENT TILE 20x20, CEMENT TILE 20x20, CEMENT TILE 20x20,
COL. GREENISH GREY COL. GREENISH GREY COL. GREENISH GREY COL. GREENISH GREY
FFL +12.85
1,20

1,20

1,20
1,10

1,10
FFL +12.65

0,80
FFL +12.45
3,10 3,10
COMMON AREA COMMON AREA
CEMENT TILE 20x20, CEMENT TILE 20x20, PUMP ROOM
FFL +12.25 FFL +12.25 FFL +12.25 FFL +12.25 FFL +12.25
COL. GREENISH GREY COL. GREENISH GREY FFL +12.20

SECTION B-B SECTION C-C

NOTE PROJECT TITLE CLIENT REVISION LOCATION DRAWING TITLE PRINT SIZE SCALE DATE DRAWING NUMBER DESIGNED BY

The drawing is the property of El Colectivo Hub. Copyright is reserved by them and the document
is issued on the condition that is not copied, reproduced, retained by or disclosed to any
unauthorized persons, either wholly or in part, without the written consent of El Colectivo Hub
BERAWA APARTMENTS ARVIND MOHINDRA
BERAWA
CANGGU, BALI BA POOL DETAIL 2 A3 1/50 FEBRUARY 2019 BA - A - 502
B C B C

Patok Pip Patok Pip


a a

C'

C C

A A A A

S01 B' B'


Jelinjingan

Jelinjingan
S03 S03 S03 S03 S03 S03

S02

B B
D D D D

A A

1 1
1' 2 1' 2
2' 2'
3 3
3' 4 3' 4
B 4' B 4'
5 5
5' 6 5' 6
6' 6'
Saluran 7 Saluran 7
C C

Jalan Aspal Jalan Aspal

GROUND FLOOR PLAN FIRST FLOOR PLAN

B C B C

Patok Pip Patok Pip


a a

C C

S02
A A A A

B' B'
Jelinjingan

Jelinjingan
S03 S03 S03 S03 S03 S03

S02

B B
D D D D

A A

1 1
1' 2 1' 2
2' 2'
3 3
3' 4 3' 4
B 4' B 4'
5 5
5' 6 5' 6
6' 6'
Saluran 7 Saluran 7
C C

Jalan Aspal Jalan Aspal

SECOND FLOOR PLAN THIRD FLOOR PLAN

NOTE PROJECT TITLE CLIENT REVISION LOCATION DRAWING TITLE PRINT SIZE SCALE DATE DRAWING NUMBER DESIGNED BY

The drawing is the property of El Colectivo Hub. Copyright is reserved by them and the document
is issued on the condition that is not copied, reproduced, retained by or disclosed to any
unauthorized persons, either wholly or in part, without the written consent of El Colectivo Hub
BERAWA APARTMENTS ARVIND MOHINDRA
BERAWA
CANGGU, BALI BA STAIR PLANS A3 - FEBRUARY 2019 BA - A - 503
B NET, CONSTRUCTION
TO CHECK WITH SUPPLIER

40
0,05

197
HEVEATECH WOOD
A A 30 mm NATURAL COAT

40
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
250 50 HEVEATECH WOOD 30 mm

197
NATURAL COAT
300

30
10
0,95
1,05

197
STEEL PLATE 10 mm
50 PAINT. BLACK MATTE

30
10

197
STEEL PLATE 10 mm

15
PAINT. BLACK MATTE

10
STEEL PLATE 10 mm
0,05

3,80 STEEL PLATE 10 mm PAINT. BLACK MATTE


PAINT. BLACK MATTE
PLAN
B

S01 - DETAIL 1 (1:10) S01 - DETAIL 2 (1:10)

FIRST FLOOR FIRST FLOOR FIRST FLOOR


FFL +3.15 FFL +3.15 FFL +3.15

15 15 15

14 14 14

13 13 13

12 12 12

11 11 11

10 10 10

9 9 9

8 8 8

3,15

3,15
3,15

7 7 7

6 6
S01 - DETAIL 2
5 S01 - DETAIL 1 5

4 4

3 3

2 2

1 GROUND FLOOR 1 GROUND FLOOR GROUND FLOOR


FFL ±0.00 FFL ±0.00 FFL ±0.00

3,80 1,05 1,05

SECTION A-A
ELEVATION SECTION B-B
NOTE PROJECT TITLE CLIENT REVISION LOCATION DRAWING TITLE PRINT SIZE SCALE DATE DRAWING NUMBER DESIGNED BY

The drawing is the property of El Colectivo Hub. Copyright is reserved by them and the document
is issued on the condition that is not copied, reproduced, retained by or disclosed to any
unauthorized persons, either wholly or in part, without the written consent of El Colectivo Hub
BERAWA APARTMENTS ARVIND MOHINDRA
BERAWA
CANGGU, BALI BA STAIR 1 DETAIL A3 1/30 FEBRUARY 2019 BA - A - 504
B

0,05
NET, CONSTRUCTION
TO CHECK WITH SUPPLIER

40

207
A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
A
HEVEATECH WOOD
30 mm NATURAL COAT

40
250 50 HEVEATECH WOOD 30 mm

207
NATURAL COAT

0,95
1,05
300
10

30

207
STEEL PLATE 10 mm
50 PAINT. BLACK MATTE

30
10

207
STEEL PLATE 10 mm

15
0,05
PAINT. BLACK MATTE

10
5,30 STEEL PLATE 10 mm
STEEL PLATE 10 mm PAINT. BLACK MATTE
PLAN PAINT. BLACK MATTE
B

S02 - DETAIL 1 (1:10) S02 - DETAIL 2 (1:10)

SECOND FLOOR SECOND FLOOR SECOND FLOOR


FFL +7.70 FFL +7.60 FFL +7.60

21 21 21

20 20 20

19 19 19

18 18 18

17 17 17

16 16 16

15 15 15

14 14 14

13 13 13

12 12 12
4,55

4,55

4,55
11 11 11

10 10 10

9 9 9

8 8 8

7 7
S02 - DETAIL 2
6 6

5 S02 - DETAIL 1 5

4 4

3 3

2 2

1 1
FIRST FLOOR FIRST FLOOR FIRST FLOOR
5,30 FFL +3.15 FFL +3.15 FFL +3.15

1,05 1,05

SECTION A-A ELEVATION SECTION B-B


NOTE PROJECT TITLE CLIENT REVISION LOCATION DRAWING TITLE PRINT SIZE SCALE DATE DRAWING NUMBER DESIGNED BY

The drawing is the property of El Colectivo Hub. Copyright is reserved by them and the document
is issued on the condition that is not copied, reproduced, retained by or disclosed to any
unauthorized persons, either wholly or in part, without the written consent of El Colectivo Hub
BERAWA APARTMENTS ARVIND MOHINDRA
BERAWA
CANGGU, BALI BA STAIR 2 DETAIL A3 1/30 FEBRUARY 2019 BA - A - 505
40

222
HEVEATECH WOOD

40
B 30 mm NATURAL COAT
HEVEATECH WOOD 30 mm

222
250 50
0,05

NATURAL COAT
300 10
A A

30

222
1 2 3 4 5 6 7 8 9
STEEL PLATE 10 mm
50 PAINT. BLACK MATTE

30
0,80

0,70

10

222
STEEL PLATE 10 mm

15
0
PAINT. BLACK MATTE

10
STEEL PLATE 10 mm
STEEL PLATE 10 mm PAINT. BLACK MATTE
0,05

2,30 2,60 PAINT. BLACK MATTE

B 4,90

PLAN
S03 - DETAIL 1 (1:10) S03 - DETAIL 2 (1:10)

9 9 9

8 8 8

7 7 7

6 6 6
2,22

2,22

2,22
5 5 5

4 4
S03 - DETAIL 2

3 3

S03 - DETAIL 1
2 2

1 1

0,80 0,80

2,55 2,35

SECTION A-A ELEVATION SECTION B-B

NOTE PROJECT TITLE CLIENT REVISION LOCATION DRAWING TITLE PRINT SIZE SCALE DATE DRAWING NUMBER DESIGNED BY

The drawing is the property of El Colectivo Hub. Copyright is reserved by them and the document
is issued on the condition that is not copied, reproduced, retained by or disclosed to any
unauthorized persons, either wholly or in part, without the written consent of El Colectivo Hub
BERAWA APARTMENTS ARVIND MOHINDRA
BERAWA
CANGGU, BALI BA STAIR 3 DETAIL A3 1/30 FEBRUARY 2019 BA - A - 506
B D

S9 1% S5 S6 S9
300 S7

300
T4 T4 S8 WALL & FURNITURE FINISHES
1000 1350
T4 T1 RED BRICKS, EXPOSED
T2 TEMPERED GLASS, 10mm, WITH GALVANIZED
T3 T4
250
FRAME, CAR PAINT, BLACK, MATTE.

900

900
T1 T4 S4 S1
T3 TEAK SOLID, 30mm, PAINTED NATURAL, MATTE
100

1% 1% T4 CEMENT TILE, 20x20 cm, COL. GREY


T2
T5 SELECTED MIRROR
T6 STAINLESS STEEL PLATE, 3mm
T4 APARTMENT BATHROOM T4
A FIRST/SECOND FLOOR
FFL +3.15/FFL +7.70
A T7 POLISHED CONCRETE, CLEAR COAT

FLOOR FINISHES

F1 CEMENT TILE, 20x20 cm, COL. GREY


1150
1050

CEILING FINISHES

800

800
F1 F1 C1 NO CEILING, EXPOSED STRUCTURE

FITTINGS (SEE SANITARY SELECTION PAGE)

S1 FLOOR STANDING CLOSET


T1 1300 1050
S2 LAVATORY BOWL
S3 LAVATORY FAUCET

C T7 T1 C S4 HEAD SHOWER
S5 HAND SHOWER
T1

500
S2 S6 SHOWER MIXER
S7 TOILET PAPER HOLDER
T1
S8 JET SPRAY
S3
S9 FLOOR DRAIN

B D

NOTE PROJECT TITLE CLIENT REVISION LOCATION DRAWING TITLE PRINT SIZE SCALE DATE DRAWING NUMBER DESIGNED BY

The drawing is the property of El Colectivo Hub. Copyright is reserved by them and the document
is issued on the condition that is not copied, reproduced, retained by or disclosed to any
unauthorized persons, either wholly or in part, without the written consent of El Colectivo Hub
BERAWA APARTMENTS ARVIND MOHINDRA
BERAWA
CANGGU, BALI BA APARTMENT BATHROOM:
PLAN
A3 1/20 FEBRUARY 2019 BA - A - 507
B

WALL & FURNITURE FINISHES CEILING FINISHES

T1 RED BRICKS, EXPOSED C1 NO CEILING, EXPOSED STRUCTURE


T2 TEMPERED GLASS, 10mm, WITH GALVANIZED
FRAME, CAR PAINT, BLACK, MATTE. FITTINGS (SEE SANITARY SELECTION PAGE)

T3 TEAK SOLID, 30mm, PAINTED NATURAL, MATTE S1 FLOOR STANDING CLOSET


T4 CEMENT TILE, 20x20 cm, COL. GREY S2 LAVATORY BOWL
T5 SELECTED MIRROR S3 LAVATORY FAUCET

A A T6 STAINLESS STEEL PLATE, 3mm S4 HEAD SHOWER


T7 POLISHED CONCRETE, CLEAR COAT S5 HAND SHOWER
S6 SHOWER MIXER
FLOOR FINISHES
S7 TOILET PAPER HOLDER
F1 CEMENT TILE, 20x20 cm, COL. GREY S8 JET SPRAY
S9 FLOOR DRAIN

CFL +5.36/CFL +9.91 CFL +5.36/CFL +9.91

S4 C1 C1 S4
2350 150

810
T4

T1 T4
T4
T4

T6 T4 T4

1150 250 300


T4 T4

350
T6
2210

2210
2110
2100

PLUMBING T2 S6
SHAFT T1 T4
S5 S6 S5

350
T6
700
S7

S1 500 1700

700
600

APARTMENT BATHROOM
FIRST/SECOND FLOOR BATHROOM FIRST/SECOND FLOOR
F1 FFL +3.15/FFL +7.70 F1 FFL +3.15/FFL +7.70 F1 S9
1%

300 200 250 250 150 1550 300


600 1000 1300 250

SECTION A-A SECTION B-B


NOTE PROJECT TITLE CLIENT REVISION LOCATION DRAWING TITLE PRINT SIZE SCALE DATE DRAWING NUMBER DESIGNED BY

The drawing is the property of El Colectivo Hub. Copyright is reserved by them and the document
is issued on the condition that is not copied, reproduced, retained by or disclosed to any
unauthorized persons, either wholly or in part, without the written consent of El Colectivo Hub
BERAWA APARTMENTS ARVIND MOHINDRA
BERAWA
CANGGU, BALI BA APARTMENT BATHROOM:
DETAIL 1
A3 1/20 FEBRUARY 2019 BA - A - 508
D

WALL & FURNITURE FINISHES CEILING FINISHES

T1 RED BRICKS, EXPOSED C1 NO CEILING, EXPOSED STRUCTURE


T2 TEMPERED GLASS, 10mm, WITH GALVANIZED
FRAME, CAR PAINT, BLACK, MATTE. FITTINGS (SEE SANITARY SELECTION PAGE)

T3 TEAK SOLID, 30mm, PAINTED NATURAL, MATTE S1 FLOOR STANDING CLOSET


T4 CEMENT TILE, 20x20 cm, COL. GREY S2 LAVATORY BOWL
T5 SELECTED MIRROR S3 LAVATORY FAUCET
T6 STAINLESS STEEL PLATE, 3mm S4 HEAD SHOWER
T7 POLISHED CONCRETE, CLEAR COAT S5 HAND SHOWER
S6 SHOWER MIXER
FLOOR FINISHES
C C S7 TOILET PAPER HOLDER
F1 CEMENT TILE, 20x20 cm, COL. GREY S8 JET SPRAY
S9 FLOOR DRAIN

0,12
CFL +5.36/CFL +9.91 CFL +5.36/CFL +9.91 0,30
C1 C1
150 1050 1300

0,50
2350

0,81
810

T5
T1
T5

2,20

0,30 0,20
2210

2,21
T1 T1 T4

2100
T4 T4 T1

0,50
500

PLUMBING
S3 SHAFT S3
T7 S2 T7 S2

1,60
T7
1300

1,30

0,40
S8
400

T1
T3 T3 T1
S1

0,90
900

0,10 0,40

0,40
400

BATHROOM FIRST/SECOND FLOOR BATHROOM FIRST/SECOND FLOOR


F1 FFL +3.15/FFL +7.70 F1 S9 FFL +3.15/FFL +7.70 F1

200 300
250 1000 1300 600 0,30 0,75 0,80 0,40 0,25

SECTION C-C SECTION D-D


NOTE PROJECT TITLE CLIENT REVISION LOCATION DRAWING TITLE PRINT SIZE SCALE DATE DRAWING NUMBER DESIGNED BY

The drawing is the property of El Colectivo Hub. Copyright is reserved by them and the document
is issued on the condition that is not copied, reproduced, retained by or disclosed to any
unauthorized persons, either wholly or in part, without the written consent of El Colectivo Hub
BERAWA APARTMENTS ARVIND MOHINDRA
BERAWA
CANGGU, BALI BA APARTMENT BATHROOM:
DETAIL 2
A3 1/20 FEBRUARY 2019 BA - A - 509
KEYPLAN

SEC. B SEC. C

1550 100 900 100 1700


700

LEGEND
T2 T5 T7 T2
T6 PUBLIC BATHROOM
T5

500

525
T8
T1 SHOWER SET

700
T1
T2 FLOOR DRAIN

1200
T6
T4
T4
T3 TOWEL BAR
1500

T4 CLOSET
T3 BATHROOM
450 700 400 FFL ± 12.25 T5 SHOWER JET

525
SEC. A T6 PAPER HOLDER
T7 WALL MOUNTED TAP
BATHROOM T8 LAVATORY BOWL

1150
FFL ± 12.25
800

800
PLUMBING SHAFT

600
300

400 1400 900 800 1150

PUBLIC BATHROOM LAYOUT PLAN


SCALE 1 : 20

NOTE PROJECT TITLE CLIENT REVISION LOCATION DRAWING TITLE PRINT SIZE SCALE DATE DRAWING NUMBER DESIGNED BY

The drawing is the property of El Colectivo Hub. Copyright is reserved by them and the document
is issued on the condition that is not copied, reproduced, retained by or disclosed to any
unauthorized persons, either wholly or in part, without the written consent of El Colectivo Hub
BERAWA APARTMENTS ARVIND MOHINDRA BERAWA - CANGGU, BALI PUBLIC BATHROOM LAYOUT PLAN A3 1/20 MARCH 2019 A - 510
200
EXPOSED CONCRETE EXPOSED CONCRETE EXPOSED CONCRETE
CFL +14.65

TEAKWOOD
FRAME

1350
MIRROR
5mm
800

CEMENT TILE 20x20, CEMENT TILE 20x20,


COL. GREENISH GREY COL. GREENISH GREY
2400

2400
CONCRETE

100 100
1200

TEAKWOOD

250
1000

50

600
350
CEMENT TILE 20x20, CEMENT TILE 20x20, CEMENT TILE 20x20,
FFL +12.25 COL. GREENISH GREY COL. GREENISH GREY COL. GREENISH GREY

SECTION A
SCALE 1 : 20

NOTE PROJECT TITLE CLIENT REVISION LOCATION DRAWING TITLE PRINT SIZE SCALE DATE DRAWING NUMBER DESIGNED BY

The drawing is the property of El Colectivo Hub. Copyright is reserved by them and the document
is issued on the condition that is not copied, reproduced, retained by or disclosed to any
unauthorized persons, either wholly or in part, without the written consent of El Colectivo Hub
BERAWA APARTMENTS ARVIND MOHINDRA BERAWA - CANGGU, BALI PUBLIC BATHROOM SECTION A A3 1/20 MARCH 2019 A - 511
200
EXPOSED CONCRETE
CFL +14.65 CFL +14.65

600

MIRROR 5mm
TEAKWOOD FRAME

1350
800

CEMENT TILE 20x20,


COL. GREY
2400

2400
CEMENT TILE 20x20,
COL. GREY
CONCRETE

100 100
TEAKWOOD

250
1000

30
600

370
CEMENT TILE 20x20, CEMENT TILE 20x20,
FFL +12.25 COL. GREENISH GREY
FFL +12.25 COL. GREENISH GREY

SECTION B SECTION C
SCALE 1 : 20 SCALE 1 : 20

NOTE PROJECT TITLE CLIENT REVISION LOCATION DRAWING TITLE PRINT SIZE SCALE DATE DRAWING NUMBER DESIGNED BY

The drawing is the property of El Colectivo Hub. Copyright is reserved by them and the document
is issued on the condition that is not copied, reproduced, retained by or disclosed to any
unauthorized persons, either wholly or in part, without the written consent of El Colectivo Hub
BERAWA APARTMENTS ARVIND MOHINDRA BERAWA - CANGGU, BALI PUBLIC BATHROOM SECTION B & C A3 1/20 MARCH 2019 A - 512