Surface Testing Job Summary Well Dakhni Deep #2

Well Head Parameters before Testing.


CHOKE WHSIP ANNULUS 7” X 9 5/8” 9 5/8” X 13 3/8” 13 3/8” X 20” SSSV
- 2600 2600 2600 3500 400 2700

15-04-2022

Well flow through flare fit for 02 Hours (1445-1645 Hrs.)

Flow directed through separator.

Separator inlet flange leaked, Depressurized Separator and rectified Flange leakage of separator.

Again Flow directed through Separator and recorded Parameters are as under.

Time F.CHOK WHFP Qg Qo Qw Remarks


Hrs E Psi mmscfd
1645-0000 32/64 1930 9.787 - - -
0000-0200 28/64 2100 8.159 - - • Observed Liquid HC and Water at
separator Level and diverted to
Crude Storage Tank. Observed huge
HC fumes in tank area.
• Matter discussed with M. Prod N(A)
• Test Terminated as Flare pit is close
to crude storage Tank.
• Well shut-In from master and Wing
valves

Note.

1. During entire testing


WH Pressure ₌ Ann Press b/w Tbg and 7” Csg ₌ Ann Press b/w 7” X 9 5/8” Csg.
2. Both Wings Valve are passing Considerably.
3. Single Master Valve Also Pass very small quantity.
4. As already reported SSSV of this well is malfunctioned and in partial open position rather than
Fail safe (Close position).
5. As already reported Oozing observed b/w Conductor pipe and 20” Csg.

Submitted for Information/Record and necessary action Please.