Professional Documents
Culture Documents
Surface Testing Job Summary Well Dakhni Deep #2
Surface Testing Job Summary Well Dakhni Deep #2
15-04-2022
Separator inlet flange leaked, Depressurized Separator and rectified Flange leakage of separator.
Again Flow directed through Separator and recorded Parameters are as under.
Note.