Completion Diagram of Well Tattoo 11

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 OIL & GAS DEVELOPMENT COMPANY LTD.

2
3 SINJHORO GAS CONDENSATE FIELD
4 Well Completion Profile/ Completion Diagram
5
6 Well Hakeem Dahio-03 (Slant Hole)
7
8 01 9 5/8"csg,(53.5PPF),P-110 Completion Fluid
Casing
9 02 7" Casing ,(32 PPF),P-110
1% Inhabited brine (Cacl2) 1.20 S.G
Tubing 03 3-1/2" JFE BEAR-HP2-13CR-110 (10.2PPF)
10 X-MASS TREE Elevations Location
Make JMP KB: 32.848 m Block: SINJHORO
11
13 3/8" CSG shoe Size 3-1/8" (R-35) DF: 32.848 m Latitude: 26*-08'-21.9249" N
12 @ 614 M Rating 5K psi GL: 24.848 m Longitude: 68*-43'-31.2069" E
DRILLING RIG N-4 Completion Type
1st KOP @ Completion Date 30.03.2022 7" Permanent completion single string
660m
OD ID Down Hole Completion
Sr. No. Depth (M) Length (M)
(inch) (inch) Description
7" Liner Top
. @ 2302 M
0 - 6.900 - - Rotary Table Difference

1 7.302 0.402 11 2.992 TUBING HANGER CS Hydril (BOX X BOX)


9 5/8" CSG shoe
@ 2404 M
2 7.768 0.466 4 2.875 Pin x Pin X-Over 3 /12" CS Hydril

3 8.293 0.525 4 2.875 X-Over 3 1/2" 10.3# TSHP Box x 3 1/2" 10.2# JFE Bear Pin
13
4 65.935 57.642 3.5 2.813 Tubing Joints (06 No,s) 3-1/2" JFE Bear 10.2 PPF, (Box X Pin)

5 68.915 2.98 3.5 2.813 Pup Joint ,Tubing 3-1/2", JFE Bear 10.2 PPF, (Box X Pin)

6 70.983 2.068 3.5 2.813 Pup Joint ,Tubing 3-1/2", JFE Bear 10.2 PPF, (Box X Pin)

7 73.055 2.072 3.5 2.8125 Pup Joint ,Tubing 3-1/2", JFE Bear 10.2 PPF, (Box X Pin)
2nd KOP @
2990 m
8 73.595 0.54 4 2.875 X-Over 3-1/2" JFE 10.2 PPF (Box) x 3-1/2" 10.3 PPF TSHP/CS HYD (Pin)

9 75.360 1.765 4 2.812 Flow Coupling 3 1/2" 10.3# OECO-A Pin X Box (102929699)
Tubing Retrievable Sub Surface Safety Valve 3 1/2" 10.3# OECO-A Pin X Box
10 76.581 1.221 5.5 2.75
(Hulliburton) (103023103)
11 78.346 1.765 4 2.812 Flow Coupling 3 1/2" 10.3# OECO-A Pin X Box (102929699)

12 78.868 0.522 4 2.875 X-Over 3 1/2" 10.3# TSHP Box x 3 1/2" 10.2# JFE Bear Pin

13 3148.289 3069.421 3.5 2.813 Tubing Joints (320 No,s) 3-1/2" JFE Bear, 10.2 PPF, (Box X Pin)

14 14 3148.829 0.54 4 2.875 X-Over 3 1/2" 10.2# JFE Bear Box x 3 1/2" 10.3# TSHP Pin
LSA No Go Locator 3 1/2" 10.3# OECO-A Box x Hsalf mule shoe, 3-1/2" 9.2#
15 15 3150.000 1.171 4.25 2.875
(106918300) (No-Locator length = 0.495m & LSA stick up length = 0.676m)
7" PKR @ 3150 M
0.792 7" TWT Wireline-Set, Mill to Release, Perma Series Production Packer
16 16 3150.455 5.875 4.00
(Hulliburton), 26-32# Weight Range, 5-18# Vam Top SC80 Box (103022851)
0.455
17
17 3153.295 2.84 5.5 4 Sealbore Extension 5-18# Vam Top Pin x Pin (10297110)

18 3154.995 1.7 5.563 4.313 Mill Out Extension 5-18# Vam Top Box x Pin (102926312)
18 Reducing Adapter 5-18# Vam Top Box x 3 1/2" 10.3# OECO-A Pin X Box
19 3155.405 0.41 5.563 2.875
(102925265)
20 3156.880 1.475 3.875 2.875 Pup Joint 3 1/2" 10.3# OECO-A Pin X Box (102927074)
19
21 3157.129 0.249 3.875 2.75 R-Landing Nipple 3 1/2" 10.3# OECO-A Pin X Box (103026524)
20
22 3160.189 3.06 3.875 2.875 Perforated Pup Joint 3 1/2" 10.3# OECO-A Pin X Box (102926217)

21 23 3160.484 0.295 3.875 2.635 XN-Landing Nipple 3 1/2" 10.3# OECO-A Pin X Box (102927064)

24 3162.024 1.54 3.875 2.875 Half Mule Show + Pup Joint 3 1/2" 10.3# OECO-A Box (106918290)

22 25 3162.024 End of Tubing

Note: 6. LSA total length = 3.968 m For more detail see


1. 1st KOP @ 660m For more detail see 7. No-Go locator length = 0.495 m Hulliburton
2. 2nd KOP @ 2990m Hole construction 8. Effective length of LSA = 3.473 m completion Diagram
23 3. Max. deviation = 23 Deg. @ 1874m diagram & deviation
4. 9. LSA Stick-up Length = 0.676 m
24
String weight (Pick-Up) = 48 Ton
5. Min ID = 2.635" @ 3160.484m
01 NO. 3-1/8", API 5K (R-35) JMP
3190-3188 = 02 M 01 NO. 3-1/8", API 5K (R-35) JMP SWAB VALVE

3192-3191 = 01 M 04 NOS. 3-1/8", API 5K (R-35) JMP WING VALVE

3199-3194 = 05 M X-MASS TREE : 01 NO. 3-1/8", API 5K (R-35) JMP FIXED CHOKE ASSEMBLY

ZONE II
01 NO. 3-1/8", API 5K (R-35) JMP ADJUSTABLE CHOKE ASSEMBLY
3203-3201 = 02 M 01 NO. 3-1/8", API 5K (R-35) JMP SURFACE SAFETY VALVE (WP = 1305 psi)

3211-3205 = 06 M 01 NO. 3-1/8", API 5K (R-35) JMP MASTER VALVE


01 NO. 11" (R-54) x 3-1/8" (R-35) API 5K, JMP BONNET FLANGE WITH
BONNET FLANGE:
7" CSG Shoe @
CONTINOUS CONTROL LINE PROVISION
3500 M
01 NO. 11" x 11" (R-54) API 5K, JMP TUBING HEAD SPOOL
PBTD= 3413.7 M TUBING HEAD SPOOL :
TD= 3500 m MD (2325.58m
TVD)
02 Nos. Wing Valves of 2-1/16" (R-24), 5K Psi

TOP CONNECTION: 3-1/2" , 10.3# CS HYD (B) & 5-3/4" Stub ACME (P)

FORMATION ZONE INTERVAL

3190-3188 = 02 M
3192-3191 = 01 M
LOWER GORU ( Massive Sands ) ZONE II 3199-3194 = 05 M
3203-3201 = 02 M
3211-3205 = 06 M
PRODUCTION ENGINEERS FIELD MANAGER

Aamir Chohan/ Mujahid Bin Khalid/ Khan Muhammad/ Abdul Jabbar Syed Tanveer Hussain / Noorullah Dahari

You might also like