Professional Documents
Culture Documents
Test Pump GRAPHS MOSES
Test Pump GRAPHS MOSES
0.00 10.0
10.00
8.0
9.00
Water Level (bgl)
Yield (m3/hr)
4.00 6.0 8.00
4.0 7.00
6.00
Q/s (m3/hr/m)
8.00 2.0
0.0 5.00
0 50 100 150 200 250 12 hrs test : 8m3/hr
0.00
0.00 4.0
2.00
4.00
Water Level (mbgl)
Yield (m3/hr)
4.00
2.0
6.00
6.00
8.00 8.00
The borehole can be pumped at a rate of 10 m3/hr for 6 hoursfollowed by 1 hour recovery dialy.