PROFORMA FOR PROGRESS REPORT OF PMGSY ON GOING WORKS PHASE VIII TO X & PMGSY II FOR THE MONTH OF OCTOBER

- 2021

PMGSY
EXPENDITURE
NAME LENGTH IN KMS DATE
NAME OF
OF NAME OF OAS Adminstrat (FOR ROADS)/ T.P IN AGREEME EOAT DURING THE YEAR 2020-21
SI.NO THE PAKAGE PHAS NO. OF VENTS- NAME OF THE DATE OF CUMULATI STAGE OF
THE THE NAME OF THE WORK IN ive EXCESS/ NT VALUE SET FOR GRANTED Details of Work
. CONSTIT NO. E SPAN(FOR CONTRACTOR AGREEMENT UPTO 31- UPTO DURING DURING VE WORK
DISTR MANDAL LAKHS Sanction BRIDGE LESS IN LAKHS COMPLETI IF ANY
UENCY 03-2020 LAST THE THEYEAR EXPENDIT
ICT WORKS) ON
MONTH MONTH (20+21 URE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 21 22

GORT
AP111204 - T02-Maddur to NO.33 M/s Sree Laxmi Work
1 NRPT Maddur Maddur AP111204 II 581.46 9.250 5.10% Less 472.97 21.06.14 20.12.15 317.69 93.39 0.00 93.39 411.08 Completed & finalled
Mominapur via Chenreddypally DT15.02.20 Constructions completed
14

GORT
AP111210 - T03-Providing BT on
NO.33 M/s Bhavani 10.35% 24.04.16/ Work
2 NRPT Narva Narwa AP111210 II road from KalWal to Narwa via 831.99
DT15.02.20
12.600
Constructions Less
525.92 25.10.14
31.07.18
31.07.18 518.97 116.44 0.00 116.44 635.41
completed
Completed & finalled
Seepur and Raikode
14

GOMS
Construction of Bridge on R/F Sri.E.Kasi
No.14 4.99% Work
3 NRPT Makthal Maganoor TS4XILB28 XI Gudebalur to Mandipally (via) 108.00 0.000 Reddy 104.43 07.03.2018 06.03.19 04.06.19 0.00 108.00 0.00 108.00 108.00 Completed & finalled
Dt.27.02.2 Excess completed
Mudmal AT 9/0 to 9/2 Contractor HYD
017

II Total 1521.45 0.00 21.85 0.00 0.00 1103.32 0.00 0.00 0.00 836.66 317.83 0.00 317.83 1154.49

Executive Engineer,
PR.Div.Narayanpet
PROFORMA FOR PROGRESS REPORT OF PMGSY ON GOING WORKS PHASE VIII TO X & PMGSY II FOR THE MONTH OF DECEMBER - 2021

PMGSY
EXPENDITURE
NAME LENGTH IN KMS
NAME OF DATE
OF NAME OF OAS Adminstrat (FOR ROADS)/ T.P IN AGREEMENT EOAT DURING THE YEAR 2020-21 CUMULATI
SI.NO THE PAKAGE PHAS NO. OF VENTS- NAME OF THE DATE OF SET
THE THE NAME OF THE WORK IN ive SPAN(FOR
EXCESS/ VALUE IN GRANTED VE STAGE OF WORK
. CONSTIT NO. E CONTRACTOR AGREEMENT FOR UPTO 31- UPTO DURING DURING EXPENDIT
DISTRI MANDAL LAKHS Sanction BRIDGE LESS LAKHS IF ANY Pending
UENCY COMPLETION 03-2019 LAST THE THEYEAR
CT WORKS) URE
MONTH MONTH (18+19) (17+20)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Roads

Formation compeleted, 11
Culverts completed,
cement stabilazation 0/0
to 3/0 and 3/350 to 4/4
KM and GSB 0/0 to 3/0
Sree Laxmi Km and 3/350 to 4/0 Km,
Narayan Narayan III MRL12-Narayanpet to Putpak via Constructions,
5 NRPT 558.90 5.500 4.99 Excess 519.16 23.07.2021 22.01.2023 199.02 Nano technology sub
pet pet Plain Eklaspur Gachibowli,
base from 4/0 to 5/5 Km
Hyderabad.
completed and WMM
completed from 0/0 to
3/0and 3/350 to 5/5 Km
and BT completed from
0/0 to 3/0 Km.

8 formation 4km completed,


M/S Aadi Shakti 3 cd works completed,
Kodang III T01-Bakthimalla PWD Road to Musrifa
NRPT Koagi 636.70 8.687 Construction R/o 2.79 Excess 556.63 22.07.2021 21.01.2023 200mm cc road
al Plain via Hanumanpally, Bijjaram MBNR
completed

Bridges
9
Constn of minor bridge at Ch4/800 Km G.O.Rt.No.
Kodang III 172 Sri.A.Bhopal
NRPT Koagi on R/F Bakthimalla PWD Road to 139.00 32.300 5.00 Less 112.33 09.09.2021 08.03.2023
al Plain dt.08.04.2 Reddy R/o MBNR
Musrifa via Hanumanpally Bijjaram 021
Not Started
Total 3495.13 0.00 110.62 0.00 0.00 3139.23 0.00 0.00 0.00 0.00 389.34 0.00 389.34 389.34