This document provides a summary of emergency maintenance done by Dhaka Power Distribution Company Ltd. on July 18, 2022. It lists 17 maintenance tasks carried out between 1:00 AM and 11:00 PM that affected various feeders and areas. The maintenance was needed due to issues like generation shortages, load shedding requests, and unavoidable situations. The tasks and their locations, times, affected loads, and reasons are detailed. The total emergency maintenance load addressed was 35.23 MW.
This document provides a summary of emergency maintenance done by Dhaka Power Distribution Company Ltd. on July 18, 2022. It lists 17 maintenance tasks carried out between 1:00 AM and 11:00 PM that affected various feeders and areas. The maintenance was needed due to issues like generation shortages, load shedding requests, and unavoidable situations. The tasks and their locations, times, affected loads, and reasons are detailed. The total emergency maintenance load addressed was 35.23 MW.
This document provides a summary of emergency maintenance done by Dhaka Power Distribution Company Ltd. on July 18, 2022. It lists 17 maintenance tasks carried out between 1:00 AM and 11:00 PM that affected various feeders and areas. The maintenance was needed due to issues like generation shortages, load shedding requests, and unavoidable situations. The tasks and their locations, times, affected loads, and reasons are detailed. The total emergency maintenance load addressed was 35.23 MW.