Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

OPERATIVE DRAFT

COMPAS BARRANQUILLA

BATHYMETRY: JULY 28th 2018


MENSAJE DE SEGURIDAD: 151 – AUGUST O3rd 2018
SUMMARY

Operative Draft
River Channel - Operative Draft allowed by Harbor Master - Mensaje de Seguridad 151 - 28th-July-2018
+ 180 <= LOA <=200: Draft 9,0 - 9,4 - Daylight- Arrive and departure
+ LOA < = 179,9 mts: Draft 9,0 - 9,6 - Daylight - Arrive and departure
This information can changes because depend of natural causes and it will be updated when we received a new
Mensaje de Seguridad
Compas Terminal - Bathymetry July 28th-2018 – At the moment all maneuvers to load by shore belt conveyor
(Berth 1) are with two lines
LOADING WITH SHORE BELT CONVEYOR
Berth 1: AFT 11,1 mts - FWD 10,0 mts (Two lines 12,5 mts)
Berth 1: AFT 10,8 mts - FWD 9,6 mts (Two lines 9,15 mts)
LOADING AND DISCHARGE WITH SHIP´S CRANE AND TANKER OPERATIONS
Berth 3: AFT 9,4 mts - FWD 9,0 mts
This information can changes because depend of natural causes and it will be updated when we received a new
Bathymetry or other measurement of the depths

2
BERTH 1

- Load with Shore Belt Conveyor


- Barge (12,5 mts)
mts)
BERTH 1

- Load with Shore Belt Conveyor


- Barge (9,15 mts)
mts)
BERTH 3

- Load/
Load/Discharge with Ship´
Ship´s Cranes
- Tanker Load/Discharging
Load/Discharging Operations
END

You might also like