AL SADD 3 Substation - Car Park: Electrical SL - No. LSP Drawings Reason For Variation/Changes 01 Lighting Drawings

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

AL SADD 3 Substation - Car Park

Electrical
Sl.No. LSP drawings Reason for Variation/Changes
01 Lighting Drawings
PH13-5C-95-74-0023
PH13-5C-95-74-0024
 Light fitting / circuit arrangement revised in the
PH13-5C-95-74-0026
layout as per the site markup provided by
PH13-5C-95-74-0028
contractor
PH13-5C-95-74-0030
PH13-5C-95-74-0032
PH13-5C-95-74-0034
02 Small Power Drawing
PH13-5C-95-74-0025
 Split AC introduced in Electrical Room as per EPE
PH13-5C-95-74-0027
requirement
PH13-5C-95-74-0029
PH13-5C-95-74-0031
 Revised the layout as per site markup provided by
PH13-5C-95-74-0033
contractor
PH13-5C-95-74-0035
03 DB Schedules & Single Line Diagram
PH13-5C-95-74-0039  Revised the DB Schedule & SLD as per site
PH13-5C-95-74-0040 markup provided by contractor

Mechanical
01 Plumbing and Drainage Drawings
PH13-5C-95-73-8014_RB1
PH13-5C-95-73-8015_RB1
PH13-5C-95-73-8018_RB
PH13-5C-95-73-8030_RB  Piping arrangement revised and providing
PH13-5C-95-73-8031_RB additional drain points and connections in the
PH13-5C-95-73-8032_RB layout as per the site markup provided by
PH13-5C-95-73-8050_RB2 contractor
PH13-5C-95-73-8051_RB1  Drain pipe connection provisions for Split AC
PH13-5C-95-73-8052_RB introduced in Electrical Room as per EPE
PH13-5C-95-73-8053_RB requirement
PH13-5C-95-73-8054_RB
PH13-5C-95-73-8055_RA
PH13-5C-95-73-8056_RB1
PH13-5C-95-73-8057_RB1
PH13-5C-95-73-8058_RB
02 HVAC Drawings
PH13-5C-95-75-8401_R3 & 8408_R3
PH13-5C-95-75-8402_RA&8409_R2
PH13-5C-95-75-8403_RA&8410_RA  Duct sizing and Equipment locations revised in the
PH13-5C-95-75-8404_RA&8411_R4 layout as per the site markup provided by
PH13-5C-95-75-8405_RA contractor
PH13-5C-95-75-8405_RA  Split AC introduced in Electrical Room as per EPE
PH13-5C-95-75-8406_RA requirement
PH13-5C-95-75-0022_R3  Providing additional VCD’s and ventilations to lift
P PH13-5C-95-75-0023_RB shaft areas in the layout as per the site markup
PH13-5C-95-75-0024_R3 provided by contractor
PH13-5C-95-75-0025_RA
PH13-5C-95-75-0026_RA
PH13-5C-95-75-0027_RA