Professional Documents
Culture Documents
Pleted Bridge DPR
Pleted Bridge DPR
1. Consultancy Services for Preparation of DPR for development DPR Sole Firm [Mansor -Jhabua Section] have
of Economic Corridors, Inter Corridors, Feeder Routes and Length - 244.500 Km (8-lane
National Corridors (GQ and NS-EW Corridors) to improve the Access Controlled Expressway)
efficiency of freight movement in India under Bharatmala
➢ Structural Total length -
Pariyojana (LOT-4/Package-5)
1785.6 M- 8 lane
Expressway
(Length- 328 m)
➢ Minor Bridges- 21 Nos.
(Length- 483 m)
➢ ROB- 3 Nos. (Length-
298.24 m) (including
Bow String Steel
Structure)
➢ Interchange Structures- 8
Nos. (Length- 978m)
➢ Vehicular Underpasses-
147 Nos. (Length-
1549.50m)
2. Consultancy Services for Preparation of DPR for development Feasibility Sole Firm Sohna-Gurugram road to Haryana
of Economic Corridors, Inter Corridors, Feeder Routes and /Rajasthan Border Stretch (Ch 0+000
National Corridors (GQ and NS-EW Corridors) to improve the to 78+800) of Delhi-Vadodara
efficiency of freight movement in India under Bharatmala Expressway in the state of Haryana]
Pariyojana (LOT-6/Package-4) have Length -78.800 Km (8-lane
Access Controlled Expressway)
Structural Total length - (8-Lane)
i. Sohna-Gurugram road to Haryana /Rajasthan
(Total Length- 6,656m)
Border Stretch (Ch 0+000 to 78+800) of Delhi-
Vadodara Expressway in the state of Haryana] have
Length -78.800 Km (8-lane Access Controlled ➢ Major Bridges- 3 Nos.
Expressway) (Length- 228m)
ii. Panagarh- Dankuni Stretch (Ch 521+120 to 652+700)
➢ Minor Bridges- 20 Nos.
of National Economic Corridor of NH-19 in the state of
(Length- 411m)
➢ Vehicular Underpasses-
60 Nos. (Length- 680m)
➢ Foot Over Bridge – 1 No
(109.6 m)
3. Consultancy Services for Project Management Phase-I Including DPR Sole Firm Package I: -Four Laning of
preparation of Detailed Project Report for rehabilitation and Madanapalle to Pileru Section of NH-
upgrading of Madanapalle to Tirupati and from Renigunta to 71. Package II: -Four Laning of Pileru
Naidupeta on NH-71 and from Puthalapattu to Tirupati i.e. Km to Tirupati Section of NH-71. Package
0/0 to Km 42/0 of NH-140 in the State of Andhra Pradesh to III: -Six Laning of Chittoor to
two/four lane with paved shoulder configuration. Mallavaram Section of NH-140.
Package IV: -Six Laning of Renigunta
to Naidupeta Section of NH-71.
4. Consultancy services for carrying out Feasibility Study , DPR Sole Firm Length of Structure (m)
Detailed Survey / Investigation , alignment option, Preparation
(ROB Proper + Viaduct)- 339.0 m
of general arrangement drawing and engineering report for
construction of proposed ROBs and their approaches in the (ROB Proper- 1 x 78.0)
replacement of Existing level crossings at Bishnupur on NH-60
(LC No-39/A/3E) at (Km 198.800) in the state of West Bengal (Viaduct- 9x25+2x18)
( Package 20) Total Length- 950 M, 3 Lane
Structure Type - Steel truss + RCC T-
Beam
Foundation – Pile
5. Consultancy services for carrying out Feasibility Study, Detailed DPR Sole Firm Length of Structure (m)(ROB Proper
Survey / Investigation , alignment option, Preparation of + Viaduct)- 373.88m
general arrangement drawing and engineering report for
(ROB Proper- 1x63.480)
construction of proposed ROBs and their approaches in the
replacement of Existing level crossings at Bishnupur on NH-60 (Viaduct- 9x25+7x12.2)
(LC No. KA 61) at Km. 194.850 in the state of West Bengal (
Package 20) Total Length- 1205 M, 3 Lane
Structure Type - BOW String + RCC
T-Beam + RCC Solid Slab
Foundation – Pile
6. Consultancy services for carrying out Feasibility Study, Detailed DPR Sole Firm Length of Structure (m)(ROB Proper
Survey / Investigation , alignment option, Preparation of + Viaduct)- 222.0m
general arrangement drawing and engineering report for
(ROB Proper- 1x37.0)
construction of proposed ROBs and their approaches in the
7. Consultancy services for carrying out Feasibility Study, Detailed DPR Sole Firm Length of Structure (m) (ROB Proper
Survey / Investigation , alignment option, Preparation of + Viaduct)- 666.480m
general arrangement drawing and engineering report for
(ROB Proper- 1x63.480)
construction of proposed ROBs and their approaches in the
replacement of Existing level crossings at Topsi on NH-60 at (Viaduct- 9x37+3x30+10x18)
Km 284.170 (LC No-6-B/T) in the state of West Bengal (
Package 20) Total Length- 1508.48 M, 6 Lane
Structure Type - BOW String + PSC
Girder
Foundation – Pile
8. Consultancy services for carrying out Feasibility Study, Detailed DPR Sole Firm Length of Structure (m) (ROB Proper
Survey / Investigation , alignment option, Preparation of + Viaduct)- 666.0m
general arrangement drawing and engineering report for
(ROB Proper- 1x37.0)
construction of proposed ROBs and their approaches in the
replacement of Existing level crossings at Pandaveswar on (Viaduct- 17x37.0)
NH-60 at N-60 Km 303.900 in the state of West Bengal (
Package 20) Total Length- 1758 M, 6 Lane
Structure Type - Steel Composite
Girder + PSC Girder
Foundation – Pile
9. Consultancy services for carrying out Feasibility Study, Detailed DPR Sole Firm Length of Structure (m) (ROB Proper
Survey / Investigation, alignment option, Preparation of + Viaduct)- 662.960m
general arrangement drawing and engineering report for
(ROB Proper- 2x63.480)
construction of proposed ROBs and their approaches in the
replacement of Existing level crossings at Bhimghar on NH-60 (Viaduct- 20x25+2x18)
at (Km 307.050) ( LC No-10-B/T) in the state of West Bengal (
Package 20) Total Length- 1675 M,6 Lane
Structure Type - BOW String + RCC
T-Beam
Foundation – Pile
10. Consultancy services for carrying out Feasibility Study, Detailed DPR Sole Firm Length of Structure (m) (ROB Proper
Survey / Investigation, alignment option, Preparation of + Viaduct)- 361.480m
general arrangement drawing and engineering report for
(ROB Proper- 1x51.480)
construction of proposed ROBs and their approaches in the
replacement of Existing level crossings at Suri on NH-60 at km (Viaduct- 9x18+4x37)
338.600 (LC No-21/SPL/E) in the state of West Bengal (
Package 20) Total Length- 1343 M, 6 Lane
Structure Type - BOW String + PSC
Girder + RCC T-Beam
Foundation – Pile
11. Consultancy services for carrying out Feasibility Study, Detailed DPR Sole Firm Length of Structure (m) (ROB Proper
Survey / Investigation, alignment option, Preparation of + Viaduct)- 591.0m
general arrangement drawing and engineering report for
(ROB Proper- 1x110)
construction of proposed ROBs and their approaches in the
replacement of Existing level crossings at ASHOKNAGAR at
Km -20.578 (LC NO26/T –A) on NH-35 in the state of West (Viaduct- 13x37)
Bengal ( Package 20)
Total Length- 1324 M,3 Lane
Structure Type - Steel truss + PSC
Girder
Foundation – Pile
12. Consultancy services for carrying out Feasibility Study, Detailed DPR Sole Firm Length of Structure (m)(ROB Proper
Survey / Investigation, alignment option, Preparation of + Viaduct)- 772.960m
general arrangement drawing and engineering report for
(ROB Proper- 2x63.48+1x78)
construction of proposed ROBs and their approaches in the
replacement of Existing level crossings at HABRA 27/T-A at (Viaduct- 14x37+2x25)
Km-22.882 on NH-35 in the state of West Bengal ( Package 20)
Total Length- 1200 M,3 Lane
Structure Type - Steel Truss + BOW
String + PSC Girder + RCC T-Beam
Foundation – Pile
13. Consultancy services for carrying out Feasibility Study, Detailed DPR Sole Firm Length of Structure (m) (ROB Proper
Survey / Investigation, alignment option, Preparation of + Viaduct)- 591.0m
general arrangement drawing and engineering report for
(ROB Proper- 1x110)
construction of proposed ROBs and their approaches in the
replacement of Existing level crossings at HABRA 28/T-A on (Viaduct- 13x37)
NH-35at Km -23.969 in the state of West Bengal ( Package 20)
Total Length- 1053 M, 3 Lane
Structure Type - Steel truss + PSC
Girder
Foundation – Pile
14. Consultancy services for carrying out Feasibility Study, Detailed DPR Sole Firm Length of Structure (m) (ROB Proper
Survey / Investigation, alignment option, Preparation of + Viaduct)- 591.0m
general arrangement drawing and engineering report for
(ROB Proper- 1x110)
construction of proposed ROBs and their approaches in the
replacement of Existing level crossings at BONGAON 23SPL/T (Viaduct- 13x37)
on NH-35 at Km- 52.712 in the state of West Bengal ( Package
20) Total Length- 1052 M,3- Lane
Structure Type - Steel truss + PSC
Girder
Foundation – Pile
15. Consultancy Services for Preparation of Combined GAD DPR Sole Firm Structural Length- 573.68 M
Detailed Project Report for the Construction of ROB near RUB
Total Bridge Length- 999.68 M, 2
No. 20 at km 232/16 ‐18 between Kumardubbi –Mugma
Lanes
station on Grand chord section under Dhanbad Division
16. Consultancy Services for Preparation of Combined GAD DPR Sole Firm Structural Length- 359.75 M
Detailed Project Report for the Construction of ROB near Km
Total Bridge Length- 979.75 M, 2
312/16‐18 ( RBK‐14) between CBSA‐SIPA stations on NH‐
Lanes
75 (Ext) under NH Division Chaibasa
17. Consultancy Services for Preparation of Combined GAD DPR Sole Firm Structural Length- 589.632 M
Detailed Project Report for the Construction of ROB near Km
Total Bridge Length- 1338.6 M, 2
325/4‐6 between SIPA – JNK stations on NH‐75 (Ext) under
Lanes
NH Division Chaibasa
18. Consultancy Services for Preparation of Combined GAD DPR Sole Firm Structural Length- 414.632 M
Detailed Project Report for the Construction of ROB near Km
Total Bridge Length- 1068.632 M, 2
330/12‐14 betweenJNK‐ TABU stations .
Lanes
19. Consultancy Services for Preparation of Combined GAD DPR Sole Firm Structural Length- 404.632 M
Detailed Project Report for the Construction of ROB near Km
Total Bridge Length- 1543.632 M, 2
335/12‐14 between JNK – TABU stations on NH‐75 (Ext)
Lanes
under NH Division Chaibasa
20. Consultancy Services for Preparation of Combined GAD DPR Sole Firm Structural Length- 539.711 M
Detailed Project Report for the Construction of ROB near Km
Total Bridge Length- 1114.71 M, 2
339/36‐38 between TABU‐KNPS stations on NH‐75 (Ext)
Lanes
under NH Division Chaibasa
21. Consultancy Services for Preparation of Combined GAD DPR Sole Firm Structural Length- 257.25 M
Detailed Project Report for the Construction of ROB near MH‐4
Total Bridge Length- 739.25 M, 2
in Km 358/31‐33 between SILLI –MURI stations on under
Lanes
Road Division Ranchi
22. Consultancy Services for Preparation of Combined GAD DPR Sole Firm Structural Length- 203.25 M
Detailed Project Report for the Construction of ROB near Km
Total Bridge Length- 689.25 M, 2
376/7‐11 between NOMD‐BJMD stations on NH‐75 ( Extn)
Lanes
under NH Division Chaibasa.
23. Consultancy Services for Preparation of Combined GAD DPR Sole Firm Structural Length- 319.636 M
Detailed Project Report for the Construction of ROB near level
Total Bridge Length- 866.636 M, 2
crossing No. MH‐21 at Km 408/5‐7 between Namkum –
Lanes
Tatisilway stations under Road Division Ranchi
24. Consultancy Services for Preparation of Combined GAD DPR Sole Firm Structural Length- 392.25 M
Detailed Project Report for the Construction of ROB near level
Total Bridge Length- 869.25 M, 2
25. Preparation of detailed Design and Detailed project report for DPR Sole Firm Structural Length- 1020 M
construction of approximate length 1020 m(Structure) + 430
Total Bridge Length- 1450 M, 2
m (Approach)= 1450 m with 17 x 60 m span, for High level
Lanes
PSC Box Girder Bridge on pile foundation) over Humphrey
Strait connecting Gandhi Ghat jetty to Uttara jetty in the Union
Territory of Andaman & Nicobar Islands
26. Preparation of detailed Design and Detailed project report for DPR Sole Firm Structural Length- 960 M
construction of approximate length 960 m(Structure) + 1003
Total Bridge Length- 1963 M, 2
m (Approach)= 1963 m with 16 x 60 m span, High level PSC
Lanes
Box Girder Bridge on well foundation) over Middle Strait
connecting Middle strait jetty to Nilambur jetty. in the Union
Territory of Andaman & Nicobar Islands
27. Consultancy Services for Preparation of Combined GAD and DPR Sole Firm Structural Length- 56.859 M
Detailed Project Report (DPR) for the construction of
Total Bridge Length- 464.02 M, 4
Approach of proposed ROB near Level Crossing no- 4 Lane
Lanes
ROB on Ranchi Lahardaga Section in between Km 427/2-3
at level Crossing no RL 5
28. Consultancy Services for Preparation of Combined GAD and DPR Sole Firm Structural Length- 25.080 M
Detailed Project Report (DPR) for the construction of
Total Bridge Length- 444.509 M, 4
Approach of proposed ROB near Level Crossing no- at Km.
Lanes
406/11-12 Near Bijulia (RamGarh) Muri in the State of
Jharkhand.
29. Consultancy for Survey, Sub-Soil Investigation (SSI) and DPR Sole Firm Total Bridge Length- 320 M, 2
Finalization of Bridge Scheme for Major Permanent Bridge Lanes (Balanced Cantilever)
(Appx Span 200 Mtr) over Lohit River at Km 14.500 (Tinai) on
30. “Consultancy for Survey, Sub-Soil Investigation (SSI) and DPR Sole Firm Total Bridge Length- 280 M, 2
Finalization of Bridge Scheme for Major Permanent Bridge Lanes (Balanced Cantilever)
(Appx Span 200 Mtr) over Lohit River at Km 1.150 (Meshai) on
Eastern Bank Road to Dichu Road Under 1444 BCC (GREF)
Under 48 BRTF of Project Udayak in Arunachal Pradesh “.
Location Within Country: Madhya Pradesh, Rajasthan Professional Staff provided by firm:
10
Name of Client: National Highway Authority of India No of Staff Man Months: 59
Start Date: 02/2018 Completion Date: 03/2020 Approx. value of services:
Rs.3252.00 Lakhs
Name of Associate Firm (if Any): Nil No of Man Months of Professional
Staff Provided by Associate Firm :
Nil
Name of Senior Staff involved and functions performed:
Mr. S. K. Sinha - Team Leader- Senior Highway Engineer
Mr. Piyush Mittal - Highway cum Pavement Engineer
Mr. Somenath Ghosh – Senior Bridge Engineer
Mr. Neeraj Kumar Sinha – Traffic / Road Signage / Marking and Safety Expert
Mr. Asim Kumar Mahapatra - Material-cum-Geo-technical Engineer –Geologist
Mr.P R Mandal - Senior Survey Engineer
Mr. Sharad Verma - Environmental Specialist
Mr. Rakesh Kumar - Senior Quantity Surveyor
Mr. Raj Shekhar Paul - Land Acquisition Expert
Mr. Indushekhar Choudhary -Utility Expert
Narrative Description of Project: Delhi-Mumbai Expressway in the state of Madhya Pradesh from ch. 0/0
to 244/000 [Mansor -Jhabua Section] & Sangariya-Rasisar Section] have Length -252.500 KM (6 lane Access
Controlled Highway)
➢ Sangariya-Rasisar Section] have Length -252.500 KM (6 lane Access Controlled Highway) Structures
(6-Lane) (Total Length- 3627.74m)
➢ Major Bridges- 3 Nos. (Length- 328 m)
➢ Minor Bridges- 21 Nos. (Length- 483 m)
➢ ROB- 3 Nos. (Length- 298.24 m) (including Bow String Steel Structure)
➢ Interchange Structures- 8 Nos. (Length- 978m)
➢ Vehicular Underpasses- 147 Nos. (Length- 1549.50m)
Detailed Description of Specific Surveys carried out.
➢ Alignment fixation for complete Green Field alignment
➢ Topographical Survey using DGPS, LIDAR, Total Station & Drone, Photogrammetry Survey
Technique, Auto-level.
➢ Traffic Survey using Automatic Traffic Counter & Classifier System (ATCC) & Analysis to
appreciate the anticipated traffic on proposed Expressway
➢ Geotechnical Investigation & Sub-Soil exploration
➢ Land Acquisition as per NH Act involving 3(a), 3(A) & 3(D) for 5207 Ha land covering 70 M ROW
using Cadastral maps
➢ Extensive ground recce.
➢ Design of Horizontal/Vertical alignment & preparation of Plan & Profile drawings
Location Within Country: Haryana, West Bengal Professional Staff provided by firm:
10
Name of Client: National Highway Authority of India No of Staff Man Months: 59
Start Date: 02/2018 Completion Date: 02/2021 Approx. value of services:
Rs.2406.00 Lakhs
Name of Associate Firm (if Any): Nil No of Man Months of Professional
Staff Provided by Associate Firm :
Nil
Name of Senior Staff involved and functions performed:
Mr. Kashi Nath Das - Team Leader- Senior Highway Engineer
Mr. Bibek Raha - Highway cum Pavement Engineer
Mr. Arun Choudhury – Senior Bridge Engineer
Dr. Malikarjuna Rao – Traffic / Road Signage / Marking and Safety Expert
Mr. Nitaish Shah - Material-cum-Geo-technical Engineer –Geologist
Mr.Amit Sharma - Senior Survey Engineer
Mr. Sanjeev Sharma - Environmental Specialist
Mr. Ashokanand Jha - Senior Quantity Surveyor
Mr. M. K. Ghosh - Land Acquisition Expert
Mr.Areati Renu Kumar -Utility Expert
Narrative Description of Project: [Sohna-Gurugram road to Haryana /Rajasthan Border Stretch (Ch
0+000 to 78+800) of Delhi-Vadodara Expressway in the state of Haryana] and Panagarh- Dankuni Stretch
(Ch 521+120 to 652+700) of National Economic Corridor of NH-19 in the state of West Bengal
Certified that, M/s Chaitanya Projects Consultancy Pvt. Ltd. have been awarded the subject Consultancy
Services for DPR preparation works consisting of the following stretches:
-101 Km
(v). Paniyala-Alwar-Barodameo stretch of Inter-corridor route Narnaul-Alwar- Bharatpur-95 Km
The Consultant have completed the submission of Detailed Project Report along with bid documents and Technical
schedules for Panagarh-Palsit and Palsit-Dankuni Section of National Corridor NH-19 of subject project in the state
of West Bengal from Panagarh to Palsit (km 521.120 to km 588.870) and Palsit to Dankuni
(km 588.870 to km
652.700).
Salient feature of the Combined Panagarh-Palsit-Dankuni section of National Corridor of the
Work is as under:
Consultancy
AUTAON
7. Type of Alignment
Existing Alignment (Widening to 6 Lane + Service
road) IONI
PIU-DURGAPUR/9
Preparation of Bid
document (BOT Toli Schedules)
PIU-DURGAPUR/
VION 9
VN
FIRMS RELEVANT EXPERIENCE IN LAST 7 YEARS
Narrative Description of Project: This project has 4 packages. Package I: -Four Laning of Madanapalle
to Pileru Section of NH-71. Package II: -Four Laning of Pileru to Tirupati Section of NH-71. Package III: -Six
Laning of Chittoor to Mallavaram Section of NH-140. Package IV: -Six Laning of Renigunta to Naidupeta
Section of NH-71.
Foundation – Pile
Pandaveswar on NH-60 at N-60 Km 303.900
Length of Structure (m)(ROB Proper + Viaduct)- 666.0m
(ROB Proper- 1x37.0)
(Viaduct- 17x37.0)
Total Length- 1758 M, 6 Lane
Structure Type - Steel Composite Girder + PSC Girder
Foundation – Pile
Bhimghar on NH-60 at (Km 307.050) ( LC No-10-B/T)
Length of Structure (m)(ROB Proper + Viaduct)- 662.960m
(ROB Proper- 2x63.480)
(Viaduct- 20x25+2x18)
Total Length- 1675 M,6 Lane
Structure Type - BOW String + RCC T-Beam
Foundation – Pile
Suri on NH-60 at km 338.600 (LC No-21/SPL/E) .
Length of Structure (m)(ROB Proper + Viaduct)- 361.480m
(ROB Proper- 1x51.480)
(Viaduct- 9x18+4x37)
Total Length- 1343 M, 6 Lane
Structure Type - BOW String + PSC Girder + RCC T-Beam
Foundation – Pile
ASHOKNAGAR at Km -20.578 (LC NO26/T –A) on NH-35.
Length of Structure (m)(ROB Proper + Viaduct)- 591.0m
(ROB Proper- 1x110)
(Viaduct- 13x37)
Total Length- 1324 M,3 Lane
Structure Type - Steel truss + PSC Girder
Foundation – Pile
HABRA 27/T-A at Km-22.882 on NH-35
Length of Structure (m)(ROB Proper + Viaduct)- 772.960m
(ROB Proper- 2x63.48+1x78)
(Viaduct- 14x37+2x25)
Total Length- 1200 M,3 Lane
Structure Type - Steel Truss + BOW String + PSC Girder + RCC T-Beam
Foundation – Pile
HABRA 28/T-A on NH-35at Km -23.969
Length of Structure (m)(ROB Proper + Viaduct)- 591.0m
(ROB Proper- 1x110)
(Viaduct- 13x37)
Total Length- 1053 M, 3 Lane
Structure Type - Steel truss + PSC Girder
Foundation – Pile
BONGAON 23SPL/T on NH-35 at Km- 52.712
Length of Structure (m)(ROB Proper + Viaduct)- 591.0m
(ROB Proper- 1x110)
(Viaduct- 13x37)
Total Length- 1052 M,3- Lane
Structure Type - Steel truss + PSC Girder
Foundation – Pile
ROB near RUB No. 20 at km 232/16 ‐18 between Kumardubbi –Mugma station on Grand chord
section under Dhanbad Division
Structural Length- 573.68 M
Total Bridge Length- 999.68 M, 2 Lanes
ROB near Km 312/16‐18 ( RBK‐14) between CBSA‐SIPA stations on NH‐75 (Ext) under NH Division
Chaibasa
Structural Length- 359.75 M
Total Bridge Length- 979.75 M, 2 Lanes
ROB near Km 325/4‐6 between SIPA – JNK stations on NH‐75 (Ext) under NH Division Chaibasa
Structural Length- 589.632 M
Total Bridge Length- 1338.6 M, 2 Lanes
ROB near Km 330/12‐14 betweenJNK‐ TABU stations .
Structural Length- 414.632 M
Total Bridge Length- 1068.632 M, 2 Lanes
ROB near Km 335/12‐14 between JNK – TABU stations on NH‐75 (Ext) under NH Division Chaibasa
Structural Length- 404.632 M
Total Bridge Length- 1543.632 M, 2 Lanes
ROB near Km 339/36‐38 between TABU‐KNPS stations on NH‐75 (Ext) under NH Division Chaibasa
Structural Length- 539.711 M
Total Bridge Length- 1114.71 M, 2 Lanes
ROB near MH‐4 in Km 358/31‐33 between SILLI –MURI stations on under Road Division Ranchi
Structural Length- 257.25 M
Total Bridge Length- 739.25 M, 2 Lanes
ROB near Km 376/7‐11 between NOMD‐BJMD stations on NH‐75 ( Extn) under NH Division Chaibasa.
Structural Length- 203.25 M
Total Bridge Length- 689.25 M, 2 Lanes
ROB near level crossing No. MH‐21 at Km 408/5‐7 between Namkum – Tatisilway stations under
Location Within Country: Andaman & Nicobar Island Professional Staff provided by firm:
7
Name of Client: National Highways & Infrastructure Development No of Staff Man Months: 56
Corporation Ltd.
Start Date: 09/2010 Completion Date: 07/2012 Approx. value of services: Rs.325.42
Lakhs
Name of Associate Firm (if Any): CEC Projects Pvt. Ltd. No of Man Months of Professional
Staff Provided by Associate Firm: 4
Name of Senior Staff involved and functions performed:
Mr. S. K. Sinha - Team Leader- Senior Highway Engineer
Mr. C. D. Singh - Senior Bridge Engineer
Mr. Pranay Verma - Highway cum Pavement Engineer
Mr. Gyan Chand Sanhotra – Senior Geotechnical Engineer
Mr. Omkara Verma – Traffic / Road Signage / Marking and Safety Expert
Mr. Amod Thakur - Material-cum-Geo-Technical Engineer –Geologist
Mr. Aboo Asif - Senior Survey Engineer
Mr. Sharad Verma - Environmental Specialist