Professional Documents
Culture Documents
PM TR 20 414 En-Gb PM-SW+MMIS+SWP
PM TR 20 414 En-Gb PM-SW+MMIS+SWP
PM TR 20 414 En-Gb PM-SW+MMIS+SWP
This document contains proprietary, confidential, and copyrighted (under the laws of the United States an
countries) materials of The Procter & Gamble Company (P&G), under license from P&G. This document ma
duplicated, and the licensed information therein may not be used or disclosed in whole or in part for any purp
than as authorized by P&G. Any use or disclosure in whole or in part of licensed information without the expr
permission of P&G is prohibited.
ntenance
ormation System
MMIS (Maintenance Management Provide a standard work process that creates and
maintains PM/AM master data in an accurate and timely
Information System - Master Data) fashion, in order to meet the needs of maintenance
planners and operators BOM Accuracy, Not-on-a-BOM
PILLAR: CUSTOMERS: ACTION OR CONTROL LIMIT:
Progressive Maintenance Maintenance Planners and Operating Departments >1% NOB
WORK PROCESS OWNER: CUSTOMER
100% StockedREQUIREMENTS:
Parts on BOM's; Continual PERSON RESPONSIBLE:
Improvement/Change Process PM Pillar Leader, MMIS Owner
SYSTEM PRODUCTS: STRATEGIC OBJECTIVES: DATE LAST UPDATED:
Provide a clear and effictive system for creating and
maintaining PM Master Data Achieve goals through use of established work process 13-Oct-15
MAJOR PROCESSES SYSTEM MAINTENANCE AND QUALITY INDICATOR
In-Process Measures Action or Control Limits Who Investigates
# of parts not on a BOM Should be no ERSA materials that are in inventory MMIS Owner
Registration Structure Building Planning Information #/% of parts not on a Should be 0 parts that are not at correct location; MMIS Owner and
Management BOM at correct FL for any parts not at correct location should have Maintenance Planner
the planner corresponding change request or followup with
maintenance planner
# of BOM's to delete; $ BOM's not needed should be deleted (except for MMIS Owner
of potentially obsolete Platform-Managed "B" BOM's), and obsolete parts
parts should be scrapped
Platform- FLDB Structure -
Management non-Platform Proficy AM Master
Structure Managed Data Management # of open change SLA established between MMIS Owner and Plant at MMIS Owner
Management requests site or department level
# of days, average, to
process a change
request
Material Registration Sub-Process
Will part be
Does YES Is material NO Add new plant purchased in
material linked to link to existing next 2 yrs?
exist? plant? material
Notifies
YES NO storeroom of view
creation via
NO YES Enter estimated Select no action trigger database
annual
Create new consumption (Step required
material Update description 1 Trigger) (Step 1 Trigger)
Is description and/or classification
and/or NO info for existing
classification
data good for material Sends material
plant?
info to purchasing
via trigger
database
Check status of
your materials
Run where-use Create MRP and
report and Storage views
confirm that
materilal is not (Step 3 Trigger)
Are all NO Are any YES on a BOM; then
materials materials
Status D?
flag material for
released?
deletion
Based on
YES NO pending status
(P1, P2, P3, P4),
Material update any
Registration necessary
complete information
This document contains proprietary, confidential and copyrighted materials of The Procter & Gamble Company (P&G), under license from P&G. The licensed information therein may not be used or disclosed in whole or in part for any purpose other than as authorized by P&G.
Operator / Equip. owner Team PM Leader Planner ODL / Line Leader Module PM Leader Module Manager
L:\IWS Pillars\PM
Pillar (F Lanza)\10 Countermeasures t o Breakdown\New BDE Materials\Breakdown and Countermeassure tracking sheet.xls
(7)
Reviews the Breakdown in the Provides the Standards for the
DDS and assigns or completes BDE DMS.
immediate follow-ups.
(2) Assists with Notification / Work
Creates a Notification / Work Order if needed.
Order in SAP to get parts
Checks the Action Plans and follows Works with the Department
up on the execution. Leaders/Planners to ensure DMS
Provides feedback to basic systems is maintained. Helps to
(CIL, TBM, WPS) when necessary. coordinate issues between
Departments and facilitates
reapplications.
(4)
Completes the initial PM Card, in
SAP notification and has the
work order linked for cost Y Helps to complete the Y Y(9) Y Y Y Y
tracking purposes. E breakdown documentation. E Does theEBreakdown E E E E
(See notification OPL in step 2) S S meets theSCriteria for In- S S S S
depth Analysis
Criteria should be
depart. specific to meet
CBN. Tracks and analyzes Module /
Department data to share with
Leadership and update the Site PM
Pillar Team.
YES
(5)
Takes all failed parts /
components to the Morgue. NO
(Use site specific Part tagging
standards)
(11)
Determines if the Root Cause was addressed by the Immediate Fix.
(12)
Updates the Notification / WO with
updated, Component, Damage and
Cause.
L:\IWS Pillars\PM
Pillar (F Lanza)\10 Countermeasures to Breakdown\New BDE Materials\BD Notification data.doc
NO NO NO (13) NO NO NO
Insures that the In-depth Analysis
Report is routed back to the
EO,Teams and and department
leadership.
(14)
Tracks the Countermeasures to insure
Verification, Reapplication and
Standardization.
Follow Change Management and
insure TDB is updated.
(15)
The Planner leads the Weekly Planning Meeting to include the review of all Breakdowns, In-depth Analysis Reports and Countermeasures. One meeting a month needs to
include the Monthly Review portion of the BDE DMS. This should include a review of results versus glide path and setting priorities for the next month. Participants (Weekly
and Monthly) should include the Department Leadership and key operators.
Maintenance/
Site MMIS Resources
Initiatives
This document contains proprietary, confidential and copyrighted materials of The Procter & Gamble Company (P&G), under license from P&G. The licensed information
part for any purpose other than as authorized by P&G.
tructure Building Sub-Process
rm-Managed Equipment)
From Material
Registration Process - All
Create Material BOM's new Materials are
in G11 and insure they registered, and are
are not Blocked released
Company (P&G), under license from P&G. The licensed information therein may not be used or disclosed in whole or in
Maintenance Planning Data Building Sub-Process
Maintenance/
Site MMIS Resources
Initiatives
Equipment identified
that needs to be Create Measuring Point in
Create Functional
maintained - Local SAP Box
Location Task List in
strategy and (Cycle-Based
Local SAP Box
procedure Maintenance Only)
developed
This document contains proprietary, confidential and copyrighted materials of The Procter & Gamble Company (P&G), under license from P&G. The licensed informa
in part for any purpose other than as authorized by P&G.
g Data Building Sub-Process
If linking to an external
file, SAP document
record created in G11. If
using standard text,
standard text has been
created in local box.
asuring Point in
l SAP Box Create Maintenance
le-Based Plan in Local SAP Box
nance Only)
From Material
Registration Process - All
materials through Step 3
of trigger database, no
block on material;
maintenance strategy
loaded
ompany (P&G), under license from P&G. The licensed information therein may not be used or disclosed in whole or
Platform-Management FLDB Structure Management
This document contains proprietary, confidential and copyrighted materials of The Procter & Gamble Company (P&G), under license from P&G. The licensed infor
disclosed in whole or in part for any purpose other than as authorized by P&G.
re Management
Global MMIS
rce about line
tion if not greater
days in advance
ocal BOM's as
Needed
nder license from P&G. The licensed information therein may not be used or
FLDB Structure Management - not Platform-Managed
This document contains proprietary, confidential and copyrighted materials of The Procter & Gamble Company (P&G), under license from P&G. The licensed informa
or disclosed in whole or in part for any purpose other than as authorized by P&G.
m-Managed
cense from P&G. The licensed information therein may not be used
Category Audit Point
Accountability MMIS Owner(s) in place
Parts in storeroom (ERSA's), bins labeled with MMR# 100% inventory pre-req
for Phase 2
Understanding of parts where-use (Functional Location) captured in legacy
system or tracking tool
Parts registered in a timely manner; Step 2 portion of
parts registration tracked; gaps identified and action
plan in place
ble Company (P&G), under license from P&G. The licensed information therein may not be used or disclosed in whole or in part for any purpose other than as authorized by P&G.
et
et
et
et
tM
tM
tM
tM
e
e
rg
rg
rg
rg
Ta
Ta
Ta
Ta
if
if
if
if
ck
ck
ck
ck
he
he
Ch
Ch
C
C
Phase 2 Target Phase 3 Target Phase 4 Target
Maintain Maintain Maintain
MMIS training
MMIS training
MMIS training
MMIS training
MMIS DMS Scorecard
Department:
Planner:
% Not on a BOM 0
Measures
This document contains proprietary, confidential and copyrighted materials of The Procter & Gamble Company (P&G), under license from P&G. The licensed informat
September October November December January February March
ense from P&G. The licensed information therein may not be used or disclosed in whole or in part for any purpose other than as authorized by P&G.
April May June
ed by P&G.
Maintenance Management Information System Owner Step up Card
Name: ________________________________________
Qualifier: ________________________________________ First Assessment Second Assessment Third Assessment
Target Proficiency
Target Date
Area Knowledge/Skill Date Evaluation Date Evaluation Date Evaluation
Leadership 1 Can lead a team (lead a meeting, run team assessment tool) 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
2 Can develop a vision, identify losses, develop masterplan and action plans 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
3 Can train and qualify technicians and leadership team 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
4 Can explain plant reapplication process and system 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
5 Can explain the internal benchmarking system for the system 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
6 Can create & deploy a standard 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
7 Can explain the skill matrix process for plant pillar team and in departments 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
8 Can explain and follow 5 S principles in the work place 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
System Process 1 Can create and explain the System Summary & Flow Chart 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
2 Can explain and follows Plant Standard for storage and access of system materials 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
3 Can exlpain the PDCA/SDCA cycle process for the system 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
4 Can exlpain the measures and targets/goals of the system 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
5 Can exlpain and show the link to other PM systems 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
6 Can to improve the system activities on the floor 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
7 Can explain the training needs of this system for each IWS phase 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
8 Can create and improve the system audit/healthcheck 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
9 Can conduct a system audit/healthcheck and plan actions to close gaps 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
10 Can create of One Point Lessons that explain key points of the system 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
Technical mastery 1 Can Explain the role of the MMIS Owner 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
Can explain how components of the information system support the 7 Basic components of an
2 effective Planning & Scheduling system. Describe 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
how you are keeping the whole system effective
3 Can Explain the role of the site individuals involved in master data management 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
Can explain the change management process including, changes driven by engineering, site
4 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
improvement work, job critiques or discovered data base errors.
Can explain the process for assessing if the master data is meeting the needs of the maintenance
5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
planners.
6 Can explain why and how BOM's are used to meet Internal Audit requirements 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
7 Can explain the SAP architecture for PM master data and why it is set up the way it is. 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
Can explain the process for working with Purchasing to ensure Service Level Agreements for
8 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
material registration is within agreement levels.
9 Can explain the steps of material registration. 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
10 Can explain the 2 key uses of a task list. 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
11 Can explain the purpose and output of the TDB Healthcheck, Blocked BOM report, NOB report. 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5