I) The Network Flow Diagram of The Project Is Given Below
I) The Network Flow Diagram of The Project Is Given Below
I) The Network Flow Diagram of The Project Is Given Below
Time(Days) 8 10 8 10 16 17 18 14 9
E = 28 L = 28
5
10 17
E = 18 B F E = 45
3 J 7
0
E=0 E = 8 10 L = 18 9 E = 54
L = 45
D I
1 A 2 1
8 0
E E = 24 E = 50 L
L = 54
L = 8 16 0
L=0 4 9
E = 32 L = 50
18
C G
L = 24
8 6 K 0
H
L = 32
14 8 E = 46
L = 46
The Early Start time, Early Finish time, Late Start time and Late Finish time for all nodes
are given below,