NOTES

GENERAL

CONSTRUCTION
ALL SOIL UNDER SLAB AND AROUND
EXTERNAL FOUNDATION TO BE TREATED
PLANT OPERATIONS FLOOR WITH AN APPROVED ANTI TERMITE

29,600
CHEMICAL TREATMENT
ALL SLABS AT GROUND LEVEL TO BE
TERRAZZO FLOOR FINISH POURED ON 500 GAUGE POLYTHENE
SHEETING ON 50 MM THICK MURRAM
BLINDING ON AVERAAGE 300 MM THICK
WELL SELECTED AND COMPACTED
HARDCORE FILL ALL WORKS AND
SUPERVISION TO BE UNDERTAKEN BY
COMPETENT PERSONEL. ALL DRAWINGS TO
BE READ IN CONJUNCTION WITH EACH
OTHER AND RELEVANT CONTRACT
DOCUMENTS. CONTRACTOR TO ASCERTAIN
ALL LEVELS GRADIENTS AND MATERIALS IN
CASE OF ANY IRREGULARITIES TO BE
NOTIFIED TO THE ARCHITECT OR ENGINEER
MS RAILING ON SITE BEFORE COMMENCEMENT OF
WORKS, FIGURED DIMENSIONS TAKE
PREFERENCE I.E. DO NOT SCALE
200 4,500 200 2,600 200 DRAWINGS UNLESS STATED OTHERWISE.
ALL DIMENSIONS ARE IN MILIMETRES. ALL
SOIL ON CUT EMBARKMENTS TO BE
STABILIZED. THE SLOPE SHALL NOT EXCEED

100
THE ANGLE OF RESPONSE
STRUCTURAL
200

200
BALCONY FOUNDATION DEPTH TO BE DETERMINED
PV CER. TILES ON SITE AND TO THE APPROVED BEARING
PV PV ALL RC WORKS TO BE AS PER STRUCTURAL
ENGINEER'S DETAILS. NO CASTING OF ANY
WORKS TO BE UNDERTAKEN WITHOUT HIS
11 11
10 10
12
9
12
9
PRIOR INSPECTION AND APPROVAL
13 13 ALL WALLS LESS THAN 200 MM THICK TO BE
8 8
REINFORCED WITH HOOP IRONS AT
ALTERNATE COURSES. ALL SURFACES TO
14 14
7 7

OFFICE BE CLEAR OF BLACK COTTON SOIL TO A

6,200
15 15
6 6

20G x 309

20G x 309
20R x 150

20R x 150
5,800
16 16 DISTANCE OF THE EDGE OF THE SURFACE
5 5
17
CER. TILES 17 MECHANICAL
4 4
ALL PLUMBING AND DRAINAGE WORKS TO
RECEPTION 18
3
18
3 COMPLY TO RELEVANT AUTHORITY AND
MOH REGULATIONS. PERMANENT
CER. TILES
19 19
2 2
VENTILATION TO BE PROVIDED ABOVE ALL
PASSAGE

20 20
1 1
DOORS AND WINDOWS EXCEPT ABOVE WC
CER. TILES
TERRAZZO FLOOR FINISH

UP UP
DOORS. SOIL VENT PIPE (SVP) TO BE
DOWN DOWN
LOADING BAY

9,600

PROVIDED AT THE END OF DRAINAGE. ALL


STAIRS STAIRS MECHANICAL AND ELECTRICAL WORKS TO
PV PV BE COORDINATED. ANOMALIES TO BE
CER. TILES CER. TILES CLARIFIED BEFORE COMMENCEMENT OF

200

200
200

WORK. ALL SERVICE DUCTS TO BE


ACCESSED FROM ALL FLOORS. DRAINS
PASSING BENEATH BUILDINGS AND

200
1,000

DRIVEWAYS TO BE ENCASED IN 150MM


THICK CONCRETE SURROUND. PLASTERING

1,700

1,700
TO BE DONE AFTER TESTING OF PIPES

2,400
200

ELECTRICAL. ALL CONDUITS TO BE LAID


LADIES PV GENTS PV BEFORE PLASTERING
LEGEND
BATH
1,200

200

200
PV- PERMANENT VENTILATION IC-
CER. TILES INSPECTION CHAMBER

200
GENTS LADIES MH- MANHOLE HC-
200

HOT WATER CYLINDER


1,700

1,700
PV PV GT- GULLEY TRAP FT-
BATH
1,000

1,000
FLOOR TRAP
UTILITY CER. TILES NOTES
PV
THESE PLANS HAVE BEEN DRAWN
ACCORDING TO HIGH QUALITY STANDARDS
PV
200

200

200

200

200

200
AND PRACTICES AND ARE AN ACCURATE
200 200 200 200 200 200 GUIDE TO BUILDING CONSTRUCTION.
200 4,500 200 1,800 1,100 1,300 1,000 1,300 200 200 3,100 200 1,300 1,000 1,300 200 HOWEVER, LOCAL REGULATIONS AND
LOCAL BUILDING CODE REQUIREMENTS
VARY, AND AS SUCH, MAY REQUIRE
CHANGES.
200 12,000 200 200 3,100 200 4,000 200

GROUND FLOOR PLAN FIRST FLOOR PLAN

ARCHITECTURE AALIS STUDIO


Title: PLANS Scale: 1:100 @ A1 Project: Project:
ELEVATIONS Date: 12/2/2020 File:
INTERIOR DESIGN studioaalis@gmail.com
Drawn: A.O
URBAN PLANNING tel 0712 13 27 93 SECTION Checked: A.O Drawing:
COPYRIGHT © AALIS AVANT GARDE LTD
GSPublisherVersion 0.33.100.100