Professional Documents
Culture Documents
Besiktas Training
Besiktas Training
Engine Officers
Chief Engineer
Deck Officers
Engine Cadet
Gas Engineer
Engine Crew
Deck Cadet
Pump man
Deck Crew
Electrician
Steward
Master
Cook
Onboard Training
Code Matrix Training Period
TRO-03 On-signers Prior to departure but not more
Familiarisation than 24 hours whichever comes X X X X X X X X X X X X X
Checklist first.
TRO-14 Security Prior to the vessel sailing or,
Familiarization within 24 hours of joining, X X X X X X X X X X X X X
Training whichever comes first
TRO-04 Specific Within 14 days after
Familiarization embarkation X X X X X X X X X X X X X
Check List
TRO-05 Familiarization with Within 24 hours or before
Bridge Equipment taking over the first watch
X X X X
whichever comes first after
joining date
TRO-06 ECDIS Within 24 hours or before
Familiarization taking over the first watch
X X
whichever comes first after
joining date
TRO-07 Familiarisation with After the Safety Tour within 24
Cargo & Ballast hours or before first
X X X X X
Equipment - Tanker watch/maneuvering whichever
comes first after embarkation.
TRO-08 Familiarisation with After the Safety Tour within 24
Cargo &Ballast hours or before first
X X X
Equipment - Bulk watch/maneuvering whichever
comes first after embarkation.
TRO-09 Familiarization with Within 24 hours or before
Engine Room departure whichever comes X X X X X
Equipment first after embarkation
TRO-10 VGP-USA Training If the vessel is heading to USA
X X X X X X X X X X X X X
before entering the EEZ.
TRO-11.1- Pre-promotion During every contract period
11.5 Trainings (Will be given by master or chief X X
engineer) as stated at 1.5.5.3
M6 - App 02 Annual Onboard As stated at App. II
Training X X X X X X X X X X X X X
Programme
11 - NOV
05 -MAY
10 - OCT
08 -AUG
12 - DEC
01 - JAN
03-MAR
02 - FEB
09 - SEP
04- APR
06 -JUN
07- JUL
SOURCES
CODE SUBJECT / Konular
KAYNAKLAR
- SMS Manuals and
SMPEP/SOPEP Supporting Documents
Water Ballast Treatment (WBT) - SMPEP, SOPEP, WMP,
TRO-2.1 Garbage Management GMP, Garbage Record x x x
Ship Security Plan (SSP) Book
Volatile Organic Compounds (VOC) as aplicable - Related
Videotel/Seagull videos
HSSEQ Excellence, Concept Of Safe Operations and
Company Policies
-Health, Welfare and Safety Policy & Environmental
- SMS Manuals and
TRO-2.2 Protection Policy & Energy Conservation Policy &
Supporting Documents x x x
Quality Policy & Drug and Alcohol Policy & Security
Policy & Anti-Corruption, Anti-Bribery and Ethics
Policy, Cyber Security Policy
Environmental Protection and Energy Efficiency
- EMS Manual and
Policies and Implementation - SEEMP
TRO-2.3 Supporting Documents,
-The content and requirements of Environmental and - SEEMP of the vessel x x x
Energy Management Plan and requirements, SEEMP
- SMS Manual-1 Chapter
Management Review Meeting Report, Company
TRO-2.4
Targets and Objectives
2 Objectives and x x x
Supporting Documents
- SMS Manuals and
Nearmiss, Incident, Hazardous Situation, Supporting Documents
TRO-2.5
Improvement reporting and Open Reporting Culture - Related x x x
Videotel/Seagull videos
- SMS Manual-3 Chapter
Permit to Work System of Company and Stop Work 2.1.1 & 2.6
TRO-2.6
Authority - Related Videotel / x x x
Seagull videos
11 - NOV
05 -MAY
10 - OCT
08 -AUG
12 - DEC
01 - JAN
03-MAR
02 - FEB
09 - SEP
04- APR
06 -JUN
07- JUL
SOURCES
CODE SUBJECT / Konular
KAYNAKLAR
Hygiene In The Ship
- Personnel hygiene - SMS M-3 Company
- Food hygiene Rules Ch 2
- Galley hygiene - Related Videotel / x x x
TRO-2.7 Seagull videos
- Accomodation hygiene
- General hygine
- Cyber Security Plan
TRO-2.8 Cyber Security - Related Videotel / x x x
Seagull videos
GMDSS - Ship Spesific Training* - Ship Spesific Manuals
TRO-2.9
- MSC Circular 1208 - SOLAS Training Manual x x x x
- Shell Learning
TRO-2.10 Shell Reflective Learning and Resilience Training
Engagement Tools x x x
Practical Mooring Training (On site training)
Starting of mooring winches and windlass
Using mooring winch drum or capstan for heaving
and lowering ropes
How to secure winch brakes and BHC set point
How to engage and disengage mooring winch and
windlass, Use of split drums, Turning ropes on bitts - Mooring System
TRO-2.11 The lead of mooring ropes, using different types of Management Plan x x x
mooring ropes, using different types of rope - SMS M2A Chp 1.7
stoppers,
Snap back zones, Signaling and communication,
Picking up and releasing a towline,
Use of messengers and heaving lines etc.
Prevention of mooring line fouling in moving / turning
parts (e.g.: propeller, thrusters).
* All personnel who may be required to operate the GMDSS equipment to receive ship-specific training, on joining the ship, and as above and to be recorded to GMDSS Log as per STCW Section B-VIII/2 parts 4-3
Paragraph 12 / GMDSS Ekipmanlarını kullanacak kişilere gemiye ozel eğitim planlamaları ve atamaları katılış öncesinde ve sonrasındaki yukarıda belirtilen aylarda verilmelidir ve STCW Section B-VIII/2 parts 4-3 Paragraph
12’ye göre GMDSS Jurnaline kayıt edilmelidir.
Not: This training programme could be improved by the Master according to the onboard training needs and supported by Seagull or Videotel DVD’s. / Bu eğitim programı kaptan tarafından gemideki eğitim ihtiyaçlarına
gore geliştirilebilir ve mevcut Seagull ya da Videotel DVD’leri ile desteklenebilir.