PRE-FEASIBILITY REPORT
Development of the State of Art Integrated Sports Complex with Sports Science Center
PRE-FEASIBILITY REPORT
ON
DEVELOPMENT
OF
THE STATE OF ART
INTEGRATED SPORTS COMPLEX
WITH
SPORTS SCIENCE CENTER
AT MOUNT ROAD, CHENNAI
TABLE OF CONTENT
1.3 Aim 05
1.4 Objectives 06
Over the last two decades, the role that destination tourism attractions, such as Sports facilities,
play in their communities has changed markedly. Whereas two decades ago, the common tactic
was to develop single purpose facilities with the intent to serve the one possible cross section of
a local community, today’s facilities are often developed with the intent of attracting a multi -
purpose niche of visitors to an area and, as such, are marketed based on their ability to generate
economic activity. As this has occurred, society has also become more mobile and time
constraints for families much greater, which has translated to the rise of short duration,
purpose-driven family trips that coincide with tournament and competition lengths. For
communities, the single-purpose entertainment and sports market has led to changes in
development strategies and the emergence of facilities and attractions that offer specialized,
distinct, and fee-for-service amenities that appeal to everyone. In addition to the factors
mentioned above, the following characteristics have also contributed to this evolution:
For sports facilities that are typically not self-supporting, the rationale for development
is often combined with the value it creates for the community through increased
visitation, and thus, fiscal return based on increased lodging, restaurants, or retail
spending. In this instance, sports facilities can be positioned as an economic
development vehicle, rather than a community resource, although certainly the local
residents use and benefit from its presence.
The quantum of funds needed to supplement the infrastructure and other urban
development projects is too high to be solely borne by the government is almost
impossible. Thus for the smooth and efficient functioning of selected public sector
functions can be operated as enterprise systems (e.g. use fees to minimize operating
support) or on DBFOT (Design Built Finance Operate and Transfer) basis or J.V. (Joint
Venture) or Partnership.
DBFOT / J.V. trend is most notable in sports facility operations where recent fiscal
constraints have led to increased reliance on revenue self-generation for sports facility
initiatives.
The above changing trends and culture creates a demand for developing a State of Art
Integrated Sports Complex with Sports Science Centre, where under one umbrella you have all
the Sports with Learning, Leisure, Recreation, Self-Development as well benchmarking Esteemed
Sports Personalities from the State.
This will also satisfy Chennai’s requirement of state of art sports infrastructure, and at the same
time treated as ALL AGE ALL SPORTS. The concept can be summarised as a scientific base of
sporting events, complete fun & entertainment package (Sports Tourism) for every visitor of the
centre irrespective of age, sex or interest.
The development of such a state of art facility should be carried with the objective of:
The vision for a world class facility will be more than just a standalone development that opens
for events, it should be integrated into the fabric of the urban environment and be part of, and
help to create its surrounding community – whether that be residential, a sporting precinct or
commercial. It can effectively provide a stimulus for urban renewal or regeneration.
Aim’s to develop and render best practices with state-of-art research center to modelled THE
ATHLETES; incarnating the zeal to reach fullest potential for breaching success in the field of
“Varied Sports”.
It will render Inspiringly Cohesive Atmosphere to the Athletes to upfront the challenges at
various sporting events associated with the All Kind of Sports seeking the “Success Mantra”.
It will enhance the personal / personality development skills of the Athletes and will result to
Motivated Trained Sports Professionals becoming Nation’s Pride, Feathering Tamil Nadu State
on World Map.
Ultimate Eye is to breach the International Medallion Counts benchmarking success in the field
of All the Sports.
It will generate the awareness, develop and evolve the Athletes throughout THE NATION for all
the Associated Games.
1.3 AIM:
This aims to develop an Integrated Sports Complex with Sports Science Center for Sports
Athletes, to achieve Excellence in the precision for eyeing the success Marking the History for
the Sporting Events at National and International Echelons.
Develop, Nurture and Promote the Athletes from especially from Tamil Nadu State to deliver at
the World Championships and Olympics……
Women, Junior Men and Women Athletes will be given topmost priority in the initial phases of
development.
FOCUS AND
PRACTICE
ATTAIN
LEARN INSPIRINGLY
ENTREPRENEURSHIP
MEDALIZE REVITALIZE
SUCCESS ZEAL
Tamil Nadu to a permanent spot on the Global map for Olympic Sports
Tamil Nadu tourism, and
Offering continuous Employment opportunities for Tamil Nadu Sports graduates
1.4 OBJECTIVES:
1.5 APPROACH:
• Clubbing the above Design Components following criteria’s are mandate for the Designing
the Center wherein utmost attention and care shall be adhered to for detailing out the
Center:
• Planning Integration
• All the above spaces will be planned with utmost attention to comply the
international standards for designing and detailing out every design
components within the center with utmost care for the integral services
within the development.
• Revenue Generation
Site Panorama
With the site context, basic spatial organisation is derived below with the optimum utilisation of
the water frontage and adopting Green and Sustainable Architectural Techniques for the
Project.
The major components of the State of Art Integrated Sports Complex are as follows wherein the
detailed area program is specified subsequent to the following summary:
D. SPORTS UTILITIES
E. ESSENTIALS
G. & H. VIRTUAL GAMING AND ADVENTURE SPORTS AND CENTER FOR SPORTS SCIENCE
J. OUTDOOR ARENA
Note:
* - Semi Covered & ** - Shooting lanes will be open to sky and players area (shooting area)
will be covered.
Importantly the land of 5.00 Acres in Mount Road, Chennai will be over
the lease and the lease rental as discussed is 10.00 Lakh / Annum. The
Cash-Flow prepared is based with the consideration of the 10.00 Lakh /
Annum Lease Rental without escalation upto 2035.
The following section shows the rough order of magnitude cost of the development of the
project wherein subject to the site situation and topography and prices escalation from the
competent authorities will result in the change in the prices:
Total Cost in
Sr. No. Description / Heads Area Unit Cost per unit
Rs. (Cr.)
1 TOTAL BUA including Basements 26459.63 Sq. m. -- --
2 Land Development 5.00 Acres 20,00,000/- 1.00
3 Infrastructure Development 5.00 Acres 35,00,000/- 1.75
4 Cost of Construction
(a) Developable BUA 20274.63 Sq. M. 2000.00 per sq. ft. 43.65
(b) Basement 6185.00 Sq. M. 1500.00 per sq. ft. 9.99
5 TOTAL CONSTRUCTION COST 56.39
Note:
1) Over all the Construction Cost will come to Rs. 1979.92/- sq. ft. which are excluding the
cost of Contingencies, Overhead and Miscellaneous Expenses (15%) along with the
Contractor Profit (10%).
2) The above excludes the following cost:
a) Land Cost / Lease Value
b) The above cost excludes the cost of Interiors, Loose Furniture and Furnishings.
c) The above cost excludes the cost of all the Sports Equipments, Cost of Armory
for the Shooting Academy.
d) The cost of NA, NOC’s and Statutory Permissions from the Competent Authority
viz. Development Authority, Pollution Control Board, Ministry of Environment
and Forest, Local Regulatory Body etc.
e) The Cost of Project Management and Construction Management
Total Cost in
Sr. No. Description / Heads Area Unit Cost per unit
Rs. (Cr.)
Interiors, Loose Furniture, Fixtures
6 26459.63 Sq. m. 700 Rs. / sq. ft. 19.94
and Furnishings - Civil
7 CONSTRUCTION & ALLIED COST (5+6) 76.33
NA, NOC’s and Statutory Permissions
8 26459.63 Sq. m. 50 Rs. / sq. ft. 1.42
from various competent authorities
9 Consultancy Cost 26459.63 Sq. m. 125 Rs. / sq. ft. 3.56
10 Sports Equipments
(a) Shooting Range and allied -- -- L.S. 5.00
All Other Sports Equipment with Turf
& Nets along with the procurement
(b) -- -- L.S. 25.00
of the Single Time Sports & Gym
Equipments etc.
EQUIPMENTS & ALLIED COST (TOTAL
30.00
OF 10)
TOTAL COST INCLUDING ALL THE
11 111.31
COMPONENTS (7 + 10)
The overall project cost will be 181.58 Cr. wherein the SPV will be responsible to undertake the Project
Development under DBFOT Model.
Project development cost with ready-to-move in will come to INR 4434.90 per sq. ft. excluding the
Escalation, Interest Component, Pre-Operative and Preliminary Expense and applicable taxes.
Over All Cost with ready-to-move will come to INR 6375.50 per sq. ft. including the Escalation, Interest
Component, Pre-Operative and Preliminary Expense and applicable taxes.
Description /
Sr. No. 09 11 13 15 17 19 21 23 25 18 19 20 21 22 23 24 25 26 27
Monthly
A DESIGN DEVELOPMENT
Land
1
Identification
2 Land Survey
Infrastructure
3
Assessment
Appointment
4
of Consultant
Finalization of
5
Space Program
All Applicable
6
NOC’s
Master &
7
Micro Planning
Infrastructure
8
Planning
Architecture &
9
Allied Services
Sanctions and
10
Clearances
B CONSTRUCTION
1 Site Grading
Site
2
Infrastructure
3 Civil Works
Finishing and
4
Interior Works
5 Completion
C LICENSING
Application for
1
Licenses
Obtaining
2
Licenses
Subject to all the mandates and the clearances it will take 27 months (excluding monsoon) to
complete the execution of the project and will be made operational viz. the “9th” month is
considered as the start month post completion of the mandates including planning and all allied
formalities from the competent authority.
In this section an initial framework for a business plan for the State of Art Integrated Sports Complex
with Sports Science Center has been done. To set the context, the financial analysis makes the following
observations.
Since this project is on DBFOT / J.V. format from the perspective of the economics associated with the
project are based on the selected concessionaire as the owner and operator of the
Sports/Recreation/Leisure Centre for a concession period of 35 years which includes the construction
period if feasible. The construction period is considered as 3 years.
The balance of this section outlines financial projections and financial analysis for the project.
ASSUMPTIONS:
Further the annexure 1, 2 and 3 gives the details of the assumptions and considerations for making the
cash flow of the project.
The Built Mass will have rest of all the sporting activities under the single roof as specified in the Chapter
III where the detailed areas of all the sports activities have been specified.
The Built Mass will have rest of all the sporting activities under the single roof as specified in the Chapter
III where the detailed areas of all the sports activities have been specified.
The Built Mass will have rest of all the sporting activities under the single roof as specified in the Chapter
III where the detailed areas of all the sports activities have been specified.
OPTION IV: INDICATIVE ARCHITECT’S PERCEPTION OF THE SPORTS SCIENCE CENTER – WINGS CONCEPT
OPTION V: INDICATIVE ARCHITECT’S PERCEPTION OF THE SPORTS SCIENCE CENTER – LINEAR CONCEPT
NOTE:
All the options are indicative viz. subject to availability of the land parcel the detailed master plan
with the floor plans will be prepared. The first 4 options are renditions on 5 Acre plot with the
indicative area allocation with modelling the Built Mass Perception of the Integrated Sports Complex
and rest 2 options are web based indicative renditions to represent the planning / designing
possibilities, especially considering the impact of the cost of construction of swimming pool over the
terrace.