SPLICING REQUIREMENT OF REINFORCING BARS "Ls" or "Ld"

NOTE : BEAMS COLUMNS FLOOR SLABS NOTE :

REMOVAL OF FORMS & SHORINGS CAMBER REQUIREMENT


CLEAR SPAN MINIMUM TIME PERIOD
STRUCTURAL ELEMENTS BETWEEN SUPPORTS (DAYS) ELEMENT MINIMUM CAMBER

DETAILED SECTION TYP. BEAM PENETRATION DETAIL

NOTE :

INTERIOR COLUMN TYP. PLAN OF BEAM / BEAM DET. FOR


TERMINATION BEND GIRDER COL. JOINT T & B DEPRESSION TYP. SLAB DEPRESSION DET.

BEAM RE-BAR CORNER / EXTERIOR COL.


TERMINATION BEND TYPICAL BEAM & GIRDER RE-BAR LAYOUT TERMINATION BEND

STANDARD DETAILS

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD
NELSON S. ANTONIO DOMICIANO B. LUSICA 13
STRUCTURAL DESIGN STRUCTURAL DESIGN
STANDARD TWO-STOREY STANDARD DETAILS S-2
PROJECT MANAGER GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON
POSITION: STRUCTURAL ENGINEER POSITION: STRUCTURAL ENGINEER SCHOOL BUILDING 25
PRC No.: 32516 TIN No.: 107-915-002 PRC No.: 14234 TIN No.: 178-384-258 OIC, BUILDING DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 8-CLASSROOM )