Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

KEYPLAN
N

This drawing and any information or descriptive matter set out hereon is licensed
A

QI BLA

0 1 2 3 4 5 10

N
to the Qatar Railways Company and is confidential and subject to copyright. B

It must not be disclosed, loaned, copied or used for manufacturing, tendering or

A
SCALE 1:100 METER

QUIBL
C

for any other purpose without written permission. © Qatar Railways Company.
D

16 17 18 19 20
1. Provide set out dimensions for equiptments.
FCU, CRAC
A CRAC locations it should be as per reference
sent to you. and pipe sizes.
NOTES
1. All pipework shall be installed around piers and other obstructions and minor modifications
shall be made as per site difficulties and conditions.
2. Equiptment name Taggings & Numberings 2. All pipework to be adequately supported. All support installations shall be as per
are missing. manufacturer recommendation and QCS 2010.
3. Vertical rising pipes shall be supported at the base and the support shall withstand the
total weight of the pipe and fluid contained.
3. Provide flow rates on branches to 4. All chilled water pipework services shall be supported around the insulation and not directly
1.3.28a equiptments and atleast 2 or 3 locations for around the pipework.
1.3.34 1.3.32 DRAUGHT RELIEF 3 main pipes, Flow rates should be as per latest 5. Anti-vibration supports shall be fitted at all locations where pipework vibration is likely to be a
1.3.56 problem.
ø20 CHWR
UPS/ BATTERY 2 SPS MV/LV MAIN ROOM 2 schematics.
T.B.D.1 BOP +5520 6. Pipes shall not be enclosed in a common insulating covering.
7. All open ends shall be capped with the appropriate pipework fittings.
4. Rather than BoP we should also provide set Wooden plugs and the like shall not be used.
8. Valves fitted in the ends of pipe work shall not be accepted as a means of preventing
ø20 CHWR ø65 CHWF ø50 CHWR
points dimensions from center of pipe to wall. the ingress of foreign materials.
BOP +4780 ø20 CHWF ø20 CHWR BOP +3930 BOP +3930 applicable only for main pipes and main sub 9. Crac units and Fan coil units dimensions are only indicative.
BOP +3880 BOP +3880
ø20 CHWF branches. 10. Pipe work shall be installed so as to give the following minimum
FOR CONTINUATION REFER TO DRAWING No:M008-RGP-MEC-DWG-GWST050-CL-10002
BOP +5520 ø50 CHWR ø65 CHWF ø150 CHWR ø50 CHWR clearances between adjacent services as follows:
BOP +4230 BOP +4230 BOP +3540 BOP +4230 · walls 25 mm
ø20 CHWF 5. Pipes should be annotated with F/A, T/B · ceilings 50 mm
BOP +4780 where applicable. · adjacent pipes both insulated 25 mm
· insulated pipes to adjacent conduit or trunking 100mm
· adjacent electrical cables not in conduit or trunkig 150mm
1.3.37 The clearance between pipeworks / services shall comply to QCS 2010,
ø150 CHWF ø150 CHWR Section 22 - 05-5.3.1.3 which is based on the pipework Outer Diameter and
MEP CORRIDOR 3

2310
BOP +3450 BOP +3450 the thickness of the Insulation with its support clearance.

1930
ø65 CHWF 11. High level services should not be installed any lower than 3000mm AFFL.
BOP +4230 12. AAV shall be installed at all high points in supply and return piping

ø32 CHWF
B REFERENCES:
3 BOP +5050 M008-ARE-ARC-MD3-GWST050-CL-00101.S4.P7
ø125 CHWF ø125 CHWR ø100 CHWR ø100 CHWF
CB BOP +3450 BOP +3450 BOP +3450 BOP +3450 ø32 CHWR M008-ARE-ARC-MD3-GWST050-ZZ-00101.S4.P11
ø20 CHWF ø20 CHWR BOP +5050 M008-HLQ-MEP-MD3-GWST050-CL-00101.RVT
ø20 CHWF ø32 CHWF ø32 CHWR
Typ. BOP +5250 BOP +5250 AHU 06 770 1.3.29a
BOP +5250 BOP +5260 BOP +5260 M008-SSF-ARC-MD3-GWST050-CL-00301.S3.P16
960 IMPULSE DAMPER 3 M008-SSF-ARC-MD3-GWST050-ZZ-00101.S3.P19
ø150 CHWF 2 Typ.
ø20 CHWF ø20 CHWR add typical detail for FCU valve arrangements M008-SSF-STR-MD3-GWST050-CL-00301.S3.P14
BOP +6200
ø20 CHWF ø20 CHWR BOP +5770 BOP +5760 CA it should be as per Dwg.no. M008-SSF-STR-MD3-GWST050-ZZ-00101.S3.P24
ø150 CHWR BOP +4290 ø20 CHWR ø20 CHWF 1.3.36 BOP +5250
M008-RGP-MEC-DWG-GWST050-AA-10042 SCHEMATICS AND DETAIL INSTALLATION REFERENCES :
BOP +6200 ø150 CHWR BOP +4290 BOP +3890 HVAC 2
BOP +6200 ø20 DX 1.3.50 installation details M008-HLQ-MEC-DWG-GWST050-AA-10001
BOP +4850 ø20 CHWR ø20 CHWF UPE/ OTE 2 M008-HLQ-MEC-DWG-GWST050-AA-10002
ø150 CHWF ø20 CHWR ø20 CHWF BOP +5620 BOP +5520
BOP +6200 BOP +6000 BOP +6000 ø32 CHWF ø32 CHWR 1.3.29b M008-RGP-MEC-DWG-GWST050-AA-10041-42-46
ø20 CHWR ø20 CHWF BOP +6000 BOP +6000 M008-HLQ-MEC-DWG-6WAANNN-AA-20001
BOP +6000 BOP +6000 IMPULSE DAMPER 4
M008-HLQ-MEC-DWG-6WAANNN-AA-20002
ø150 CHWF
BOP +3770
C
ø150 CHWR ø50 CHWF ø40 CHWF ø32 CHWF ø32 CHWR ø20 CHWR
BOP +4900 BOP +4150 BOP +4150 ø40 CHWR BOP +4150 BOP +4150 BOP +4150
ø32 CHWR BOP +4150 1.3.38
ø150 CHWR BOP +3820 MEP CORRIDOR 4
BOP +3770 ø20 CHWF
BOP +4150
ISSUED FOR CONSTRUCTION
C2
ø25 CHWF ø20 CHWF MH 30-12-2017 JF 30-12-2017 IM 30-12-2017
BOP +5100 BOP +3830
ø20 CHWR ISSUED FOR CONSTRUCTION APPROVAL
ø50 CHWR ø25 CHWR ø25 CHWR
BOP +3830
C1
ø25 CHWF BOP +4150 BOP +3770 BOP +5100 NN 13-11-2016 IM 13-11-2016 MN 13-11-2016
Typ.
ø25 CHWR BOP +3820 ø25 CHWF SCALES@A1 ISSUING OFFICE PROJECT NUMBER
BOP +3830 BOP +3770 ø32 CHWF
BOP +3820 ø20 CHWS ø150 CHWR
BOP +4690 ø150 CHWF BOP +3400
1.3.31 BOP +3400 1.3.30 1.3.28b 1:100 DOHA M008
AHU TCP 2 2020 MCR 3/4 DRAUGHT RELIEF 4
ø25 CHWR 1.3.25
BOP +3830
TELECOM POLICE 2370
ø25 CHWF
1.3.26 ø20 DX CLIENT APPROVAL
1.3.23
BOP +3830 BOP +4790
TELECOM THIRD PARTIES TELECOM QAF
A - APPROVED

B - APPROVED WITH COMMENTS

D C - DO NOT USE

STATUS PURPOSE OF ISSUE

SHOP DRAWINGS STATION - AL RAYYAN / AL QADEEM CONCOURSE LEVEL CHILLED S4 FOR CONSTRUCTION APPROVAL
WATER SERVICES (STATION EAST)
SCALE : 1:100 CONTRACTOR
19 B PORR - SBG - HBK JOINT VENTURE
CHILLED WATER PIPE - SUPPORT SPACING SCHEDULE
P.O. BOX 207471 DOHA
QATAR
S.NO. NOMINAL EXT. PIPE INT. PIPE SUPPORT THREADED
LEGENDS AND ABBREVIATION ABBREVIATION DESCRIPTION DIA. DIA. THICKNESS DIA. SPACING ROD SIZE
(DN) (DE) (DI) HORIZONTAL VERTICAL
SYMBOLS DESCRIPTION CHWF COOLING WATER FLOW INCH MM MM MM MM M M MM CONSULTANT:
FAN COIL UNIT CHWR COOLING WATER RETURN 1 3/4" 20 26.7 2.9 20.9 2.0 3.0 M08 HOARE LEA QATAR LLC
A
SECTION CUTTING LINE BOP BOTTOM OF PIPE 2 P.O. BOX 201834 DOHA

−−
1" 25 33.4 3.4 26.6 2.4 3.0 M08
QATAR
CHILLED WATER SUPPLY PIPE DN PIPE OFFSET DOWN 3 1 1/4" 32 42.1 3.5 35.1 2.4 3.0 M08
SUB CONTRACTOR
CHILLED WATER RETURN PIPE UP PIPE OFFSET UP 4 1 1/2" 40 48.2 3.68 40.8 2.7 3.6 M08
960 PSC S.P.A. Redco International W.L.L.
ø32 CHWR 5 2" 50 60.3 3.9 52.5 3.0 3.6 M10 Viale Schiavonetti TEL: 444-15426
BOP +5050 770 FLOW DIRECTION T/A TO ABOVE 270/E - 00173 ROMA FAX: 444-13786
ø32 CHWF TEL:06/72630488 Email: redcoqatar@gmail.com
BOP +5050 TEE UP F/A FROM ABOVE 6 2 1/2" 65 73.0 5.1 62.8 3.3 4.5 M10 FAX:06/72671393 DOHA, QATAR
7 3" 80 88.9 5.5 77.9 3.7 4.5 M10 Website: www.gruppopsc.com
PIPE REDUCER T/B TO BELOW QATAR - ITALY
8 4" 100 114.3 6.0 102.3 3.7 4.6 M10
ø150 CHWR ELBOW UP F/B FROM BELOW PROJECT
BOP +3540
ø150 CHWF 9 5" 125 114.3 6.5 141.3 3.7 5.0 M10
BOP +3400
ø150 CHWR
ø150 CHWF
BOP +3540 830
ELBOW DOWN FCU FAN COIL UNIT
10 6" 150 168.3 7.1 154.1 4.5 5.4 M10
DESIGN & BUILD PACKAGE 2
BOP +3400 PIPE RISER TYP TYPICAL
ELBOW 90° mm MILLIMETER
11 8" 200 219.1 8.2 202.7 5.0 6.0 M10 GREEN LINE UNDERGROUND
2030 570 12 10" 250 273.0 9.3 254.4 5.0 6.0 M12
ø150 CHWR ISOLATION VALVE FFL FINISH FLOOR LEVEL TITLE
2380 BOP +3450 13 12" 300 323.8 10.3 303.2 6.1 10.0 M12
ø150 CHWF PIPE SUPPORT IV ISOLATION VALVE
BOP +3450 NOTE:
PIPE WITH INSULATION TP TEST POINT 1.) CHILLED WATER PIPE MATERIAL SHALL BE ERW BLACK STEEL PIPE SCH40.
2.) THE CHILLED WATER PIPE SHALL BE WITH THREADED FITTING UPTO 50mm AND
SHOP DRAWINGS STATION - AL RAYYAN
VP VALVE PACKAGE DC DRAIN COCK FROM
65mm THE FITTINGS SHALL BE WITH GROOVED COUPLING.
/ AL QADEEM CONCOURSE LEVEL -
STR STRAINER 3.) THE INSULATION FOR CHILLED WATER PIPING SHALL BE 19MM THICKNESS UPTO
100MM DIAMETER (PIPE / TUBE INSULATION) AND 25MM THICKNESS ABOVE 100MM
CHILLED WATER SERVICES (STATION
DIAMETER (SHEET INSULATION).
4.) FOR THE CHANGE OF DIRECTION AND LEVELS, APPLICATION OF CONCENTRATED
EAST)
LOADS, JOINTS POINTS, FITTINGS AND VALVES EXTRA SUPPORT SHALL BE PROVIDED
AS PER THE SITE CONDITION.
Notes should be numbered in 5.) THREADED ROD SHALL BE HOT DIPPED GALVANIZED IRON. CLIENT
CONCOURSE LEVEL
CONCOURSE LEVEL succession continously 6.) ALL THE SUPPORTS SHALL BE GALVANISED SUPPORTS
-3550 -3550 QATAR RAILWAYS COMPANY
CHILLED WATER PIPE INSULATION SCHEDULE P.O. BOX 29988 DOHA
S.NO. PIPE SIZE
IN mm
INSULATION THICKNESS

INTERNAL EXTERNAL
TYPE QATAR
1. 6mm to DRAWING NUMBER REV
SECTION-CA SECTION-CB 100mm 25 mm 25 mm TUBE

SCALE : 1:50 SCALE : 1:50


2. 125mm to
600mm 40 mm 40 mm SHEET M008-RGP-MEC-DWG-GWST050-CL-10001 C2
© QATAR RAILWAYS COMPANY
2/24/2018 6:14:47 PM
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
KEYPLAN
N

This drawing and any information or descriptive matter set out hereon is licensed
A

QI BLA

0 1 2 3 4 5 10

N
to the Qatar Railways Company and is confidential and subject to copyright. B

It must not be disclosed, loaned, copied or used for manufacturing, tendering or

A
SCALE 1:100 METER

QUIBL
C

for any other purpose without written permission. © Qatar Railways Company.
D

12 13 14 15 16 NOTES
1. Provide set out dimensions for equiptments. 1. All pipework shall be installed around piers and other obstructions and minor modifications
FCU, CRAC shall be made as per site difficulties and conditions.
2. All pipework to be adequately supported. All support installations shall be as per
CRAC locations it should be as per reference
A sent to you. and pipe sizes. 3.
manufacturer recommendation and QCS 2010.
Vertical rising pipes shall be supported at the base and the support shall withstand the
total weight of the pipe and fluid contained.
4. All chilled water pipework services shall be supported around the insulation and not directly
2. Equiptment name taggings & numberings around the pipework.
1.2.5b
ø20 CHWR ø20 CHWF are missing. 5. Anti-vibration supports shall be fitted at all locations where pipework vibration is likely to be a
STAFF LOCKER-M
ø20 CHWS BOP +4730 BOP +4730 problem.
ø20 CHWR
BOP +4740 3. Provide flow rates on branches to 6. Pipes shall not be enclosed in a common insulating covering.
BOP +4300 1.3.54 1.3.55 7. All open ends shall be capped with the appropriate pipework fittings.
ø20 DX GAS BOTTLES 2 equiptments and atleast 2 or 3 locations for
BOP +4850 1.2.5a ELECTRICAL ROOM 1 Wooden plugs and the like shall not be used.
1.1.03d STAFF ROOM-M main pipes, Flow rates should be as per latest 8. Valves fitted in the ends of pipe work shall not be accepted as a means of preventing
1.1.03b 1.1.03c ø20 CHWF 1.3.6 schematics. the ingress of foreign materials.
Female Prayer Room Ablution room women Public toilets women BOP +4260 ø20 CHWR 9. Crac units and Fan coil units dimensions are only indicative.
BOP +3830
UPS/ BATTERY 1 10. Pipe work shall be installed so as to give the following minimum
ø20 CHWF ø20 CHWF 4. Rather than BoP we should also provide set clearances between adjacent services as follows:
BOP +5070 1.2.4
BOP +3730 points dimensions from center of pipe to wall. · walls 25 mm
ø20 CHWR STAFF REST ROOM-M ø20 DX · ceilings 50 mm
ø25 CHWF
ø20 CHWR ø20 CHWF applicable only for main pipes and main sub
BOP +5070 1.1.03e BOP +4240 BOP +4750 · adjacent pipes both insulated 25 mm
BOP +4730 BOP +4730 branches.
FOR CONTINUATION REFER TO DRAWING No:M008-RGP-MEC-DWG-GWST050-CL-10003

ø25 CHWR · insulated pipes to adjacent conduit or trunking 100mm


Female Disabled Toilet ø32 CHWR

FOR CONTINUATION REFER TO DRAWING No:M008-RGP-MEC-DWG-GWST050-CL-10001


1.1.03a ø40 CHWR ø40 CHWF · adjacent electrical cables not in conduit or trunkig 150mm
ø25 CHWR ø32 CHWR BOP +4650 BOP +4240 BOP +4450 BOP +4450
Airlock women ø20 CHWR BOP +4650 5. Pipes should be annotated with F/A, T/B The clearance between pipeworks / services shall comply to QCS 2010,
BOP +4650 BOP +4650 ø20 CHWS Section 22 - 05-5.3.1.3 which is based on the pipework Outer Diameter and
BOP +4640 where applicable. the thickness of the Insulation with its support clearance.
11. High level services should not be installed any lower than 3000mm AFFL.
12. AAV shall be installed at all high points in supply and return piping
1.2.16
BOH CORRIDOR 2 ø20 CHWR REFERENCES:
ø20 CHWR ø20 CHWF BOP +4250
ø20 CHWF ø25 CHWF BOP +4940 ø32 CHWF ø40 CHWR ø40 CHWF M008-ARE-ARC-MD3-GWST050-CL-00101.S4.P7
ø20 CHWF ø20 CHWR BOP +4650 BOP +4650 BOP +4940 BOP +4650 BOP +4650
BOP +5400 BOP +5400 BOP +4650 M008-ARE-ARC-MD3-GWST050-ZZ-00101.S4.P11
APPLY SAME COMMENTS ON NOTES NUMBERING M008-HLQ-MEP-MD3-GWST050-CL-00101.RVT
3 ø32 CHWF
ø20 CHWF B M008-SSF-ARC-MD3-GWST050-CL-00301.S3.P16
BOP +4340 M008-SSF-ARC-MD3-GWST050-ZZ-00101.S3.P19
CD BOP +4650 M008-SSF-STR-MD3-GWST050-CL-00301.S3.P14
LFT 2 SFT 2
1.2.6a ø20 CHWR ø20 CHWR 1.EE2 COMBINED MEP SHAFT 2 M008-SSF-STR-MD3-GWST050-ZZ-00101.S3.P24
CELL 1 1.2.8 EE LIFT 2
CLEANER
BOP +4940
1.2.9
BOP +4340 EMERGENCY EXIT LOBBY 2 SCHEMATICS AND DETAIL INSTALLATION REFERENCES :
ø20 CHWF M008-HLQ-MEC-DWG-GWST050-AA-10001
1.2.7 BOP +4940 GARBAGE ROOM
POLICE/QAF M008-HLQ-MEC-DWG-GWST050-AA-10002
SFT 4 M008-RGP-MEC-DWG-GWST050-AA-10041-42-46
ø20 CHWS M008-HLQ-MEC-DWG-6WAANNN-AA-20001
BOP +4250 ø20 CHWR
ELECTRICAL & PRES/TION SHAFT 2
ø20 CHWR BOP +4090 M008-HLQ-MEC-DWG-6WAANNN-AA-20002
BOP +4090 STR2
1.2.10 EMERGENCY EXIT 2
1.2.11 SFT 8 ø20 CHWS
1.2.6b FIRST AID ROOM
T.B.D.2 SHAFT 1 BOP +90
CELL 2 ø20 DX
ø20 CHWF
BOP +4090 ø20 CHWF BOP +190 ø150 CHWF
BOP +4090 BOP +3770
C
ø150 CHWF ø125 CHWF ø150 CHWR ø20 CHWR
BOP +6150 BOP +5170 BOP +6150 ø150 CHWF ø150 CHWR ø150 CHWF BOP +4350 ISSUED FOR CONSTRUCTION
ø150 CHWF BOP +4660 ø150 CHWR ø150 CHWF ø20 CHWF ø150 CHWF ø150 CHWF ø150 CHWR C2
BOP +4660 BOP +4680 1.2.17 BOP +4680 BOP +4660 BOP +4300 BOP +4680 BOP +4680 BOP +4680
BOP +5670 MH 30-12-2017 JF 30-12-2017 IM 30-12-2017
BOH CORRIDOR 3 ø150 CHWR
ISSUED FOR CONSTRUCTION APPROVAL
BOP +3770 C1
NN 13-11-2016 IM 13-11-2016 MN 13-11-2016

ø40 CHWR ø40 CHWF


SCALES@A1 ISSUING OFFICE PROJECT NUMBER
ø20 CHWR BOP +4050 BOP +4050
1.1.04a ø20 CHWR 1.1.04e ø150 CHWR ø20 CHWR BOP +4050
Airlock men BOP +4050 Male Disabled Toilet ø20 CHWF
BOP +4030
BOP +4680 BOP +4050
ø20 CHWF
1:100 DOHA M008
ø20 CHWR ø20 CHWR BOP +4050
ø20 CHWF ø20 CHWF BOP +4030 BOP +4050
BOP +5080
1.2.12 1.3.17
BOP +3930
STAFF REST ROOM-F WASTE ROOM 2 CLIENT APPROVAL
1.1.04d ø20 CHWF
ø20 DX 1.1.04c BOP +4050 ø20 CHWF
1.1.04b BOP +5180 Public toilets men ø20 CHWF 2 1.2.13a add typical detail for FCU valve arrangements A - APPROVED
Male Prayer Room Ablution room men ø20 DX
BOP +4710 1.3.27
BOP +4400 CC STAFF ROOM-F TEL/IT MAIN ROOM 1 it should be as per Dwg.no.
BOP +4790
ø20 CHWF ø20 DX ø20 CHWR 1.3.57 1.3.58 M008-RGP-MEC-DWG-GWST050-AA-10042 B - APPROVED WITH COMMENTS
BOP +5080 BOP +4430 BOP +4600 ELECTRICAL ROOM 2 GAS BOTTLES 3 installation details
ø20 CHWS 1.2.13b ø20 CHWS
ø20 CHWR
BOP +4330 STAFF LOCKERS-F BOP +4690
BOP +4750 C - DO NOT USE

STATUS PURPOSE OF ISSUE


D
S4 FOR CONSTRUCTION APPROVAL
CONTRACTOR

SHOP DRAWINGS STATION - AL RAYYAN / AL QADEEM CONCOURSE LEVEL PORR - SBG - HBK JOINT VENTURE
CHILLED WATER SERVICES (STATION CENTRAL EAST) P.O. BOX 207471 DOHA
ROOF LEVEL ROOF LEVEL SCALE : 1:100 CHILLED WATER PIPE - SUPPORT SPACING SCHEDULE QATAR
4340 4340
S.NO. NOMINAL EXT. PIPE INT. PIPE SUPPORT THREADED
LEGENDS AND ABBREVIATION ABBREVIATION DESCRIPTION DIA. DIA. THICKNESS DIA. SPACING ROD SIZE CONSULTANT:
(DN) (DE) (DI) HORIZONTAL VERTICAL
SYMBOLS DESCRIPTION CHWF COOLING WATER FLOW INCH MM MM MM MM M M MM
HOARE LEA QATAR LLC
FAN COIL UNIT CHWR COOLING WATER RETURN 1 3/4" 20 26.7 2.9 20.9 2.0 3.0 M08 P.O. BOX 201834 DOHA
A
SECTION CUTTING LINE BOP BOTTOM OF PIPE 2
QATAR

−−
1" 25 33.4 3.4 26.6 2.4 3.0 M08
CHILLED WATER SUPPLY PIPE DN PIPE OFFSET DOWN 42.1 3.5 35.1 2.4 3.0 M08 SUB CONTRACTOR
ø150 CHWR
3 1 1/4" 32
PSC S.P.A. Redco International W.L.L.
BOP +4680 CHILLED WATER RETURN PIPE UP PIPE OFFSET UP 4 1 1/2" Viale Schiavonetti TEL: 444-15426
40 48.2 3.68 40.8 2.7 3.6 M08 270/E - 00173 ROMA
ø150 CHWF FAX: 444-13786
BOP +4660 FLOW DIRECTION T/A TO ABOVE 5 2" 50 60.3 3.9 52.5 3.0 3.6 M10 TEL:06/72630488 Email: redcoqatar@gmail.com
FAX:06/72671393 DOHA, QATAR
6 2 1/2" 65 73.0 5.1 62.8 3.3 4.5 M10 Website: www.gruppopsc.com
TEE UP F/A FROM ABOVE QATAR - ITALY
7 3" 80 88.9 5.5 77.9 3.7 4.5 M10
PIPE REDUCER T/B TO BELOW PROJECT
8 4" 100 114.3 6.0 102.3 3.7 4.6 M10
ø25 CHWF
BOP +4650
ELBOW UP
ELBOW DOWN
F/B
FCU
FROM BELOW
FAN COIL UNIT
9 5" 125 114.3 6.5 141.3 3.7 5.0 M10 DESIGN & BUILD PACKAGE 2
ø150 CHWR
BOP +4240 ø25 CHWR
BOP +4650 PIPE RISER TYP TYPICAL
10 6" 150 168.3 7.1 154.1 4.5 5.4 M10 GREEN LINE UNDERGROUND
11 8" 200 219.1 8.2 202.7 5.0 6.0 M10
ELBOW 90° mm MILLIMETER TITLE
ø150 CHWF 12 10" 250 273.0 9.3 254.4 5.0 6.0 M12
BOP +4240 ISOLATION VALVE FFL FINISH FLOOR LEVEL
13 12" 300 323.8 10.3 303.2 6.1 10.0 M12
ø125 CHWR
BOP +3830
PIPE SUPPORT IV ISOLATION VALVE
NOTE: SHOP DRAWINGS STATION - AL RAYYAN
ø125 CHWF 1.) CHILLED WATER PIPE MATERIAL SHALL BE ERW BLACK STEEL PIPE SCH40.
BOP +3830
PIPE WITH INSULATION TP TEST POINT
2.) THE CHILLED WATER PIPE SHALL BE WITH THREADED FITTING UPTO 50mm AND / AL QADEEM CONCOURSE LEVEL -
VP VALVE PACKAGE DC DRAIN COCK FROM
65mm THE FITTINGS SHALL BE WITH GROOVED COUPLING. CHILLED WATER SERVICES (STATION
STR STRAINER 3.) THE INSULATION FOR CHILLED WATER PIPING SHALL BE 19MM THICKNESS UPTO
100MM DIAMETER (PIPE / TUBE INSULATION) AND 25MM THICKNESS ABOVE 100MM CENTRAL EAST)
DIAMETER (SHEET INSULATION).
4.) FOR THE CHANGE OF DIRECTION AND LEVELS, APPLICATION OF CONCENTRATED
LOADS, JOINTS POINTS, FITTINGS AND VALVES EXTRA SUPPORT SHALL BE PROVIDED CLIENT
AS PER THE SITE CONDITION.
5.) THREADED ROD SHALL BE HOT DIPPED GALVANIZED IRON.
CONCOURSE LEVEL CONCOURSE LEVEL
6.) ALL THE SUPPORTS SHALL BE GALVANISED SUPPORTS QATAR RAILWAYS COMPANY
-3550 -3550
CHILLED WATER PIPE INSULATION SCHEDULE
P.O. BOX 29988 DOHA
S.NO. PIPE SIZE INSULATION THICKNESS QATAR
TYPE
IN mm INTERNAL EXTERNAL DRAWING NUMBER REV
1. 6mm to
SECTION-CC SECTION-CD 100mm 25 mm 25 mm TUBE
2. 125mm to
M008-RGP-MEC-DWG-GWST050-CL-10002 C2
SCALE : 1:50 SCALE : 1:50 600mm 40 mm 40 mm SHEET
© QATAR RAILWAYS COMPANY
2/24/2018 5:49:45 PM
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
KEYPLAN
N

This drawing and any information or descriptive matter set out hereon is licensed
A

QI BLA

0 1 2 3 4 5 10

N
to the Qatar Railways Company and is confidential and subject to copyright. B

It must not be disclosed, loaned, copied or used for manufacturing, tendering or

A
SCALE 1:100 METER

QUIBL
C

for any other purpose without written permission. © Qatar Railways Company.
D

1. Provide set out dimensions for equiptments.


FCU, CRAC
CRAC locations it should be as per reference
sent to you. and pipe sizes. NOTES
1. All pipework shall be installed around piers and other obstructions and minor modifications
2. Equiptment name taggings & numberings shall be made as per site difficulties and conditions.
are missing. 2. All pipework to be adequately supported. All support installations shall be as per
manufacturer recommendation and QCS 2010.
7 8 9 10 11 3. Provide flow rates on branches to 3. Vertical rising pipes shall be supported at the base and the support shall withstand the
total weight of the pipe and fluid contained.
equiptments and atleast 2 or 3 locations for 4. All chilled water pipework services shall be supported around the insulation and not directly
main pipes, Flow rates should be as per latest around the pipework.
schematics. 5. Anti-vibration supports shall be fitted at all locations where pipework vibration is likely to be a
problem.
A 4. Rather than BoP we should also provide set
6.
7.
Pipes shall not be enclosed in a common insulating covering.
All open ends shall be capped with the appropriate pipework fittings.
points dimensions from center of pipe to wall. Wooden plugs and the like shall not be used.
applicable only for main pipes and main sub 8. Valves fitted in the ends of pipe work shall not be accepted as a means of preventing
the ingress of foreign materials.
branches. 9. Crac units and Fan coil units dimensions are only indicative.
10. Pipe work shall be installed so as to give the following minimum
5. Pipes should be annotated with F/A, T/B clearances between adjacent services as follows:
where applicable. · walls 25 mm
· ceilings 50 mm
· adjacent pipes both insulated 25 mm
· insulated pipes to adjacent conduit or trunking 100mm
ø80 CHWF · adjacent electrical cables not in conduit or trunkig 150mm
BOP +4100 The clearance between pipeworks / services shall comply to QCS 2010,
1.1.08 Section 22 - 05-5.3.1.3 which is based on the pipework Outer Diameter and
Gold Service Center the thickness of the Insulation with its support clearance.
11. High level services should not be installed any lower than 3000mm AFFL.
APPLY SAME COMMENTS ON NOTES NUMBERING 12. AAV shall be installed at all high points in supply and return piping
ø65 CHWF
BOP +5270
REFERENCES:
M008-ARE-ARC-MD3-GWST050-CL-00101.S4.P7
M008-ARE-ARC-MD3-GWST050-ZZ-00101.S4.P11
M008-HLQ-MEP-MD3-GWST050-CL-00101.RVT
FOR CONTINUATION REFER TO DRAWING No:M008-RGP-MEC-DWG-GWST050-CL-10004

FOR CONTINUATION REFER TO DRAWING No:M008-RGP-MEC-DWG-GWST050-CL-10002


3250

M008-SSF-ARC-MD3-GWST050-CL-00301.S3.P16
ø20 CHWR M008-SSF-ARC-MD3-GWST050-ZZ-00101.S3.P19
BOP +4100 M008-SSF-STR-MD3-GWST050-CL-00301.S3.P14
M008-SSF-STR-MD3-GWST050-ZZ-00101.S3.P24
SCHEMATICS AND DETAIL INSTALLATION REFERENCES :
B M008-HLQ-MEC-DWG-GWST050-AA-10001
M008-HLQ-MEC-DWG-GWST050-AA-10002
M008-RGP-MEC-DWG-GWST050-AA-10041-42-46
M008-HLQ-MEC-DWG-6WAANNN-AA-20001
1.1.01 M008-HLQ-MEC-DWG-6WAANNN-AA-20002
ø20 CHWR Unpaid Area 1
1.1.02
ø20 CHWF BOP +4420
BOP +4320 Public Area - Paid Area
ø25 CHWF
BOP +4200
1.2.09a1
TBD 1.2.09b1
TVM's Technical Room

ø20 CHWR
ISSUED FOR CONSTRUCTION
ø25 CHWR BOP +4530 ø20 CHWF C2
BOP +4200 BOP +4530 MH 30-12-2017 JF 30-12-2017 IM 30-12-2017
ISSUED FOR CONSTRUCTION APPROVAL
C1
C NN 13-11-2016 IM 13-11-2016 MN 13-11-2016

ø150 CHWF ø150 CHWF


ø150 CHWF SCALES@A1 ISSUING OFFICE PROJECT NUMBER
1810
1940

BOP +6150
BOP +6150
2320

BOP +4980

1:100 DOHA M008


ø150 CHWF CLIENT APPROVAL
BOP +6150
ø150 CHWR ø150 CHWR
ø20 CHWF ø100 CHWF
BOP +4730
BOP +4250 ø100 CHWR BOP +5400 BOP +6150 A - APPROVED
BOP +5400

B - APPROVED WITH COMMENTS


ø20 CHWF
1.2.3 BOP +4150
STATION CONTROL ROOM PROVIDE SECTION ON THIS PIPE C - DO NOT USE
2 CROSSING GOING TO UNDER
CE PASS. STATUS PURPOSE OF ISSUE
ø20 DX TYP.
BOP +4440

S4 FOR CONSTRUCTION APPROVAL


ø100 CHWF ø100 CHWR
BOP +5000 BOP +5000 CONTRACTOR
D
SHOP DRAWINGS STATION - AL RAYYAN / AL QADEEM CONCOURSE LEVEL PORR - SBG - HBK JOINT VENTURE
ROOF LEVEL
CHILLED WATER SERVICES (STATION CENTRAL WEST) P.O. BOX 207471 DOHA
SCALE : 1:100
4340 CHILLED WATER PIPE - SUPPORT SPACING SCHEDULE QATAR
S.NO. NOMINAL EXT. PIPE INT. PIPE SUPPORT THREADED
LEGENDS AND ABBREVIATION ABBREVIATION DESCRIPTION DIA. DIA. THICKNESS DIA. SPACING ROD SIZE
(DN) (DE) (DI) HORIZONTAL VERTICAL CONSULTANT:
SYMBOLS DESCRIPTION CHWF COOLING WATER FLOW INCH MM MM MM MM M M MM
HOARE LEA QATAR LLC
FAN COIL UNIT CHWR COOLING WATER RETURN 1 3/4" 20 26.7 2.9 20.9 2.0 3.0 M08 P.O. BOX 201834 DOHA
A
SECTION CUTTING LINE BOP BOTTOM OF PIPE 2 QATAR

−−
ø150 CHWR 1" 25 33.4 3.4 26.6 2.4 3.0 M08
ø150 CHWF BOP +6150 ø150 CHWR
BOP +6150 BOP +5680 CHILLED WATER SUPPLY PIPE DN PIPE OFFSET DOWN 3 1 1/4" 32 42.1 3.5 35.1 2.4 3.0 M08 SUB CONTRACTOR
ø125 CHWF PSC S.P.A. Redco International W.L.L.
BOP +5670 CHILLED WATER RETURN PIPE UP PIPE OFFSET UP 4 1 1/2" 40 48.2 3.68 40.8 2.7 3.6 M08 Viale Schiavonetti TEL: 444-15426
5 2" 50 60.3 3.9 52.5 3.0 3.6 M10 270/E - 00173 ROMA FAX: 444-13786
ø125 CHWF
FLOW DIRECTION T/A TO ABOVE TEL:06/72630488 Email: redcoqatar@gmail.com
ø125 CHWR FAX:06/72671393 DOHA, QATAR
BOP +5170 6 2 1/2" 65 73.0 5.1 62.8 3.3 4.5 M10
BOP +5170 TEE UP F/A FROM ABOVE Website: www.gruppopsc.com
QATAR - ITALY
7 3" 80 88.9 5.5 77.9 3.7 4.5 M10
PIPE REDUCER T/B TO BELOW
8 4" 100 114.3 6.0 102.3 3.7 4.6 M10 PROJECT
ELBOW UP F/B FROM BELOW
ELBOW DOWN FCU FAN COIL UNIT
9 5" 125 114.3 6.5 141.3 3.7 5.0 M10 DESIGN & BUILD PACKAGE 2
PIPE RISER TYP TYPICAL
10
11
6"
8"
150
200
168.3
219.1
7.1
8.2
154.1
202.7
4.5
5.0
5.4
6.0
M10
M10
GREEN LINE UNDERGROUND
ELBOW 90° mm MILLIMETER
12 10" 250 273.0 9.3 254.4 5.0 6.0 M12 TITLE
ISOLATION VALVE FFL FINISH FLOOR LEVEL
13 12" 300 323.8 10.3 303.2 6.1 10.0 M12
PIPE SUPPORT IV ISOLATION VALVE
NOTE:
1.) CHILLED WATER PIPE MATERIAL SHALL BE ERW BLACK STEEL PIPE SCH40.
SHOP DRAWINGS STATION - AL RAYYAN
PIPE WITH INSULATION TP TEST POINT
VP VALVE PACKAGE DC DRAIN COCK
2.) THE CHILLED WATER PIPE SHALL BE WITH THREADED FITTING UPTO 50mm AND
FROM
/ AL QADEEM CONCOURSE LEVEL -
STR STRAINER
65mm THE FITTINGS SHALL BE WITH GROOVED COUPLING.
3.) THE INSULATION FOR CHILLED WATER PIPING SHALL BE 19MM THICKNESS UPTO
CHILLED WATER SERVICES (STATION
100MM DIAMETER (PIPE / TUBE INSULATION) AND 25MM THICKNESS ABOVE 100MM
DIAMETER (SHEET INSULATION).
CENTRAL WEST)
4.) FOR THE CHANGE OF DIRECTION AND LEVELS, APPLICATION OF CONCENTRATED
LOADS, JOINTS POINTS, FITTINGS AND VALVES EXTRA SUPPORT SHALL BE PROVIDED
AS PER THE SITE CONDITION. CLIENT
CONCOURSE LEVEL add typical detail for FCU valve arrangements 5.) THREADED ROD SHALL BE HOT DIPPED GALVANIZED IRON.
-3550 it should be as per Dwg.no. 6.) ALL THE SUPPORTS SHALL BE GALVANISED SUPPORTS QATAR RAILWAYS COMPANY
M008-RGP-MEC-DWG-GWST050-AA-10042
installation details CHILLED WATER PIPE INSULATION SCHEDULE P.O. BOX 29988 DOHA
S.NO. PIPE SIZE
IN mm
INSULATION THICKNESS
EXTERNAL
TYPE QATAR
INTERNAL
1. 6mm to DRAWING NUMBER REV
100mm 25 mm 25 mm TUBE
SECTION-CE
SCALE : 1:50
2. 125mm to
600mm 40 mm 40 mm SHEET M008-RGP-MEC-DWG-GWST050-CL-10003 C2
© QATAR RAILWAYS COMPANY
2/24/2018 5:53:20 PM
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
KEYPLAN
N

This drawing and any information or descriptive matter set out hereon is licensed
A

QI BLA

0 1 2 3 4 5 10

N
to the Qatar Railways Company and is confidential and subject to copyright. B

It must not be disclosed, loaned, copied or used for manufacturing, tendering or

A
SCALE 1:100 METER

QUIBL
C

for any other purpose without written permission. © Qatar Railways Company.
D

EXTEN THE VIEW


ON THIS AREA
3 4 5 6 THE CRAC
SHOW
UNIT PROPERLY
1. Provide set out dimensions for equiptments. NOTES
FCU, CRAC
A CRAC locations it should be as per reference 1. All pipework shall be installed around piers and other obstructions and minor modifications
shall be made as per site difficulties and conditions.
sent to you. and pipe sizes. 2. All pipework to be adequately supported. All support installations shall be as per
manufacturer recommendation and QCS 2010.
2. Equiptment name Taggings & Numberings 3. Vertical rising pipes shall be supported at the base and the support shall withstand the
are missing. total weight of the pipe and fluid contained.
ø20 DX 4. All chilled water pipework services shall be supported around the insulation and not directly
BOP +5650
1.3.8 around the pipework.
1.3.5 SPS MV/LV MAIN ROOM 1 3. Provide flow rates on branches to 5. Anti-vibration supports shall be fitted at all locations where pipework vibration is likely to be a
AHU TCP 1 ø20 CHWS equiptments and atleast 2 or 3 locations for problem.
BOP +5550 6. Pipes shall not be enclosed in a common insulating covering.
1.3.2a main pipes, Flow rates should be as per latest 7. All open ends shall be capped with the appropriate pipework fittings.
DRAUGHT RELIEF 1 ø80 CHWF schematics. Wooden plugs and the like shall not be used.
1.3.4 BOP +4100 8. Valves fitted in the ends of pipe work shall not be accepted as a means of preventing
TEL/IT 3 130 the ingress of foreign materials.
ø25 CHWR 1010 4. Rather than BoP we should also provide set
ø150 CHWF 9. Crac units and Fan coil units dimensions are only indicative.
BOP +5050 ø150 CHWR BOP +4650 points dimensions from center of pipe to wall. 10. Pipe work shall be installed so as to give the following minimum
ø25 CHWF
BOP +3650
ø32 CHWR BOP +4650 400 ø65 CHWF applicable only for main pipes and main sub clearances between adjacent services as follows:
640

FOR CONTINUATION REFER TO DRAWING No:M008-RGP-MEC-DWG-GWST050-CL-10003


ø25 CHWF BOP +3650 ø150 CHWF BOP +5270 branches. · walls 25 mm
ø25 CHWF ø80 CHWF
BOP +5130 ø25 CHWR BOP +3990 ø150 CHWR · ceilings 50 mm
BOP +5050 BOP +3850
BOP +5130 BOP +3990 ø80 CHWR · adjacent pipes both insulated 25 mm
BOP +3900
5. Pipes should be annotated with F/A, T/B · insulated pipes to adjacent conduit or trunking 100mm
where applicable. · adjacent electrical cables not in conduit or trunkig 150mm

3550
The clearance between pipeworks / services shall comply to QCS 2010,

3250
Section 22 - 05-5.3.1.3 which is based on the pipework Outer Diameter and
1.3.9 the thickness of the Insulation with its support clearance.
1.3.15

2290
11. High level services should not be installed any lower than 3000mm AFFL.

1930
MEP CORRIDOR 1 ELECTRICAL CLOSET 1 12. AAV shall be installed at all high points in supply and return piping
ø150 CHWR ø150 CHWF
3 BOP +3990 BOP +3990 APPLY SAME COMMENTS ON NOTES NUMBERING
REFERENCES:
CG B M008-ARE-ARC-MD3-GWST050-CL-00101.S4.P7
Typ- M008-ARE-ARC-MD3-GWST050-ZZ-00101.S4.P11
1600
M008-HLQ-MEP-MD3-GWST050-CL-00101.RVT
ø20 CHWR 1950 M008-SSF-ARC-MD3-GWST050-CL-00301.S3.P16
BOP +5390
1.3.3a M008-SSF-ARC-MD3-GWST050-ZZ-00101.S3.P19
IMPULSE DAMPER 1 ø20 CHWF M008-SSF-STR-MD3-GWST050-CL-00301.S3.P14
2810 BOP +5290 1.3.10 M008-SSF-STR-MD3-GWST050-ZZ-00101.S3.P24
1.3.49 1.3.14 STR 1 SFT 3
UPE/ OTE 1 ELECTRICAL & PRES/TION SHAFT 1 WASTE ROOM 1 ø25 CHWF SCHEMATICS AND DETAIL INSTALLATION REFERENCES :
2580 HVAC 1a EMERGENCY EXIT 1
BOP +4200
M008-HLQ-MEC-DWG-GWST050-AA-10001
M008-HLQ-MEC-DWG-GWST050-AA-10002
SFT 7 M008-RGP-MEC-DWG-GWST050-AA-10041-42-46
SFT 1 1.EE1 ø32 CHWF M008-HLQ-MEC-DWG-6WAANNN-AA-20001
ø20 CHWR ø20 CHWF
COMBINED MEP SHAFT 1 CH.W.SHAFT BOP +4450
1.3.3b BOP +4890 BOP +4890
2380 EMERGENCY EXIT LOBBY 1 M008-HLQ-MEC-DWG-6WAANNN-AA-20002
IMPULSE DAMPER 2 LFT 1 ø25 CHWR
ø150 CHWF ø32 CHWR
EE LIFT 1 BOP +4450
BOP +4200
2090 BOP +4440

C
ø100 CHWF ø125 CHWF ø150 CHWF
ø25 CHWF ø40 CHWF BOP +4050 1.2.1 ø150 CHWF
2120 ø80 CHWF BOP +4480 BOP +4980
BOP +4050 ø25 CHWR ø40 CHWR ø80 CHWR ø100 CHWR ø150 CHWR
2320

BOP +4050 BOP +4980


BOP +4050 BOP +4050 BOP +4430 BOP +4430 BOP +4050 BOH CORRIDOR 1 BOP +4440
520
Typ-
ISSUED FOR CONSTRUCTION
C2
MH 30-12-2017 JF 30-12-2017 IM 30-12-2017
ISSUED FOR CONSTRUCTION APPROVAL
ø100 CHWF ø100 CHWF ø20 CHWR
ø150 CHWR add typical detail for FCU valve arrangements C1
BOP +4990 NN 13-11-2016 IM 13-11-2016 MN 13-11-2016
2 BOP +4150 BOP +4150 260 BOP +4730 it should be as per Dwg.no.
ø100 CHWR
CF ø20 CHWF
BOP +4150 M008-RGP-MEC-DWG-GWST050-AA-10042 SCALES@A1 ISSUING OFFICE PROJECT NUMBER
ø25 CHWS ø25 CHWR BOP +5090
ø20 CHWS 660 installation details
BOP -2110 BOP +5650
BOP +5050 1.2.2
1.3.2b
1.3.13 440 1.3.52 1.3.53 400 ø80 CHWR STORAGE 1:100 DOHA M008
MCR 1/2 600 ACBS GAS BOTTLES 1 BOP +4480
DRAUGHT RELIEF 2 ø20 DX ø20 CHWR 1.3.11 ø20 CHWF
BOP +5150 BOP +5390 ø80 CHWF
HVAC 1.b BOP +4480 BOP +4990 CLIENT APPROVAL
A - APPROVED

B - APPROVED WITH COMMENTS

C - DO NOT USE
D
STATUS PURPOSE OF ISSUE

SHOP DRAWINGS STATION - AL RAYYAN / AL QADEEM CONCOURSE LEVEL S4 FOR CONSTRUCTION APPROVAL
CHILLED WATER SERVICES (STATION WEST)
C SCALE : 1:100 CONTRACTOR

PORR - SBG - HBK JOINT VENTURE


ROOF LEVEL ROOF LEVEL
4340 4340 P.O. BOX 207471 DOHA
QATAR
CHILLED WATER PIPE - SUPPORT SPACING SCHEDULE

NOMINAL EXT. PIPE INT. PIPE SUPPORT THREADED CONSULTANT:


S.NO. DIA. DIA. THICKNESS DIA. SPACING
LEGENDS AND ABBREVIATION ABBREVIATION DESCRIPTION ROD SIZE
(DN) (DE) (DI) HORIZONTAL VERTICAL
SYMBOLS DESCRIPTION HOARE LEA QATAR LLC
CHWF COOLING WATER FLOW INCH MM MM MM MM M M MM
P.O. BOX 201834 DOHA
FAN COIL UNIT CHWR COOLING WATER RETURN 1 3/4" 20 26.7 2.9 20.9 2.0 3.0 M08 QATAR
A
SECTION CUTTING LINE BOP BOTTOM OF PIPE 2 SUB CONTRACTOR

−−
ø25 CHWF 1" 25 33.4 3.4 26.6 2.4 3.0 M08
BOP +5130 PSC S.P.A. Redco International W.L.L.
CHILLED WATER SUPPLY PIPE DN PIPE OFFSET DOWN 3 1 1/4" 32 42.1 3.5 35.1 2.4 3.0 M08 Viale Schiavonetti TEL: 444-15426
270/E - 00173 ROMA FAX: 444-13786
CHILLED WATER RETURN PIPE UP PIPE OFFSET UP 4 1 1/2" 40 48.2 3.68 40.8 2.7 3.6 M08 TEL:06/72630488 Email: redcoqatar@gmail.com
ø25 CHWR
BOP +5130 5 2" 50 60.3 3.9 52.5 3.0 3.6 M10 FAX:06/72671393 DOHA, QATAR
FLOW DIRECTION T/A TO ABOVE Website: www.gruppopsc.com
2320 QATAR - ITALY
ø40 CHWR 6 2 1/2" 65 73.0 5.1 62.8 3.3 4.5 M10
2120 BOP +4050
TEE UP F/A FROM ABOVE
7 3" 80 88.9 5.5 77.9 3.7 4.5 M10 PROJECT
ø40 CHWF PIPE REDUCER T/B TO BELOW
BOP +4050
ELBOW UP F/B FROM BELOW
8 4" 100 114.3 6.0 102.3 3.7 4.6 M10 DESIGN & BUILD PACKAGE 2
ELBOW DOWN FCU FAN COIL UNIT
9
10
5"
6"
125
150
114.3
168.3
6.5
7.1
141.3
154.1
3.7
4.5
5.0
5.4
M10
M10
GREEN LINE UNDERGROUND
PIPE RISER TYP TYPICAL
11 8" 200 219.1 8.2 202.7 5.0 6.0 M10 TITLE
ELBOW 90° mm MILLIMETER
12 10" 250 273.0 9.3 254.4 5.0 6.0 M12
ISOLATION VALVE FFL FINISH FLOOR LEVEL
PIPE SUPPORT IV ISOLATION VALVE
13 12" 300 323.8 10.3 303.2 6.1 10.0 M12 SHOP DRAWINGS STATION - AL RAYYAN
NOTE:
PIPE WITH INSULATION TP TEST POINT 1.) CHILLED WATER PIPE MATERIAL SHALL BE ERW BLACK STEEL PIPE SCH40. / AL QADEEM CONCOURSE LEVEL -
2.) THE CHILLED WATER PIPE SHALL BE WITH THREADED FITTING UPTO 50mm AND
VP VALVE PACKAGE DC DRAIN COCK FROM CHILLED WATER SERVICES (STATION
65mm THE FITTINGS SHALL BE WITH GROOVED COUPLING.
STR STRAINER 3.) THE INSULATION FOR CHILLED WATER PIPING SHALL BE 19MM THICKNESS UPTO WEST)
100MM DIAMETER (PIPE / TUBE INSULATION) AND 25MM THICKNESS ABOVE 100MM
DIAMETER (SHEET INSULATION).
CONCOURSE LEVEL CONCOURSE LEVEL 4.) FOR THE CHANGE OF DIRECTION AND LEVELS, APPLICATION OF CONCENTRATED CLIENT
-3550 -3550 LOADS, JOINTS POINTS, FITTINGS AND VALVES EXTRA SUPPORT SHALL BE PROVIDED
AS PER THE SITE CONDITION.
5.) THREADED ROD SHALL BE HOT DIPPED GALVANIZED IRON. QATAR RAILWAYS COMPANY
6.) ALL THE SUPPORTS SHALL BE GALVANISED SUPPORTS
CHILLED WATER PIPE INSULATION SCHEDULE P.O. BOX 29988 DOHA
S.NO. PIPE SIZE
IN mm
INSULATION THICKNESS
TYPE
QATAR
INTERNAL EXTERNAL
1. 6mm to
DRAWING NUMBER REV
SECTION-CF SECTION-CG 100mm 25 mm 25 mm TUBE

SCALE : 1:50 SCALE : 1:50 2. 125mm to


600mm 40 mm 40 mm SHEET
M008-RGP-MEC-DWG-GWST050-CL-10004 C2
© QATAR RAILWAYS COMPANY
2/24/2018 5:55:35 PM