Particulars Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
Particulars Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
Daily Performance Report DATE OF PREPERATION: 02 June -2011 O & M by: Average Demand 15.14 MW DAY COVERED: 01 June -2011. Average Generation 15.14 MW Last Trip 28.05.2011 AT 4.10 PM
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0.0 0 0 0 24 46,881.1 3,112 86,400 70,570 81.68% 94.49% 24 0 0 0 0 47,938.5 3,127 86,400 70,900 82.06% 94.47% 24 2.5 0 0 0 25,074.9 7,271 201,360 157,752 78.34% 90.78% 23.9 0 0 0 0.1 21,794.2 7,896 201,360 165,349 82.12% 93.07% 22.5 0 0 0 0.5
Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nil Remarks:- Plant did not trip yesterday.
0.00%
100.00%
100.00%
99.58%
97.92%
0 0 Nil Alternator align in base waiting for Engine overhauling Nil 1000 Hr Maintenance carried out at 45149 ERH
0 0 Nill
0 0 Nill
1 0 Cyl. 5/A Exh. temp. sensor change time Cyl. 5/A Exhaust temp. sensor change . Nil
3 0 Cyl. 3/A, 8/A & 1/B Change PCC ball valve & old spak plug . Nil
Nil Nil
Nil Nil
1000 RH Maintenance 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried carried out at 44775 ERH out at 47074 ERH out at 24701 ERH out at 21495 ERH
500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 131.4 RHs 626.9 RHs 699.8 RHs
Nil
Nil
Nil
Nil
Nill
Nil
Nil
Nil
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
144,072
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 46,905.1 3,117 86,400 68,246 78.99% 91.23% 24 0 0 0 0 47,962.5 3,114 86,400 69,119 80.00% 92.48% 24 0 0 0 0 25,098.9 7,250 201,360 159,475 79.20% 91.65% 24 0 0 0 0 21,818.2 7,247 201,360 160,162 79.54% 92.09% 24 0 0 0 0
Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
0.00%
100.00%
100.00%
100.00%
100.00%
0 0 Nil Alternator align in base waiting for Engine overhauling Nil 1000 Hr Maintenance carried out at 45149 ERH
0 0 Nill
0 0 Nill
0 0 Nil
0 0 Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
1000 RH Maintenance 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried carried out at 44775 ERH out at 47074 ERH out at 24701 ERH out at 21495 ERH
500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 107.4 RHs 602.9 RHs 675.8 RHs
Nil
Nil
Nil
Nil
Nill
Nil
Nil
Nil
Load Shedding : Feeder-1 Loadshed 13 minutes due to MTC. Remarks:- Plant did not trip yesterday.
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
166,032
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 46,928.1 3,168 86,400 63,911 73.97% 87.71% 23 1 0 0 0 47,986.5 3,165 86,400 70,304 81.37% 92.55% 24 0 0 0 0 25,122.9 7,241 201,360 158,910 78.92% 91.44% 24 0 0 0 0 21,842.2 7,356 201,360 159,608 79.27% 90.41% 24 0 0 0 0
Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
0.00%
100.00%
100.00%
100.00%
100.00%
0 0 Nil Alternator align in base waiting for Engine overhauling 1000 RH maint. Completed 1000 Hr Maintenance carried out at 45149 ERH
0 0 Nill
0 0 Nill
0 0 Nil
0 0 Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
1000 RH Maintenance 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried carried out at 44775 ERH out at 47074 ERH out at 24701 ERH out at 21495 ERH
500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 83.4 RHs 578.9 RHs 651.8 RHs
Nil
Nil
Nil
Nil
Nill
Nil
Nil
Nil
Load Shedding : Feeder-02 Loadshed 41 minutes due to Global ad star O.H.L Work. Remarks:- Plant did not trip yesterday.
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
180,036
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 46,925.1 3,168 86,400 68,524 79.31% 90.13% 24 0 0 0 0 48,010.5 3,165 86,400 66,562 77.04% 87.63% 24 0 0 0 0 25,146.8 7,241 201,360 154,997 76.98% 89.56% 23.9 0.1 0 0 0 21,864.2 7,356 201,360 147,402 73.20% 91.08% 22 2 0 0 0
Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
0.00%
100.00%
100.00%
100.00%
100.00%
0 0 Nil Alternator align in base waiting for Engine overhauling Nil 1000 Hr Maintenance carried out at 45149 ERH
0 0 Nill
0 0 Nill
0 1 Reverse power
Nil Nil
Nil Nil
Nil Nil
1000 RH Maintenance 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried carried out at 44775 ERH out at 47074 ERH out at 24701 ERH out at 21495 ERH
500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 59.4 RHs 555 RHs 629.8 RHs
Nil
Nil
Nil
Nil
Nill
Nil
Nil
Nil
Load Shedding : Feeder-01 Loadshed 1.07 minutes due to al-mostofa O.H.L Work. Remarks:- Plant did not trip yesterday.
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
188,424
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil 46,976.1 3,168 86,400 66,827 77.35% 87.89% 24 0 0 0 0 100.00% 0 0 Nill 48,033.7 3,165 86,400 62,594 72.45% 85.25% 23.2 0.33 0 0 0.55 97.71% 0 2 cyl dev 6/A & Cyl dev 7/B 25,170.8 7,241 201,360 154,997 76.98% 89.19% 24 0 0 0 0 100.00% 0 0 Nil 21,887.7 7,356 201,360 151,550 75.26% 87.67% 23.5 0.28 0 0 0.47 98.06% 0 1 Cyl dev 1/B
Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Nil 1000 RH maint. Completed 1000 Hr Maintenance carried out at 45149 ERH
Nil Nil
Nil Nil
1000 RH Maintenance 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried carried out at 44775 ERH out at 47074 ERH out at 24701 ERH out at 21495 ERH
500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 36.2 RHs 531 RHs 606.3 RHs
Nil
Nil
Nil
Nil
Nil
Nil
Load Shedding : Feeder-02 Loadshed 05 minutes due to Engine 05 & REB 11KV braker trip . Remarks:- Plant did not trip yesterday.
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
109,008
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil 46,994.9 3,090 86,400 50,117 58.01% 86.27% 18.8 0 3.2 0 2 91.67% 3 0 Cylinder-3/A, 7/A (2) cylinder-3/A, pcc ball valve change & spark plug gap adjust 7 cyl- 7/A, change new spark plug & HT lead interchange cyl -5/A to 7/A 500 Hrs maintenance complete. Change, clean All pcc ball valve & spark plug gap adjust 48,057.7 3,100 86,400 70,687 81.81% 95.01% 24 0 0 0 0 100.00% 0 0 Nil 25,194.8 7,420 201,360 163,364 81.13% 91.74% 24 0 0 0 0 100.00% 0 0 Nil 21,911.7 7,230 201,360 158,559 78.74% 91.38% 24 0 0 0 0.00 100.00% 0 0 Nil
Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping
Un-schedule Maintenance
Nil
Nil
Nil
Nil
Schedule Maintenance
Nil
Nil
Nil
Nil
Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nil
1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 47074 ERH out at 24701 ERH out at 21495 ERH
1000 RH maintenance after 1000 RH maintenance after 507 RHs 582.3 RHs
Nil
Nil
Nil
Nil
Nil
Nil
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
106,020
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil 47,018.9 3,110 86,400 68,180 78.91% 91.35% 24 0 0 0 0 100.00% 0 0 Nil 48,081.0 3,120 86,400 69,361 80.28% 92.63% 24 0 0 0 0 100.00% 0 0 Nil 25,218.8 7,129 201,360 165,418 82.15% 96.68% 24 0 0 0 0 100.00% 0 0 Nil 21,935.7 7,080 201,360 161,450 80.18% 95.02% 24 0 0 0 0.00 100.00% 0 0 Nil
Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping
Un-schedule Maintenance
Nil
Nil
Nil
Nil
Nil
Schedule Maintenance
Nil
Nil
Nil
Nil
Nil
Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nil
1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 47074 ERH out at 24701 ERH out at 21495 ERH
1000 RH maintenance after 1000 RH maintenance after 483 RHs 558.3 RHs
Nil
Nil
Nil
Nil
Nil
Nil
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
170,352
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil Nil Nil 47,042.9 3,110 86,400 67,973 78.67% 91.07% 24 0 0 0 0 100.00% 0 0 Nil Nil Nil 48,103.9 3,120 86,400 64,168 74.27% 92.64% 22.2 0 1.8 0 0 100.00% 0 0 Nil Nil 1000RH Maintenance Complete 25,242.8 7,129 201,360 163,879 81.39% 95.78% 24 0 0 0 0 100.00% 0 0 Nil Nil Nil 21,959.7 7,080 201,360 159,275 79.10% 93.73% 24 0 0 0 0.00 100.00% 0 0 Nil Nil Nil
Today's Running Hrs Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.
1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 433.1 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 477.8 RHs 459 RHs 534..3 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
178,056
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil Nil Nil 47,065.6 3,110 86,400 61,017 70.62% 86.43% 22.7 0 0 1.3 0 100.00% 0 2 cyl dev 2/B change Pre-chamber ball valve of Cyl dev 2/B . Nil 48,127.3 3,120 86,400 64,098 74.19% 87.80% 23.4 0.6 0 Low load 0 100.00% 0 0 Nil New Gas hase pipe change in Cyl 6/A . Nil 25,266.8 7,129 201,360 158,744 78.84% 92.78% 24 0 0 0 0 100.00% 0 0 Nil Nil Nil 21,983.7 7,080 201,360 155,384 77.17% 91.45% 24 0 0 0 0.00 100.00% 0 0 Nil Nil Nil
Today's Running Hrs Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 410.4 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 454.4 RHs 435 RHs 510..3 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil
Load Shedding : Feeder-01 loadshed 0.45 minutes due to engine 01 alternator out. Remarks:- Plant did not trip yesterday.
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
143,532
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil 47,089.3 3,062 86,400 62,229 72.02% 85.75% 23.7 0 0 0 0.3 98.75% 0 2 Cyl. Dev. 6/B Replace a clean PCC ball valve, Spark plug gap adjust & Ht lead interchange between Cyl. 6/B to 9/B Nil 48,151.0 3,118 86,400 67,081 77.64% 90.78% 23.7 0 0 0 0.3 98.75% 0 1 Cyl. Dev. 6/A 25,290.8 7,369 201,360 159,652 79.29% 90.27% 24 0 0 0 0 100.00% 0 0 Nil 22,007.3 6,919 201,360 154,027 76.49% 94.33% 23.6 0.2 0 0 0.20 99.17% 0 1 Reverse power
Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.
Nil
Nil
Nil
Nil
Nil
Nil
Nil
1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 386.7 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 430.7 RHs 411.0 RHs 486.7 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
185,040
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil 47,108.2 3,065 86,400 48,750 56.42% 84.16% 18.9 4.7 0 0 0.4 98.33% 0 2 Cyl. Dev. 2/A & 6/B Cyl. 2/A & 6/B Replace a clean PCC ball valve, 2/A & 6/B Old Spark plug replace & HT lead interchange Cyl. 2/A to 3/A. Nil 48,171.8 3,069 86,400 55,232 63.93% 86.52% 20.8 3.2 0 0 0 100.00% 0 0 Nil 25,314.8 7,225 201,360 147,593 73.30% 85.12% 24 0 0 0 0 100.00% 0 0 Nil 22,031.3 6,906 201,360 142,698 70.87% 86.10% 24 0 0 0 0.00 100.00% 0 0 Nil
Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping
Un-schedule Maintenance
Nil
Nil
Nil
Nil
Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.
Nil
Nil
Nil
Nil
1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 367.8 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 409.9 RHs 387.0 RHs 462.7 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
139,284
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 47,131.2 3,084 86,400 62,472 72.31% 88.07% 23 1 0 0 0 100.00% 0 0 48,194.3 3,082 86,400 62,140 71.92% 89.61% 22.5 1.5 0 0 0 100.00% 0 0 25,338.8 6,792 201,360 147,520 73.26% 90.50% 24 0 0 0 0 100.00% 0 0 22,054.4 6,908 201,360 142,028 70.53% 89.00% 23.1 0.9 0 0 0.00 100.00% 0 0
Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.
Nil
Nil
Nil
Nil
Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 344.8 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 387.4 RHs 363.0 RHs 439.6 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
246,564
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 47,144.8 3,010 86,400 36,254 41.96% 88.56% 13.6 10.1 0 0 0.3 98.75% 2 0 48,217.4 3,020 86,400 66,683 77.18% 95.59% 23.1 0.9 0 0 0 100.00% 0 0 25,359.5 7,129 201,360 140,248 69.65% 95.04% 20.7 0 0 0 2.3 90.42% 1 0 Cyl. 2/A Dev. & HT by pass flaxible pipe leakage & start air motor problem. Cly. 2/A change pcc ball valve & HT by pass flaxible pipe leakage maintenance & start air motor survolocker valve inter change E-5 to E-4 Nil 22,078.0 7,222 201,360 158,106 78.52% 92.76% 23.6 0.4 0 0 0.00 100.00% 0 0
Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping
Nil
Nil
Nil
Un-schedule Maintenance
Nil
Nil
Nil
Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Nil
Nil
Nil
Nil
1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 331.2 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 364.3 RHs 342.3 RHs 416.6 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil
Load Shedding : Feeder-01 loadshed 10 minutes due to engine-04 trip time. Remarks:- Plant did not trip yesterday.
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
176,400
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 47,168.8 3,012 86,400 65,281 75.56% 90.31% 24 0 0 0 0 100.00% 0 0 48,241.4 3,018 86,400 67,454 78.07% 93.13% 24 0 0 0 0 100.00% 0 0 25,383.5 7,316 201,360 157,043 77.99% 89.44% 24 0 0 0 0 100.00% 0 0 22,093.8 6,911 201,360 90,615 45.00% 82.99% 15.8 6.7 0 0 1.50 93.75% 3 0 Cyl Dev. 2/B & Lub oil pressure turbocharger ASide low.
Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping
Nil
Nil
Nil
Nil
Un-schedule Maintenance
Nil
Nil
Nil
Nil
Replace a clean prechamber ball valve & Spark plug gap adjust.
Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Nil
Nil
Nil
Nil
Nil
1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 307.2 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 340.3 RHs 318.3 RHs 400.8 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil
Load Shedding : Feeder-01 open 16 minute for MTC Remarks:- Plant did not trip yesterday.
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
155,160
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 47,192.8 3,062 86,400 65,838 76.20% 89.59% 24 0 0 0 0 100.00% 0 0 48,265.4 3,059 86,400 66,826 77.34% 91.02% 24 0 0 0 0 100.00% 0 0 25,407.5 7,283 201,360 163,987 81.44% 93.82% 24 0 0 0 0 100.00% 0 0 22,098.1 4,576 201,360 0 0.00% 0.00% 4.3 15 0 0 4.70 80.42% 11 0 Reverse power, Rack load Dev. & Lub oil pressure turbocharger A-Side low. Cyl 8/A Replace a clean prechamber ball valve, Fly wheel hole clean, Gas I/P port change. Lub oil main pump side new non-return valve replace Nil
Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping
Nil
Nil
Nil
Nil
Un-schedule Maintenance
Nil
Nil
Nil
Nil
Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.
Nil
Nil
Nil
Nil
1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 283.2 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 316.3 RHs 294.3 RHs 397.4 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
76,140
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 47,216.8 3,029 86,400 67,894 78.58% 93.39% 24 0 0 0 0 100.00% 0 0 48,289.1 3,034 86,400 66,561 77.04% 92.57% 23.7 0 0 0 0.3 98.75% 1 0 25,431.5 7,289 201,360 163,493 81.19% 93.46% 24 0 0 0 0 100.00% 0 0 22,110.5 4,235 201,360 28,110 13.96% 39.75% 16.7 0 0 0 7.30 69.58% 5 0 Reverse power & Lub oil pressure turbocharger ASide low.
Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping
Nil
Nil
LT flow low
Nil
Un-schedule Maintenance
Nil
Nil
Nil
Nil
Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.
Nil
Nil
Nil
Nil
Nil
1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 259.2 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 292.6 RHs 270.3 RHs 380.7 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
84,384
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 47,240.5 3,028 86,400 65,255 75.53% 92.89% 23.2 0.8 0 0 0 100.00% 0 0 48,313.1 3,056 86,400 67,832 78.51% 92.48% 24 0 0 0 0 100.00% 0 0 25,455.5 7,028 201,360 156,111 77.53% 92.55% 24 0 0 0 0 100.00% 0 0 22,113.1 3,076 201,360 6,500 3.23% 81.27% 2.6 0 0 0 21.40 10.83% 5 0 Reverse power & Lub oil pressure turbocharger ASide low.
Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping
Nil
Nil
Nil
Nil
Un-schedule Maintenance
Nil
Nil
Nil
Nil
Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.
Nil
Nil
Nil
Nil
Nil
1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 236 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 268.6 RHs 246.3 RHs 378.1 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
111,600
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil Nil Nil 47,263.8 3,056 86,400 66,422 76.88% 93.28% 23.3 0 0 0 0.7 97.08% 1 0 Cyl. 1/A Dev. Replace a clean prechamber ball valve and spark plug gap adjust Nil 48,337.1 3,080 86,400 69,645 80.61% 94.22% 24 0 0 0 0 100.00% 0 0 Nil Nil Nil 25,479.5 7,108 201,360 168,501 83.68% 98.77% 24 0 0 0 0 100.00% 0 0 Nil Nil Nil 22,113.1 0 201,360 0 0.00% #DIV/0! 0 0 0 0 24.00 0.00% 0 0 Nil Lub oil pump check Nil
Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.
1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 212.7 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 244.6 RHs 222.3 RHs 378.1 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
71,892
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil Nil Nil 47,287.2 3,056 86,400 61,413 71.08% 85.88% 23.4 0 0 0 0.6 97.50% 4 0 over speed mec. Cyl. Dev. 2/A, 5/A . Replace a clean prechamber ball valve and 5/A Old spark plug change. Nil 48,361.0 3,080 86,400 67,032 77.58% 91.06% 23.9 0 0 0 0.16 99.33% 1 0 Rack Load/Dev. Nil Nil 25,503.5 7,108 201,360 162,286 80.59% 95.13% 24 0 0 0 0 100.00% 0 0 Nil Nil Nil 22,113.1 0 201,360 0 0.00% #DIV/0! 0 0 0 0 24.00 0.00% 0 0 Nil Lub oil pump check Nil
Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.
1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 189.3 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 221.5RHs 198.3 RHs 378.1 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
59,220
Jr . Shift Engineer
Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil Nil Nil 47,311.2 3,056 86,400 68,474 79.25% 93.36% 24 0 0 0 0 100.00% 0 0 Nil. Nil. Nil 48,385.0 3,080 86,400 69,913 80.92% 94.58% 24 0 0 0 0 100.00% 0 0 Nil. Nil Nil 25,527.5 7,108 201,360 162,286 80.59% 95.13% 24 0 0 0 0 100.00% 0 0 Nil Nil Nil 22,113.1 0 201,360 0 0.00% #DIV/0! 0 0 0 0 24.00 0.00% 0 0 Nil Lub oil pump check Nil
Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.
1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 165.3 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 197.5 RHs 174.3 RHs 378.1 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil
SUMMARY
33 kV Export
Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage
42,156