MANAGEMENT INFORMATION SYSTEM

Daily Performance Report DATE OF PREPERATION: 02 June -2011 O & M by: Average Demand 15.14 MW DAY COVERED: 01 June -2011. Average Generation 15.14 MW Last Trip 28.05.2011 AT 4.10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0.0 0 0 0 24 46,881.1 3,112 86,400 70,570 81.68% 94.49% 24 0 0 0 0 47,938.5 3,127 86,400 70,900 82.06% 94.47% 24 2.5 0 0 0 25,074.9 7,271 201,360 157,752 78.34% 90.78% 23.9 0 0 0 0.1 21,794.2 7,896 201,360 165,349 82.12% 93.07% 22.5 0 0 0 0.5

ENGINE / GENERATOR PERFORMANCE REPORT

Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nil Remarks:- Plant did not trip yesterday.

0.00%

100.00%

100.00%

99.58%

97.92%

0 0 Nil Alternator align in base waiting for Engine overhauling Nil 1000 Hr Maintenance carried out at 45149 ERH

0 0 Nill

0 0 Nill

1 0 Cyl. 5/A Exh. temp. sensor change time Cyl. 5/A Exhaust temp. sensor change . Nil

3 0 Cyl. 3/A, 8/A & 1/B Change PCC ball valve & old spak plug . Nil

Nil Nil

Nil Nil

1000 RH Maintenance 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried carried out at 44775 ERH out at 47074 ERH out at 24701 ERH out at 21495 ERH

1000 RH Maintenance after 260.2 RHs

500 RH Maintenance after 122.1 RHs

500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 131.4 RHs 626.9 RHs 699.8 RHs

Nil

Nil

Nil

Nil T.C RPM A Bank Not Show in SCADA.

Nil

Nill

Nil

Nil

Nil

SUMMARY

Total Power Production


464,571

Average Production per Hr.


19,357

33 kV Export

Total Steam Production


256.02

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

144,072

Prepared By Md. Masud Alam Maintenance Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 03 June -2011 O & M by: Average Demand 19.04 MW DAY COVERED: 02 June -2011. Average Generation 19.04 MW Last Trip 28.05.2011 AT 4.10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 46,905.1 3,117 86,400 68,246 78.99% 91.23% 24 0 0 0 0 47,962.5 3,114 86,400 69,119 80.00% 92.48% 24 0 0 0 0 25,098.9 7,250 201,360 159,475 79.20% 91.65% 24 0 0 0 0 21,818.2 7,247 201,360 160,162 79.54% 92.09% 24 0 0 0 0

ENGINE / GENERATOR PERFORMANCE REPORT

Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action

0.00%

100.00%

100.00%

100.00%

100.00%

0 0 Nil Alternator align in base waiting for Engine overhauling Nil 1000 Hr Maintenance carried out at 45149 ERH

0 0 Nill

0 0 Nill

0 0 Nil

0 0 Nil

Nil Nil

Nil Nil

Nil Nil

Nil Nil

1000 RH Maintenance 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried carried out at 44775 ERH out at 47074 ERH out at 24701 ERH out at 21495 ERH

1000 RH Maintenance after 260.2 RHs

500 RH Maintenance after 98.1 RHs

500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 107.4 RHs 602.9 RHs 675.8 RHs

Nil

Nil

Nil

Nil T.C RPM A Bank Not Show in SCADA.

Nil

Nill

Nil

Nil

Nil

Load Shedding : Feeder-1 Loadshed 13 minutes due to MTC. Remarks:- Plant did not trip yesterday.

SUMMARY

Total Power Production


457,002

Average Production per Hr.


19,042

33 kV Export

Total Steam Production


255.04

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

166,032

Prepared By Md. Masud Alam Maintenance Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 04 June -2011 O & M by: Average Demand 18.8 MW DAY COVERED: 03 June -2011. Average Generation 18.8 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 46,928.1 3,168 86,400 63,911 73.97% 87.71% 23 1 0 0 0 47,986.5 3,165 86,400 70,304 81.37% 92.55% 24 0 0 0 0 25,122.9 7,241 201,360 158,910 78.92% 91.44% 24 0 0 0 0 21,842.2 7,356 201,360 159,608 79.27% 90.41% 24 0 0 0 0

ENGINE / GENERATOR PERFORMANCE REPORT

Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action

0.00%

100.00%

100.00%

100.00%

100.00%

0 0 Nil Alternator align in base waiting for Engine overhauling 1000 RH maint. Completed 1000 Hr Maintenance carried out at 45149 ERH

0 0 Nill

0 0 Nill

0 0 Nil

0 0 Nil

Nil Nil

Nil Nil

Nil Nil

Nil Nil

1000 RH Maintenance 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried carried out at 44775 ERH out at 47074 ERH out at 24701 ERH out at 21495 ERH

500 RH Maintenance after 500 RHs

500 RH Maintenance after 75.1 RHs

500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 83.4 RHs 578.9 RHs 651.8 RHs

Nil

Nil

Nil

Nil T.C RPM A Bank Not Show in SCADA.

Nil

Nill

Nil

Nil

Nil

Load Shedding : Feeder-02 Loadshed 41 minutes due to Global ad star O.H.L Work. Remarks:- Plant did not trip yesterday.

SUMMARY

Total Power Production


452,733

Average Production per Hr.


18,864

33 kV Export

Total Steam Production


250.12

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

180,036

Prepared By G.M.Shahadat Hossain Jr. Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 05 June -2011 O & M by: Average Demand 18.8 MW DAY COVERED: 04 June -2011. Average Generation 18.8 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 46,925.1 3,168 86,400 68,524 79.31% 90.13% 24 0 0 0 0 48,010.5 3,165 86,400 66,562 77.04% 87.63% 24 0 0 0 0 25,146.8 7,241 201,360 154,997 76.98% 89.56% 23.9 0.1 0 0 0 21,864.2 7,356 201,360 147,402 73.20% 91.08% 22 2 0 0 0

ENGINE / GENERATOR PERFORMANCE REPORT

Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action

0.00%

100.00%

100.00%

100.00%

100.00%

0 0 Nil Alternator align in base waiting for Engine overhauling Nil 1000 Hr Maintenance carried out at 45149 ERH

0 0 Nill

0 0 Nill

0 1 Reverse power

0 1 Exhaust temp. before turbo A side Nil Nil

Nil Nil

Nil Nil

Nil Nil

1000 RH Maintenance 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried carried out at 44775 ERH out at 47074 ERH out at 24701 ERH out at 21495 ERH

500 RH Maintenance after 500 RHs

500 RH Maintenance after 51.1 RHs

500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 59.4 RHs 555 RHs 629.8 RHs

Nil

Nil

Nil

Nil T.C RPM A Bank Not Show in SCADA.

Nil

Nill

Nil

Nil

Nil

Load Shedding : Feeder-01 Loadshed 1.07 minutes due to al-mostofa O.H.L Work. Remarks:- Plant did not trip yesterday.

SUMMARY

Total Power Production


437,485

Average Production per Hr.


18,229

33 kV Export

Total Steam Production


245.66

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

188,424

Prepared By Md: Nazmul alam Jr. Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 06 June -2011 O & M by: Average Demand 18.8 MW DAY COVERED: 05 June -2011. Average Generation 18.8 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil 46,976.1 3,168 86,400 66,827 77.35% 87.89% 24 0 0 0 0 100.00% 0 0 Nill 48,033.7 3,165 86,400 62,594 72.45% 85.25% 23.2 0.33 0 0 0.55 97.71% 0 2 cyl dev 6/A & Cyl dev 7/B 25,170.8 7,241 201,360 154,997 76.98% 89.19% 24 0 0 0 0 100.00% 0 0 Nil 21,887.7 7,356 201,360 151,550 75.26% 87.67% 23.5 0.28 0 0 0.47 98.06% 0 1 Cyl dev 1/B

ENGINE / GENERATOR PERFORMANCE REPORT

Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action

Nil 1000 RH maint. Completed 1000 Hr Maintenance carried out at 45149 ERH

Nil Nil

cyl dev 6/A & Cyl dev 7/B Nil

Nil Nil

Cyl dev 1/B Nil

1000 RH Maintenance 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried carried out at 44775 ERH out at 47074 ERH out at 24701 ERH out at 21495 ERH

500 RH Maintenance after 500 RHs

500 RH Maintenance after 27.1 RHs

500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 36.2 RHs 531 RHs 606.3 RHs

Nil Alternator V- Phase shorted with body.

Nil

Nil

Nil T.C RPM A Bank Not Show in SCADA.

Nil

Nil

Nil

Nil

Load Shedding : Feeder-02 Loadshed 05 minutes due to Engine 05 & REB 11KV braker trip . Remarks:- Plant did not trip yesterday.

SUMMARY

Total Power Production


435,968

Average Production per Hr.


18,165

33 kV Export

Total Steam Production


241.45

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

109,008

Prepared By Md: Nazmul alam Jr. Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 07 June -2011 O & M by: Average Demand 18.45 MW DAY COVERED: 06 June -2011. Average Generation 18.45 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil 46,994.9 3,090 86,400 50,117 58.01% 86.27% 18.8 0 3.2 0 2 91.67% 3 0 Cylinder-3/A, 7/A (2) cylinder-3/A, pcc ball valve change & spark plug gap adjust 7 cyl- 7/A, change new spark plug & HT lead interchange cyl -5/A to 7/A 500 Hrs maintenance complete. Change, clean All pcc ball valve & spark plug gap adjust 48,057.7 3,100 86,400 70,687 81.81% 95.01% 24 0 0 0 0 100.00% 0 0 Nil 25,194.8 7,420 201,360 163,364 81.13% 91.74% 24 0 0 0 0 100.00% 0 0 Nil 21,911.7 7,230 201,360 158,559 78.74% 91.38% 24 0 0 0 0.00 100.00% 0 0 Nil

ENGINE / GENERATOR PERFORMANCE REPORT

Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping

Un-schedule Maintenance

Nil

Nil

Nil

Nil

Schedule Maintenance

Nil

Nil

Nil

Nil

Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nil

1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 47074 ERH out at 24701 ERH out at 21495 ERH

500 RH Maintenance after 500 RHs

1000 RH Maintenance after 481.1 RHs

500 RH maintenance over 12.2 RHs

1000 RH maintenance after 1000 RH maintenance after 507 RHs 582.3 RHs

Nil Alternator V- Phase shorted with body.

Nil

Nil

Nil T.C RPM A Bank Not Show in SCADA.

Nil

Nil

Nil

Nil

Remarks:- Plant did not trip yesterday.

SUMMARY

Total Power Production


442,727

Average Production per Hr.


18,447

33 kV Export

Total Steam Production


247.61

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

106,020

Prepared By Md: Ruhul Amin Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 08 June -2011 O & M by: Average Demand 19.35 MW DAY COVERED: 07 June -2011. Average Generation 19.35 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil 47,018.9 3,110 86,400 68,180 78.91% 91.35% 24 0 0 0 0 100.00% 0 0 Nil 48,081.0 3,120 86,400 69,361 80.28% 92.63% 24 0 0 0 0 100.00% 0 0 Nil 25,218.8 7,129 201,360 165,418 82.15% 96.68% 24 0 0 0 0 100.00% 0 0 Nil 21,935.7 7,080 201,360 161,450 80.18% 95.02% 24 0 0 0 0.00 100.00% 0 0 Nil

ENGINE / GENERATOR PERFORMANCE REPORT

Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping

Un-schedule Maintenance

Nil

Nil

Nil

Nil

Nil

Schedule Maintenance

Nil

Nil

Nil

Nil

Nil

Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nil

1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 47074 ERH out at 24701 ERH out at 21495 ERH

500 RH Maintenance after 500 RHs

1000 RH Maintenance after 457.1 RHs

500 RH maintenance over 36.2 RHs

1000 RH maintenance after 1000 RH maintenance after 483 RHs 558.3 RHs

Nil Alternator V- Phase shorted with body.

Nil

Nil

Nil T.C RPM A Bank Not Show in SCADA.

Nil

Nil

Nil

Nil

Remarks:- Plant did not trip yesterday.

SUMMARY

Total Power Production


464,409

Average Production per Hr.


19,350

33 kV Export

Total Steam Production


256.31

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

170,352

Prepared By Md: Ruhul Amin Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 09 June -2011 O & M by: Average Demand 19.0 MW DAY COVERED: 08 June -2011. Average Generation 19.0 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil Nil Nil 47,042.9 3,110 86,400 67,973 78.67% 91.07% 24 0 0 0 0 100.00% 0 0 Nil Nil Nil 48,103.9 3,120 86,400 64,168 74.27% 92.64% 22.2 0 1.8 0 0 100.00% 0 0 Nil Nil 1000RH Maintenance Complete 25,242.8 7,129 201,360 163,879 81.39% 95.78% 24 0 0 0 0 100.00% 0 0 Nil Nil Nil 21,959.7 7,080 201,360 159,275 79.10% 93.73% 24 0 0 0 0.00 100.00% 0 0 Nil Nil Nil

ENGINE / GENERATOR PERFORMANCE REPORT

Today's Running Hrs Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.

1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 433.1 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 477.8 RHs 459 RHs 534..3 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil

SUMMARY

Total Power Production


455,295

Average Production per Hr.


18,971

33 kV Export

Total Steam Production


254.98

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

178,056

Prepared By Md: Nazmul Alam Jr. Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 10 June -2011 O & M by: Average Demand 18.3 MW DAY COVERED: 09 June -2011. Average Generation 18.5 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil Nil Nil 47,065.6 3,110 86,400 61,017 70.62% 86.43% 22.7 0 0 1.3 0 100.00% 0 2 cyl dev 2/B change Pre-chamber ball valve of Cyl dev 2/B . Nil 48,127.3 3,120 86,400 64,098 74.19% 87.80% 23.4 0.6 0 Low load 0 100.00% 0 0 Nil New Gas hase pipe change in Cyl 6/A . Nil 25,266.8 7,129 201,360 158,744 78.84% 92.78% 24 0 0 0 0 100.00% 0 0 Nil Nil Nil 21,983.7 7,080 201,360 155,384 77.17% 91.45% 24 0 0 0 0.00 100.00% 0 0 Nil Nil Nil

ENGINE / GENERATOR PERFORMANCE REPORT

Today's Running Hrs Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action

1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 410.4 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 454.4 RHs 435 RHs 510..3 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil

Load Shedding : Feeder-01 loadshed 0.45 minutes due to engine 01 alternator out. Remarks:- Plant did not trip yesterday.

SUMMARY

Total Power Production


439,243

Average Production per Hr.


18,302

33 kV Export

Total Steam Production


230.68

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

143,532

Prepared By Md: Nazmul Alam Jr. Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 11 June -2011 O & M by: Average Demand 18.5 MW DAY COVERED: 10 June -2011. Average Generation 18.5 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil 47,089.3 3,062 86,400 62,229 72.02% 85.75% 23.7 0 0 0 0.3 98.75% 0 2 Cyl. Dev. 6/B Replace a clean PCC ball valve, Spark plug gap adjust & Ht lead interchange between Cyl. 6/B to 9/B Nil 48,151.0 3,118 86,400 67,081 77.64% 90.78% 23.7 0 0 0 0.3 98.75% 0 1 Cyl. Dev. 6/A 25,290.8 7,369 201,360 159,652 79.29% 90.27% 24 0 0 0 0 100.00% 0 0 Nil 22,007.3 6,919 201,360 154,027 76.49% 94.33% 23.6 0.2 0 0 0.20 99.17% 0 1 Reverse power

ENGINE / GENERATOR PERFORMANCE REPORT

Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.

Nil

Replace a clean PCC ball Valve

Nil

Nil

Nil

Nil

Nil

Nil

1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 386.7 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 430.7 RHs 411.0 RHs 486.7 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil

SUMMARY

Total Power Production


442,989

Average Production per Hr.


18,458

33 kV Export

Total Steam Production


232.58

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

185,040

Prepared By G.M Shahadat Hossain Jr. Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 12 June -2011 O & M by: Average Demand 16.42 MW DAY COVERED: 11 June -2011. Average Generation 16.42 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil 47,108.2 3,065 86,400 48,750 56.42% 84.16% 18.9 4.7 0 0 0.4 98.33% 0 2 Cyl. Dev. 2/A & 6/B Cyl. 2/A & 6/B Replace a clean PCC ball valve, 2/A & 6/B Old Spark plug replace & HT lead interchange Cyl. 2/A to 3/A. Nil 48,171.8 3,069 86,400 55,232 63.93% 86.52% 20.8 3.2 0 0 0 100.00% 0 0 Nil 25,314.8 7,225 201,360 147,593 73.30% 85.12% 24 0 0 0 0 100.00% 0 0 Nil 22,031.3 6,906 201,360 142,698 70.87% 86.10% 24 0 0 0 0.00 100.00% 0 0 Nil

ENGINE / GENERATOR PERFORMANCE REPORT

Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping

Un-schedule Maintenance

Nil

Nil

Nil

Nil

Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.

Nil

Nil

Nil

Nil

1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 367.8 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 409.9 RHs 387.0 RHs 462.7 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil

SUMMARY

Total Power Production


394,274

Average Production per Hr.


16,428

33 kV Export

Total Steam Production


222.99

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

139,284

Prepared By G.M Shahadat Hossain Jr. Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 13 June -2011 O & M by: Average Demand 17.25 MW DAY COVERED: 12 June -2011. Average Generation 17.25 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 47,131.2 3,084 86,400 62,472 72.31% 88.07% 23 1 0 0 0 100.00% 0 0 48,194.3 3,082 86,400 62,140 71.92% 89.61% 22.5 1.5 0 0 0 100.00% 0 0 25,338.8 6,792 201,360 147,520 73.26% 90.50% 24 0 0 0 0 100.00% 0 0 22,054.4 6,908 201,360 142,028 70.53% 89.00% 23.1 0.9 0 0 0.00 100.00% 0 0

ENGINE / GENERATOR PERFORMANCE REPORT

Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.

Nil

Nil

Nil

Nil

Nil

Nil Nil

Nil Nil

Nil Nil

Nil Nil

Nil Nil

1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 344.8 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 387.4 RHs 363.0 RHs 439.6 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil

SUMMARY

Total Power Production


414,160

Average Production per Hr.


17,257

33 kV Export

Total Steam Production


242.29

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

246,564

Prepared By G.M Shahadat Hossain Jr. Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 14 June -2011 O & M by: Average Demand 16.8 MW DAY COVERED: 13 June -2011. Average Generation 16.72 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs Standby Downtime Hrs.

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 47,144.8 3,010 86,400 36,254 41.96% 88.56% 13.6 10.1 0 0 0.3 98.75% 2 0 48,217.4 3,020 86,400 66,683 77.18% 95.59% 23.1 0.9 0 0 0 100.00% 0 0 25,359.5 7,129 201,360 140,248 69.65% 95.04% 20.7 0 0 0 2.3 90.42% 1 0 Cyl. 2/A Dev. & HT by pass flaxible pipe leakage & start air motor problem. Cly. 2/A change pcc ball valve & HT by pass flaxible pipe leakage maintenance & start air motor survolocker valve inter change E-5 to E-4 Nil 22,078.0 7,222 201,360 158,106 78.52% 92.76% 23.6 0.4 0 0 0.00 100.00% 0 0

ENGINE / GENERATOR PERFORMANCE REPORT

Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping

Nil

Cyl. 8/B Dev.

Nil

Nil

Un-schedule Maintenance

Nil

change, pcc ball valve & old spark plug

Nil

Nil

Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action

Nil

Nil

Nil

Nil

1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 331.2 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 364.3 RHs 342.3 RHs 416.6 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil

Load Shedding : Feeder-01 loadshed 10 minutes due to engine-04 trip time. Remarks:- Plant did not trip yesterday.

SUMMARY

Total Power Production


401,291

Average Production per Hr.


16,720

33 kV Export

Total Steam Production


192.91

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

176,400

Prepared By Md. Ruhul Amin Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 15 June -2011 O & M by: Average Demand DAY COVERED: 14 June -2011. Average Generation 15.85 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs Standby Downtime Hrs.

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 47,168.8 3,012 86,400 65,281 75.56% 90.31% 24 0 0 0 0 100.00% 0 0 48,241.4 3,018 86,400 67,454 78.07% 93.13% 24 0 0 0 0 100.00% 0 0 25,383.5 7,316 201,360 157,043 77.99% 89.44% 24 0 0 0 0 100.00% 0 0 22,093.8 6,911 201,360 90,615 45.00% 82.99% 15.8 6.7 0 0 1.50 93.75% 3 0 Cyl Dev. 2/B & Lub oil pressure turbocharger ASide low.

ENGINE / GENERATOR PERFORMANCE REPORT

Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping

Nil

Nil

Nil

Nil

Un-schedule Maintenance

Nil

Nil

Nil

Nil

Replace a clean prechamber ball valve & Spark plug gap adjust.

Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action

Nil

Nil

Nil

Nil

Nil

1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 307.2 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 340.3 RHs 318.3 RHs 400.8 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil

Load Shedding : Feeder-01 open 16 minute for MTC Remarks:- Plant did not trip yesterday.

SUMMARY

Total Power Production


380,393

Average Production per Hr.


15,850

33 kV Export

Total Steam Production


191.96

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

155,160

Prepared By G.M Shahadat Hossain Jr.Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 16 June -2011 O & M by: Average Demand DAY COVERED: 15 June -2011. Average Generation 12.36 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs Standby Downtime Hrs.

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 47,192.8 3,062 86,400 65,838 76.20% 89.59% 24 0 0 0 0 100.00% 0 0 48,265.4 3,059 86,400 66,826 77.34% 91.02% 24 0 0 0 0 100.00% 0 0 25,407.5 7,283 201,360 163,987 81.44% 93.82% 24 0 0 0 0 100.00% 0 0 22,098.1 4,576 201,360 0 0.00% 0.00% 4.3 15 0 0 4.70 80.42% 11 0 Reverse power, Rack load Dev. & Lub oil pressure turbocharger A-Side low. Cyl 8/A Replace a clean prechamber ball valve, Fly wheel hole clean, Gas I/P port change. Lub oil main pump side new non-return valve replace Nil

ENGINE / GENERATOR PERFORMANCE REPORT

Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping

Nil

Nil

Nil

Nil

Un-schedule Maintenance

Nil

Nil

Nil

Nil

Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.

Nil

Nil

Nil

Nil

1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 283.2 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 316.3 RHs 294.3 RHs 397.4 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil

SUMMARY

Total Power Production


296,651

Average Production per Hr.


12,360

33 kV Export

Total Steam Production


51.97

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

76,140

Prepared By G.M Shahadat Hossain Jr.Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 17 June -2011 O & M by: Average Demand DAY COVERED: 16 June -2011. Average Generation 13.58 mw Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs Standby Downtime Hrs.

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 47,216.8 3,029 86,400 67,894 78.58% 93.39% 24 0 0 0 0 100.00% 0 0 48,289.1 3,034 86,400 66,561 77.04% 92.57% 23.7 0 0 0 0.3 98.75% 1 0 25,431.5 7,289 201,360 163,493 81.19% 93.46% 24 0 0 0 0 100.00% 0 0 22,110.5 4,235 201,360 28,110 13.96% 39.75% 16.7 0 0 0 7.30 69.58% 5 0 Reverse power & Lub oil pressure turbocharger ASide low.

ENGINE / GENERATOR PERFORMANCE REPORT

Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping

Nil

Nil

LT flow low

Nil

Un-schedule Maintenance

Nil

Nil

Nil

Nil

Lub oil filter change

Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.

Nil

Nil

Nil

Nil

Nil

1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 259.2 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 292.6 RHs 270.3 RHs 380.7 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil

SUMMARY

Total Power Production


326,058

Average Production per Hr.


13,586

33 kV Export

Total Steam Production


51.76

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

84,384

Prepared By MD.Amir Hamza Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 18 June -2011 O & M by: Average Demand DAY COVERED: 17 June -2011. Average Generation 12.32 mw Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs Standby Downtime Hrs.

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 47,240.5 3,028 86,400 65,255 75.53% 92.89% 23.2 0.8 0 0 0 100.00% 0 0 48,313.1 3,056 86,400 67,832 78.51% 92.48% 24 0 0 0 0 100.00% 0 0 25,455.5 7,028 201,360 156,111 77.53% 92.55% 24 0 0 0 0 100.00% 0 0 22,113.1 3,076 201,360 6,500 3.23% 81.27% 2.6 0 0 0 21.40 10.83% 5 0 Reverse power & Lub oil pressure turbocharger ASide low.

ENGINE / GENERATOR PERFORMANCE REPORT

Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping

Nil

Nil

Nil

Nil

Un-schedule Maintenance

Nil

Nil

Nil

Nil

Lub oil cooler cleanning

Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.

Nil

Nil

Nil

Nil

Nil

1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 236 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 268.6 RHs 246.3 RHs 378.1 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil

SUMMARY

Total Power Production


295,698

Average Production per Hr.


12,321

33 kV Export

Total Steam Production


0.00

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

111,600

Prepared By MD.Amir Hamza Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 19 June -2011 O & M by: Average Demand 12.69 MW DAY COVERED: 18 June -2011. Average Generation 12.69 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil Nil Nil 47,263.8 3,056 86,400 66,422 76.88% 93.28% 23.3 0 0 0 0.7 97.08% 1 0 Cyl. 1/A Dev. Replace a clean prechamber ball valve and spark plug gap adjust Nil 48,337.1 3,080 86,400 69,645 80.61% 94.22% 24 0 0 0 0 100.00% 0 0 Nil Nil Nil 25,479.5 7,108 201,360 168,501 83.68% 98.77% 24 0 0 0 0 100.00% 0 0 Nil Nil Nil 22,113.1 0 201,360 0 0.00% #DIV/0! 0 0 0 0 24.00 0.00% 0 0 Nil Lub oil pump check Nil

ENGINE / GENERATOR PERFORMANCE REPORT

Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.

1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 212.7 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 244.6 RHs 222.3 RHs 378.1 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil

SUMMARY

Total Power Production


304,568

Average Production per Hr.


12,690

33 kV Export

Total Steam Production


54.16

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

71,892

Prepared By MD. Amir Hamza Shift Engineer

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 20 June -2011 O & M by: Average Demand 12.1 MW DAY COVERED: 19 June -2011. Average Generation 12.1 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil Nil Nil 47,287.2 3,056 86,400 61,413 71.08% 85.88% 23.4 0 0 0 0.6 97.50% 4 0 over speed mec. Cyl. Dev. 2/A, 5/A . Replace a clean prechamber ball valve and 5/A Old spark plug change. Nil 48,361.0 3,080 86,400 67,032 77.58% 91.06% 23.9 0 0 0 0.16 99.33% 1 0 Rack Load/Dev. Nil Nil 25,503.5 7,108 201,360 162,286 80.59% 95.13% 24 0 0 0 0 100.00% 0 0 Nil Nil Nil 22,113.1 0 201,360 0 0.00% #DIV/0! 0 0 0 0 24.00 0.00% 0 0 Nil Lub oil pump check Nil

ENGINE / GENERATOR PERFORMANCE REPORT

Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.

1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 189.3 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 221.5RHs 198.3 RHs 378.1 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil

SUMMARY

Total Power Production


290,731

Average Production per Hr.


12,114

33 kV Export

Total Steam Production


52.13

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

59,220

Prepared By Md . Nazmul Alam

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

Jr . Shift Engineer

MANAGEMENT INFORMATION SYSTEM


Daily Performance Report DATE OF PREPERATION: 21 June -2011 O & M by: Average Demand 12.1 MW DAY COVERED: 20 June -2011. Average Generation 12.1 MW Last Trip 28.05.2011 04:10 PM

ENGINE / GENERATOR PERFORMANCE REPORT Particulars


Total Running Hrs Peak Load(KW) Capacity, kWh To days production Capacity Factor Load Factor Today's Running Hrs

Engine No-1 (10316) Engine No-2 (10314) Engine No-3 (10315) Engine No-4 (17045) Engine No-5 (17052)
45,389.9 0 86,400 0 0.00% #DIV/0! 0 0 0 0 24 0.00% 0 0 Nil Nil Nil 47,311.2 3,056 86,400 68,474 79.25% 93.36% 24 0 0 0 0 100.00% 0 0 Nil. Nil. Nil 48,385.0 3,080 86,400 69,913 80.92% 94.58% 24 0 0 0 0 100.00% 0 0 Nil. Nil Nil 25,527.5 7,108 201,360 162,286 80.59% 95.13% 24 0 0 0 0 100.00% 0 0 Nil Nil Nil 22,113.1 0 201,360 0 0.00% #DIV/0! 0 0 0 0 24.00 0.00% 0 0 Nil Lub oil pump check Nil

ENGINE / GENERATOR PERFORMANCE REPORT

Standby Downtime Hrs. Schedule Maintenance Hrs. Stopage time due to external reason Unschedule maintenance + Trip Downtime Hrs. Engine Avilability No of Tripping for internal reason No of Tripping for external reason Cause Of Triping Un-schedule Maintenance Schedule Maintenance Last maintenance Carried Out Next Schedule Maintenance Type Present Problem & Action Previous Problem & Action
Load Shedding : Nill Remarks:- Plant did not trip yesterday.

1000 Hr Maintenance carried 500 RH Maintenance carried 1000 Hr Maintenance carried 2000 Hr Maintenance carried 1000 Hr Maintenance carried out at 45389.9 ERH out at 46980 ERH out at 48090 ERH out at 24701 ERH out at 21495 ERH 500 RH Maintenance after 500 RHs Nil Alternator V- Phase shorted with body. 1000 RH Maintenance after 165.3 RHs Nil 500 RH maintenance after 1000 RH maintenance after 1000 RH maintenance after 197.5 RHs 174.3 RHs 378.1 RHs Nil Nil Nil Nil T.C RPM A Bank Not Show in SCADA. Nil Nil

SUMMARY

Total Power Production


300,673

Average Production per Hr.


12,528

33 kV Export

Total Steam Production


54.37

Status of Start Air Compressor


OK

Status of Boiler
Boiler-01 Economizer leakage. Maintenance work running.Boiler-03 economizer leakage

42,156

Prepared By Md . Nazmul Alam

Acknowledged by A. T. M. Nurul Anwar Plant In Charge

Jr . Shift Engineer