Speed Gas understands and are experts when it comes to installation of LPG gas plant. We
will handle the entire process from the application through DPR, to paying the statutory and
processing fees to the most important, which is to satisfy the entire requirements stipulated
by DPR in order to obtain the following approval:
Following the satisfactory review, Site Suitability Approval will be given and upon receipt of
the SSA, we will display conspicuously a sign tagged ‘DPR Gas Storage and Utilization
Facility Approved Site (Approval number), which shall be valid for 18 months.
i. A letter/ approved building plan from the appropriate Town Planning Authority,
authorizing the siting of the facility at the proposed site. The submission shall contain all
relevant drawings such as:
a. Piping and Instrumentation Diagram (P&ID),
c. Codes, Standards and Specification adopted in the design, construction and installation of
ancillary equipment.
ii. A fire report by Chief Federal/State Fire officer or an officer authorized by him, that he is
satisfied with the proposed arrangement for the prevention of fire.
iii. Any of the following shall subsist - Current Tax clearance certificate, Evidence of Tax
Payment, Tax Identification Number (TIN) or evidence of tax exemption.
iv. Health, Safety and Environment (HSE) policy for the proposed plant, if less than 10 MT or
Environmental Impact Assessment (EIA) report, if above 10 MT.
The validity of Approval to Construct shall be 30 months (in the first instance) on the
following conditions:
i The facility shall commence meaningful development. The company shall update the
nearest DPR office at six months intervals.
After which we shall commence on construction and fabrication of Storage tanks taking into
consideration that we possess valid and appropriate DPR Oil and Gas Industry Service
Permit(s).
Upon completion of the entire works (Mechanical, Civil and Electrical) and leak test, we shall
apply for LTO, pay the applicable fees and upload all statutory/technical requirements on
the portal as follows:
i i. Valid Calibration Certificates/Report of Measuring Equipment for LPG refilling Plants
issued by DPR accredited companies and witnessed by DPR in line with relevant standards.
iii iii. Ultrasonic Thickness Measurement (UTM) test certificates of the storage tank. This
test shall be conducted on site for all tanks and done prior to burial for underground tanks.
The UTM test shall be carried out by a company with applicable OGISP and witnessed by the
DPR.
iv iv. Pressure test reports and certificate or any other DPR approved integrity test
report for tanks and piping. The Pressure test shall be carried out by company with
applicable OGISP and witnessed by the Department. The Pressure test should be carried out
for a new tank at installation before operation and after every Five (5) years.
i Any of the following shall subsist - Current Tax clearance certificate, Evidence of Tax
Payment, Tax Identification Number (TIN) or evidence of tax exemption.
ii vi. Our List and Evidence of trained staff by a consultant with applicable OGISP.
iii vii. Approved Standard Operating Procedure (SOP) for the Gas Storage and Utilization
Facility in line with the DPR SOP template.
iv viii. ‘8 x 10’ size Photographs of Plant from different vantage points showing its
amenities. ix. As-built Layout drawing. This will be verified by DPR during pre-licence
inspection.
Integrity tests and other applicable tests shall be conducted companies with relevant OGISP
permits
1.1 Facility Layout & Site Selection
3.2.1 Site Selection Criteria
1. Any site chosen for the facility shall be sufficiently spacious to allow it to
be designed to minimize the risks from LPG to any structure close to the
facility and person likely to be at or near the facility.
2. The site shall, at the minimum, meet the following requirements:
i. It shall be accessible from the roadside.
ii. It shall not be within, under, or close to known hazards such as pipeline
Right of Way (ROW), high voltage cable, railways, etc.
iii. The minimum horizontal distance between the shell of a pressurized tank
and the line of adjoining property that may be developed shall be as shown
3.1. Where residences, public buildings, places of assembly, or industrial sites
are located on adjacent property, greater distances or other
supplemental protection (firewall/underground tank) shall apply
iv. The drainages to be constructed or existing ones shall not be channelled
to a stream or waterway. Contaminated water shall be contained and
treated onsite.