Professional Documents
Culture Documents
RAM Combat Maintenance
RAM Combat Maintenance
RAM Combat Maintenance
RAM Combat
Disassembling
RAM Combat Series
RAM Combat
Maintenance Procedure
1
After un-
un-install the Magazine &
Un-
Un-install Magazine Un-
Un-install the Cylinder Cover
Cylinder Cover
Use the tools to take out the Locking Use the tools to take out the Locking When take out the Locking Pin, keep watch
Pin Pin 1 & 2 for Locking Pin 1 is long & 2 is short
2 1
2
1
2 2
2
Take out the Slide Unit, keep watch RAM Combat after disassembling the
Keep watch for Trigger Bar
for the Slide Release Catch & Spring Slide Unit
Disassembling the
barrel unit
3
Take out the Launching Compartment
Take out the Launching Unit Launching Unit with Recoil Cover
Unit
Recoil Cover
Remove the Recoil Cover After take out the Recoil Cover Launching Unit
Ball holder
Gas Chamber
Launching Unit
Hammer Unit
Pressure Unit
4
Use the tools to remove the chamber
Remove the Gas Chamber Unit
unit
Compartment
Gas chamber - In case hearing gas leaking
sound from the steel windpipe
Take out the Gas Chamber Unit Parts in Gas Chamber Unit
End Cap
5
Remove the Hammer Unit Use tools to remove Hammer Unit After take out the Hummer Unit
Hammer Spring
Hammer
Hammer
Locking Pin
6
Use hex key to remove the Adjusting After take out the Adjusting Screw, can
see the Spring & Thimble
Use the tools to take out the Spring
Screw
Thimble
Thimble
Spring Spring
adjusting screw
After take out the Spring, you can see the Put the screw driver onto the Valve
Use the screw to fix the Thimble
Thimble Cover
Thimble
7
Use the screw driver to remove the After take out the Valve Cover, Can see
Take out the Valve Cover the Sealing Pin Spring & Sealing Pin
Valve Cover (anti-
(anti-clock wise)
Sealing pin
Valve Cover
After take out the Sealing Pin Spring, Use the screw driver to take out the
Take out the Sealing Pin Spring
can see the Sealing Pin Sealing Pin
Valve Cover
Sealing Pin
8
After take out the Sealing Pin, can After take out the Thimble, can see Use the tools to remove the Valve
take out the Thimble the Valve Cover Cover
Thimble
Valve Cover
Valve Cover
Use the tools to support the tools to After take out the Valve Cover, can
Use the tools to take out the O-
O-Ring
remove the Valve Cover see the Valve & O-
O-Ring
O-Ring
Valve
O-Ring
Valve Cover
9
End of Maintenance Procedures
After finish the maintenance of the pressure unit, should check the
End of the maintenance
pressure using pressure gauge. The needle of the pressure gauge
should be pointed at 4.5MPa. When pressure gauge shows that the
needle is not keeping at the proper position and still rising, use
use a
Assemble all parts and units
instruction manual
specific hex key to adjust the pressure higher (clockwise) or lower
lower Apply few drops of lubricant oil into the marker core if necessary.
necessary.
(anti-
(anti-clockwise). For any questions, please contact:
Install the pressure gauge onto the gas chamber unit. Disassemble
Disassemble APS Paintball Limited
all parts in the launching unit except the O-
O-ring stayed behind at the
Tel: (852) 2409 4466 Fax: (852) 2409
gas chamber. 9632
E-mail: aps@apsram.com Website:
www.apsram.com
10