ACTIVITY : DATE :
INSPECTION LEVEL
METHOD OF
NO. ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING DOCUMENT TIME INSPECTION/ FREQUENCY
INSPECTION Owner Contractor Consultant
Review, Visual,
2 Continuity Test Cable UTP CAI-TS-ELV-01 and Shop drawing Approved QC-ME-TST-016 Per as execution SW W W
Measurement
Review, Visual,
3 Functional Test for Access Control CAI-TS-ELV-01 and Shop drawing Approved QC-ME-TST-015 Per as execution SW W W
Measurement
SW : Spot Witness Spot Witness, This activity may perform during perform during construction where interim measurements, and/or witness of activity normally take place, prior to final measurement or inspection being done
NAME : NAME :
SIGN : SIGN :
DATE: DATE:
FMR-QCL-09/R1
ECT SYMBOL
REMARK
0A
020-ITP-ME-2022
Project No. : MD - 2408
Inspection & Test Plan of Access Control System Installation DATE PREPARED
CHECKED Sheet: Of:
APPROVED BY
QC
: Cainiao Smart Logistic Warehouse Site QC Project Manager
Project 6/3/2022 Manager
Responsbility*
No Item Description/Inspection Activity & Test Plan Method of Inspection Acceptance Criteria / Reference Verifying Document Time Inspection / Frequency Remarks
Murinda BNBV CN
Access Control System Installation
A Prepare Material
1 Conduit, fisher, Dy., & screw Visual
2 Door intelligent controller Visual
3 Panel enclosure Visual
4 Smartcard reader with keypad Visual CAI-DWG-ELV-GEN-AC, CAI-TS-ELV-01, The
Brand, Size, Dimension, kind of others material QC-ME-GEN-002 Per as execution M W SW
5 Electromagnetic lock Visual accordance to material Approved
6 Emergency break glass Visual
7 Steel exit push button Visual
8 Cable UTP Visual
B B Implementation Work
1 Drill the location for placing of cinduit pipe Visual Daily
2 Install the conduit and cable Visual Daily
3 Install the panel intelligent controller Visual - MS-ME-ELV-006 Per as execution
4 Install the smartcard reader with keypad Visual - The position hole is same at the position conduit, Per as execution
- Strong and install corresponded, QC-ME-INS-023 M W SW
5 Install electromagnetic lock Visual - Straight and Tidy Per as execution
6 Install emergency break glass Visual - Accessories after following point of shop drawing Per as execution
7 Install steel exit push button Visual Per as execution
8 Install switch rack & switch hub Visual Per as execution
9 Cleaning material after working Visual Place should be clean from residual material - Daily SW SW SW
C TESTING
Review, Visual,
1 Continuity Test Cable FO CAI-TS-ELV-01 and Shop drawing Approved QC-ME-TST-017 Per as execution SW W W
Measurement
Review, Visual,
2 Continuity Test Cable UTP CAI-TS-ELV-01 and Shop drawing Approved QC-ME-TST-016 Per as execution SW W W
Measurement
Review, Visual,
3 Functional Test for Access Control CAI-TS-ELV-01 and Shop drawing Approved QC-ME-TST-015 Per as execution SW W W
Measurement
* Legend :
Ref. Drawing :
Remarks
No. Description Comments
Applicable (A) Not Applicable (NA)
8 Colour is appropriate
Notes :
NAME
SIGNATURE
DATE
Attached : Date:
QC-ME-INS-023
CAINIAO SMART LOGISTIC WAREHOUSE PROJECT Doc.No. : Page: 00 of 00
Ref. Drawing :
RESULT
No. ITEM TO CHECKED REMARKS
YES NO
A Installation
1 Layout according to shop drawing
2 All cables must be protected by pipes or canals
3 Check cable termination
4 Installation of cable conduit pipe must be neat and not cross other installation
5 Magnetic lock & door contact installed correctly
Installation of access control reader, emergency door release, & exit push button should have
6
elevation +1500 from the finish floor
7 Access switch installed correctly
Notes :
NAME
SIGNATURE
DATE
Attached : Date:
QC-ME-TST-015
CAINIAO SMART LOGISTIC WAREHOUSE PROJECT
Doc.No. : Page: 00 of 00
Location :
Ref. Drawing :
Comments Conclusions:
Approved
Approved w/ comments
Not approved
Commented & Resubmitted
Signature
Date
Attached : Date:
Ref. Drawing :
Zone Result
No. Cable Type Remarks
From To Pass Fail
Note :
Comment Conclusion :
Approved
Approved with comment
Not Approved
Revised & Resubmit
Prepared Reviewed Approved Approved Approved Approved
PT Murinda Iron PT LDI
SPV QC Bureau Veritas Cainiao
Steel Engineering
Name
Signature
Date
Attached : Date:
Ref. Drawing :
Note :
Comment Conclusion :
Approved
Approved with comment
Not Approved
Revised & Resubmit
Prepared Reviewed Approved Approved Approved Approved
SPV QC PT Murinda Iron Steel PT LDI Engineering Bureau Veritas Cainiao
Name
Signature
Date