Status: C

OSBP FACILITIES AT SUAM. Drawing No: ST-01


Sheet No: 1
Job No: STR-045 Revision: R00
Section: Summary of Bar weights Prepared By: ak. Date: 7/14/2022
Location: Substructure Works. Checked By: FM Last Revised: N/A

Summary of bar lengths and weights

Total length [m]


Bar size Weight [kg]
(of all bars in this size)

8 964.100 380.418

12 1417.600 1258.565

16 4805.850 7585.247

Total weight [kg] 9224.230

Additional information:

This schedule conforms to BS 8666:2020

Status: P - Preliminary; T - Tender; C - Construction