RURAL POWER COMPANY LIMITED MYMENSINGH POWER STATION

Document Type: Location: Procedure Type: Document No:


OPERATION CONTROL ROOM GAS TURBINE OPERATION RPCL-MPS-SOP-001
PROCEDURE

GAS TURBINE OPERATION

RPCL-MPS- Operation Procedure Page 1 of 4


RURAL POWER COMPANY LIMITED MYMENSINGH POWER STATION
Document Type: Location: Procedure Type: Document No:
OPERATION CONTROL ROOM GAS TURBINE OPERATION RPCL-MPS-SOP-001
PROCEDURE

TABLE OF CONTENTS

S/L TOPICS Page


PURPOSE 02
2.0 SCOPE/APPLICABILITY 03
3.0 LIST OF ABBREVIATIONS 04
4.0 GLOSSARY OF TERMS 05
GAS TURBINE START UP
GAS TURBINE OPERATION 07
OFFLINE COMPRESSOR WATER WASH 10
29
APPENDICES 45

PURPOSE:
The purpose of this procedure is to identify the responsibilities, requirements and guideline
for the standardized operation of the Gas Turbine Systems of 210 MW combined cycle power
plant operating under Rural Power Company Limited (RPCL). The operating instructions
within this procedure provides detailed step-by-step guidance to carry out the task of settings
checks, start up, operation, shut down and emergency procedures for these equipment and / or
system according to the manufacturer’s recommendations.

SCOPE/APLICABILITY:
This procedure applies to all personnel engaged in the operation of the Mymensingh Power
Station. Power Plant employees and others engaged in the maintenance or repair of the Power
Plant must familiarize themselves with the contents of this procedure and follow the
instructions it provides.

RPCL-MPS- Operation Procedure Page 2 of 4


RURAL POWER COMPANY LIMITED MYMENSINGH POWER STATION
Document Type: Location: Procedure Type: Document No:
OPERATION CONTROL ROOM GAS TURBINE OPERATION RPCL-MPS-SOP-001
PROCEDURE

LIST OF ABBREVIATIONS

Abbreviation Description
GT Gas Turbine
GTG Gas Turbine Generator
LO Lubricating Oil
IGV Inlet Guide Vane
MCC Motor Control Center
A.C Alternating Current
D.C Direct Current
SRV Stop/Speed Ratio Valve
GCV Gas Control Valve
GSV Gas Splitter Valve
FSR Fuel Stroke Reference
FSNL Full Speed No Load
SP Spark plug
FD Flame Detector

APS Automatic Plant Start-up


AVR Automatic Voltage Regulator
WST Wheel Space Temperature
BRG Bearing
CCR Central Control Room
CCW Closed Cooling Water
HO Hydraulic Oil
CRT Cathode Ray Tube
CSO Control Signal Output
CV Control Valve
CWP Circulating Water Pump
DCS Distributed Control System
EOP Emergency Oil Pump
EXC Exciter
EXT Exhaust Gas Temperature
F/F Fire Fighting
FCV Flow Control Valve
GEN Generator
HRSG Heat Recovery Steam Generator
ALR Automatic Load Regulator
AOP Auxiliary Oil Pump
MOP Main Oil Pump

RPCL-MPS- Operation Procedure Page 3 of 4


RURAL POWER COMPANY LIMITED MYMENSINGH POWER STATION
Document Type: Location: Procedure Type: Document No:
OPERATION CONTROL ROOM GAS TURBINE OPERATION RPCL-MPS-SOP-001
PROCEDURE

PCV Pressure Control Valve


RCT Rotor Cooling Air Temperature
TCV Temperature Control Valve

AA Atomizing Air
WI Water injection
WWS Water washing System
LDO Light Distillate Oil

GLOSSARY OF TERMS

RPCL-MPS- Operation Procedure Page 4 of 4