Download as pdf or txt
Download as pdf or txt
You are on page 1of 60

SHEET PILE WALLS 2

Lecture 14
Asst. Prof. Kristian Azul
SHEET PILES
3

SHEET PILES PENETRATING CLAY


At times,
cantilever sheet
piles must be
driven into a clay
layer possessing
an undrained
cohesion c (φ =
0).

GEOTECHNICAL ENGINEERING II
4

SHEET PILES PENETRATING CLAY


What we will be
analyzing will be
sheet piles
driven into clay
with granular soil
backfill.

GEOTECHNICAL ENGINEERING II
5

SHEET PILES PENETRATING CLAY


Important notes:
Getting the
effective
horizontal
pressure σ1’ and
σ2’ will be the
same procedure
as before.What
changes is the
pressure
distribution
below the
dredge line.

GEOTECHNICAL ENGINEERING II
6

SHEET PILES PENETRATING CLAY


Also note that
below the
dredge line (clay
with no angle of
friction),
Ka = Kp = 1.
Thus, resulting to
the pressure
diagram shown.

GEOTECHNICAL ENGINEERING II
7
ACTIVE EARTH PRESSURE
(RANKINE)

For c-φ’ soils

This means that there is tensile stress


until a depth of zc (point where
horizontal stress = 0).
This will result to a
TENSILE CRACK
GEOTECHNICAL ENGINEERING II
8
PASSIVE EARTH PRESSURE
(RANKINE) For c-φ’ soils

GEOTECHNICAL ENGINEERING II
9

SHEET PILES PENETRATING CLAY


At a point below dredge line but above rotation point O
(left is passive; right is active).

GEOTECHNICAL ENGINEERING II
10

GEOTECHNICAL ENGINEERING II
11

SHEET PILES PENETRATING CLAY


At the bottom point:

GEOTECHNICAL ENGINEERING II
12

GEOTECHNICAL ENGINEERING II
13

SHEET PILES PENETRATING CLAY


From summation of forces:
ACDE – EFIB + GIH = 0

GEOTECHNICAL ENGINEERING II
14

GEOTECHNICAL ENGINEERING II
15

SHEET PILES PENETRATING CLAY


Doing summation of moments about B (bottom):

GEOTECHNICAL ENGINEERING II
16

GEOTECHNICAL ENGINEERING II
17

SHEET PILES PENETRATING CLAY


Combining

GEOTECHNICAL ENGINEERING II
18

GEOTECHNICAL ENGINEERING II
19

STEP 1:
Calculate Ka for
granular backfill

GEOTECHNICAL ENGINEERING II
20

STEP 1:
Calculate Ka for
granular backfill

GEOTECHNICAL ENGINEERING II
21

STEP 2:
Calculate σ1’ and
σ2’

GEOTECHNICAL ENGINEERING II
22

STEP 2:
Calculate σ1’ and
σ2’

GEOTECHNICAL ENGINEERING II
23

STEP 3:

Calculate P1 and
𝑧1

*Use moment
concept or
centroid concept

GEOTECHNICAL ENGINEERING II
24

STEP 3:

Calculate P1 and
𝑧1

*Use moment
concept or
centroid concept

GEOTECHNICAL ENGINEERING II
25

STEP 4:
Calculate D

GEOTECHNICAL ENGINEERING II
26

STEP 4:
Calculate D

GEOTECHNICAL ENGINEERING II
27

STEP 5:
Calculate L4

GEOTECHNICAL ENGINEERING II
28

STEP 5:
Calculate L4

GEOTECHNICAL ENGINEERING II
29

STEP 6:
Calculate σ6 and
σ7

GEOTECHNICAL ENGINEERING II
30

STEP 6:
Calculate σ6 and
σ7

GEOTECHNICAL ENGINEERING II
31

STEP 7:
Draw the pressure
diagram as shown

GEOTECHNICAL ENGINEERING II
32

STEP 8:
The actual depth
of penetration is

D(actual)
= 1.4 D(theo) to
1.6 D(theo)

GEOTECHNICAL ENGINEERING II
33

Additionally, we
can get the
location of zero
shear

z‘ is zero at
dredge line.

GEOTECHNICAL ENGINEERING II
34

Mmax can be
obtained from
cutting at zero
shear and getting
the internal
moment there.

GEOTECHNICAL ENGINEERING II
35

EXAMPLE 1
Determin
e
D(actual)
if it is
1.5D(theo)
.

GEOTECHNICAL ENGINEERING II
36

EXAMPLE 1
Step 1

GEOTECHNICAL ENGINEERING II
37

EXAMPLE 1
Step 2:

GEOTECHNICAL ENGINEERING II
38

EXAMPLE 1
Step 3:

GEOTECHNICAL ENGINEERING II
39

EXAMPLE 1
Step 4:

D = 2.13
GEOTECHNICAL ENGINEERING II
40

EXAMPLE 1
D(actual) = 1.5 D(theoretical)
= 1.5*2.13
= 3.2m

GEOTECHNICAL ENGINEERING II
41

EXAMPLE 1
We can continue with the steps so that we can
also determine the location of zero shear and
max moment value.

GEOTECHNICAL ENGINEERING II
42

EXAMPLE 1
Step 5:

GEOTECHNICAL ENGINEERING II
43

EXAMPLE 1
Step 6:

GEOTECHNICAL ENGINEERING II
44

EXAMPLE 1

GEOTECHNICAL ENGINEERING II
SPECIAL CASES
46
SHEET PILES PENETRATING CLAY
(NO WATER TABLE)

GEOTECHNICAL ENGINEERING II
47
SHEET PILES PENETRATING CLAY
(NO WATER TABLE)

GEOTECHNICAL ENGINEERING II
48
SHEET PILES PENETRATING CLAY
(NO WATER TABLE)

Also note that:

GEOTECHNICAL ENGINEERING II
49
SHEET PILES PENETRATING CLAY
(NO WATER TABLE)
Additionally,

GEOTECHNICAL ENGINEERING II
50

EXAMPLE 2
Determine D if:
Sand Layer:
L = 6m
ϒ = 16kN/m3
φ‘ = 30

Clay Layer:
ϒsat = 18.9kN/m3
φ‘ = 0
c = 95kN/m2
GEOTECHNICAL ENGINEERING II
51

EXAMPLE 2 (1-3)

Determine P1 and z(bar)1

GEOTECHNICAL ENGINEERING II
52

EXAMPLE 2 (4)

D = 2.1m

GEOTECHNICAL ENGINEERING II
53

EXAMPLE 2
We can design the sheet pile section as well if
we determine the max moment:

GEOTECHNICAL ENGINEERING II
54

EXAMPLE 2 (6)
We can design the sheet pile section as well if
we determine the max moment:

Mmax = 208.23 kN-m/m

GEOTECHNICAL ENGINEERING II
SPECIAL CASES
56
FREE CANTILEVER SHEET PILE
WALL PENETRATING CLAY

GEOTECHNICAL ENGINEERING II
57
FREE CANTILEVER SHEET PILE
WALL PENETRATING CLAY
Depth can be calculated as:

And to complete the diagram:

GEOTECHNICAL ENGINEERING II
58
FREE CANTILEVER SHEET PILE
WALL PENETRATING CLAY
With the diagram complete,

GEOTECHNICAL ENGINEERING II
59

EXAMPLE 3
If P = 32kN/m,
L=3.5m and c=12
kN/m2, determine D.

GEOTECHNICAL ENGINEERING II
60

EXAMPLE 3
If P = 32kN/m,
L=3.5m and c=12
kN/m2, determine D.

D = 4.6m
GEOTECHNICAL ENGINEERING II

You might also like