Learning Outcomes:
L.O.1 Select wiring devices
A. INTRODUCTION
This session covers the knowledge, skills and attitudes on installing wiring devices, installing lighting fixtures/switches and notifying
completion of work of floor and wall mounted outlets and auxiliary outlets.
B. LEARNING ACTIVITIES
LO 1: Select wiring devices
Learning Content Methods Presentation Practice Feedback Resources Time
Trainee will read Trainee will Trainee will Information 1hrs
information sheet. 3- answer self- compare the Sheet/Self
Independent Learning 1-1 types of interpret check 3-1-1 result with check/Answ
plan and wiring answer key er
diagram Key/Trainer
Trainee will observe Trainee will Trainee will Performanc 5hrs
Interpreting plans and the trainer perform return evaluate the e Criteria 30mins
wiring diagrams advanced /trainee’s demonstration output using Checklist/Tr
demonstration on on how to Performance ainee
practice the drawing draw an Criteria
Demonstration
procedure on how to interpret plan Checklist 3-
interpret plans and and wiring 1-1
used of proper wiring diagram
diagram in different
method.
Trainee will read the Trainee will Trainee will Information 2hrs
Determine Materials information sheet. 3- answer self compare the Sheet/Self
specification Independent Learning 1-2 Select wiring check 3-1-2 result with check/Answ
devices answer key er
Key/Trainer
Trainer will play the Trainee will Refer to Laptop/LCD 3hrs
power point answer the model Projector
Multi- Media Presentation
presentation based follow up oral answer
with discussion
on the Select wiring question
devices
LO 2: Install wiring devices
PEC requirement Independent Learning Trainee will read Trainee will Trainee will Information 2hrs
regarding on the information sheet. 3- answer self- compare the Sheet/Self
Installation procedures 2-1 PEC requirement check 3-2-1 result with check/Answ
of various wiring devices regarding on the answer key er
Installation Key/Trainer
procedures of
various wiring
devices
Trainer will play the Trainee will Refer to model Laptop/LCD 3hrs
power point answer the answer Projector
presentation based follow up
on the PEC oral question
requirement
Multi-media Presentation regarding on the
Installation
procedures of
various wiring
devices
Checking and Trainer will play the Trainee will Refer to model Laptop/ 3hrs
Conforming the power point answer the answer LCD,
installation based on the presentation based follow up Projector
job requirement and Multi-Media Presentation/ on the Conforming oral question
applying techniques in installation of
different types of wiring different types of
design. wiring techniques
Trainee will Trainee will Trainee will Performanc 5hrs
observe the trainer perform Evaluate e Criteria
advanced return output using Checklist/Tr
/trainee’s demonstrat Performance ainee
demonstration on ion on Criteria
Demonstration/ mentoring Checklist 3-2-
practicing the practicing
procedure in installing of 2
installing wiring wiring
devices techniques devices
in different
method.
LO 3: Install lighting fixture/ switches
Installing procedures of Independent Learning Trainee will read Trainee will Trainee will Information 2hrs
various lighting materials information sheet. 3- answer self- compare the Sheet/Self
3-1 in Installing check 3-3-1 result with check/Answ
procedures of answer key er
various lighting Key/Trainer
materials that could
be able to accurate
the total load of each
fixtures/switch within
the accordance of
that could be able to
PEC.
accurate the total load of
each fixtures/switch Trainee will view the Trainee will Refer to Laptop/ 3hrs
within the accordance of power point answer the model LCD,
PEC. presentation based follow up oral answer Projector
on the Installing question
procedures of
various lighting
Multi-Media Presentation
materials that could
be able to accurate
the total load of each
fixtures/switch within
the accordance of
PEC.
Applying methods and Trainee will read Trainee will Trainee will Information 2hrs
techniques in installing information sheet. 3- answer self- compare the Sheet/Self
various type of lighting 3-2 Applying check 3-3-2 result with check/Answ
fixtures/ switches methods and answer key er
Independent Learning techniques in Key/Trainer
installing various type
of lighting fixtures/
switches
Demonstration Trainee will observe Trainee will Trainee will Performanc 5hrs
the trainer’s perform return evaluate the e Criteria
advanced trainee’s demonstration output using Checklist/Tr
demonstration on on practicing Performance ainee
practicing the installing of Criteria
procedure in lighting Checklist 3-
installing of lighting fixtures/switch 3-2
fixtures/switches if es.
different method.
LO 4: Notify completion of work
Trainee will read Trainee will Trainee will Information 2hrs
information sheet. 3- answer self- compare the Sheet/Self
4-1 Examining the check 3-4-1 result with check/Answ
lighting answer key er
fixtures/switches and Key/Trainer
secure the
Independent Learning equipment
installation based on
Examining the lighting the job requirement
fixtures/switches and and obey the 5’s
secure the equipment rules.
installation based on the
job requirement and
obey the 5’s rules. Trainee will observe Trainee will Trainee will Performance 5hrs
the trainer’s perform evaluate the Criteria
advanced trainee’s to return output using Checklist/Tra
Demonstration examine and secure examine and Performance inee
the lighting secure the Criteria
fixtures/switches lighting Checklist 3-
based on the job fixtures/switch 4-1
requirement es based on
the job
requirement
Performing Multi-Media Presentation Trainee will view the Trainee will Refer to Laptop/LCD, 3hrs
commissioning activity power point answer the model Projector
presentation based follow up oral answer
on the Energizing question
and Performing
activity
Trainee will Trainee will Performance 5hrs
Trainee will observe
perform evaluate the Criteria
the trainer’s
return output using Checklist/
advanced trainee’s
demonstrate Performance Trainee
Demonstration demonstration on
in Performing Criteria
Performing and
and Checklist 3-
commissioning
commissionin 4-2
activities
g activities
C. ASSESSMENT PLAN
Written Test – Electrical Wiring Symbol, Select Wiring Devices
Oral questioning test - Electrical Wiring Devices , Electrical Safety Questions
Performance Test – Electrical Layout Plan , Install Wiring Devices
D. TEACHER’S SELF-REFLECTION OF THE SESSION
Achieved Yes – Follow Safety Rules during activity.
Obey Procedures before start of activity
Time allotment must be in mind.
Philippine Electrical Code Requirement Complied.
Observe Good Housekeeping.
PARTS OF A COMPETENCY-BASED LEARNING MATERIAL
References/Further Reading
Self Check
Information Sheet
Learning Experiences
Module
List of Competencies
Content
Module Content
Module Content
Front Page
In our efforts to standardize CBLM, the
above parts are recommended for use
in Competency Based Training (CBT)
in Technical Education and Skills
Development Authority (TESDA)
Technology Institutions. The next
sections will show you the components
and features of each part.
List of Competencies
INSTALLING
INSTALL ELECTRICAL
ELECTRICAL
PROTECTIVE DEVICES
PROTECTIVE DEVICES
FOR DISTRIBUTION,
FOR DISTRIBUTION, ELC741302
2. POWER, LIGHTING,
POWER, LIGHTING,
AUXILIARY, LIGHTNING
AUXILIARY, LIGHTNING
PROTECTION AND
PROTECTION AND
GROUNDINGSYSTEMS
GROUNDINGSYSTEMS
LEARNING OUTCOMES:
L.O.1 Select wiring devices
L.O.2 Install wiring devices
L.O.3 Install Lighting fixtures/switches
L.O. 4 Notify Completion of Work
ASSESSMENT CRITERIA:
Contents:
Assessment Criteria
Conditions
1. Learning Materials
Electrical wiring plan
Electrical symbols
Electrical supplies
Assessment Method:
1. Demonstration
2. Written Test
3. Direct observation and questioning
Perform Job Sheet 3.1-1 You may ask your trainer to observe
and evaluate your performance using
the Performance Criteria Checklist
3.1-1
Learning Objectives:
After reading this INFORMATION SHEET, YOU MUST be able to:
1. Recognize the different types of electrical of wiring symbols.
2. Select and use of electrical wiring symbols to be used in a particular
electrical work.
3. Prepared lay out for electrical plan according to the job requirements.
CONTENT:
A wiring diagram usually gives information about the relative position and
arrangement of devices and terminals on the devices, to help in building or servicing
the device. This is unlike a schematic diagram, where the arrangement of the
components' interconnections on the diagram usually does not correspond to the
components' physical locations in the finished device. A pictorial diagram would
show more detail of the physical appearance, whereas a wiring diagram uses a more
symbolic notation to emphasize interconnections over physical appearance.
Single outlet
Duplex outlet
Refrigerator outlet
Floor outlet
Power panel
1.
2.
3.
4.
5.
Performance Objective: Given a working plan, you should be able to list down
the tools, materials and equipment needed for illustrating.
Steps/Procedure:
1. Interpret the given electrical plan100mm X 100mm.
2. Determine the safety procedure on how to illustrate.
3. List down all necessary tools needed for the illustrating. (use the table
below).
4. Identify the PPE required for installation.
Tools
Equipments
Personal Protective
Equipment (PPE)
Assessment Method:
Demonstration
Direct observation and questioning
Learning Objectives:
After reading this INFORMATION SHEET, YOU MUST be able to:
1. Recognize the different types of electrical of wiring devices that use in the
electrical work.
2. Select and use of electrical wiring devices to be used in a particular
electrical work.
3. Prepared for electrical wiring devices according to the job requirements.
WIRING DEVICES
The extent of wiring device work is indicated by drawings and schedules. Wiring
devices are defined as single discrete units of electrical distribution systems
which are intended to carry but not utilize electrical energy.
Work described in this Section includes furnishing all labor, materials, equipment,
tools and incidentals required for a complete and operable installation of wall
switches, receptacles, plugs, device plates and box covers. All equipment
shall be installed, adjusted, tested and placed in operation in accordance with
these Specifications, the manufacturer's recommendations and as shown on
the Drawings.
The following are common electrical wiring devices needed in the electrical
installation.
C. Electrical tape
D. WIRE NUT
C. Electrical tape
D. WIRE NUT
REMEMBER
1. Personal protective equipment should be taken cared as of the others tools
and equipment. Wipe your hardhat, gloves, and safety shoes before keeping
it.
2. It should also be cleaned, kept in proper tool rack/cabinet.
3. It should be stored in dry places so that it will not have mold build-up.
4. Over-all suites should be washed regularly so that perspirations and other dirt
will be washed clean.
Competency
ELECTRICAL INSTALLATION AND MAINTENANCE NCII
standard:
Unit of INSTALL WIRING DEVICES OF FLOOR AND WALL
competency: MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES
AND AUXILLIARY OUTLETS
Ways in which evidence will be collected:
Transcript of Records
Demonstration with
Certificate of Employment
Oral Questioning
Oral questioning
Written Test
The evidence must show that the trainee…
Read and interpret drawing √
Select appropriate tools, equipment √ √
Identify the correct procedures for installation of wiring
√
devices and lighting fixtures/switches
Identify the correct PPE in line with the safety
√ √
requirements
Identify the correct type of electrical wiring devices,
√ √
lighting fixtures/switches and auxiliary outlets
Checks to ensure they followed safety in accordance with
√
established procedures
Select and use correct PPE √ √ √
Clean worksite, electrical tools and equipment √
Trainee’s Name:
Trainer’s Name:
Qualification:
Date of assessment:
Time of assessment:
Instructions for demonstration
Given the necessary materials, tools and equipment, the trainee must be able Install wiring
devices of floor and wall mounted outlets, lighting fixtures/switches and auxiliary outlets
in 51 hours observe Workplace Health and Safety Practices
Materials and equipment
“ lineman’s pliers, long nose pliers, diagonal cutting pliers, level bar, pull
push rule, claw hammer, philips screwdriver, standard screwdriver,
wiring booth, floor outlet, Ground fault current interrupting device,
Grounding type convenience outlet, light switches, wire nut, electrical
tape, rubber tape.”
to show if evidence is
OBSERVATION
demonstrated
During the demonstration of skills, did the
Yes No N/A
trainee:
Read and interpret drawing
Select appropriate tools, equipment
Identify the correct procedures for installation
of wiring devices and lighting
fixtures/switches
Identify the correct PPE in line with the safety
requirements
# of
Objectives/Content
Knowledge Comprehension Application items/
area/Topics
% of test
Electrical Wiring
symbols and 5 5 5 40%15
Diagram
Different types of
Electrical wiring 5 3 2 35%10
devices
Procedures in
installation of
1 2 2 25% 5
electrical wiring
devices
TOTAL 5 10 15 100%30
GENERAL INSTRUCTION:
This are the 3 SET of test one is MATCHING TYPE composed of (15) items,
MULTIPLE CHOICE TYPE composed of (10) items ,and TRUE or FALSE TYPE
composed of (5) items for a total 30 . The passing rate is 70% on each set.
Column A Column B
1.Floor outlet
4.Earth Ground
5.Electrical Wire
6.____Connected Wires
7.____Not Connected Wires A.
8.____SPST Toggle Switch
9.____SPDT Toggle Switch
10.___Electrical Panel B.
C.
D.
E.
12._______________Junction Box
13._______________Exhaust Fan
14._______________Distribution Box
6. The _________ is used between two three-way switches to provide control for an
outlet or light fixture from three or more different locations.
7. The electric switch that has three terminals; used to control a circuit from two
different locations.
Test III. True or False: Write TRUE if the statement is correct and FALSE if
the statement is not.
1. The four way switch is used between two switches to provide control for an
outlet or light fixture from three or more different locations.
2. Single Pole Single Throw (SPST) can be select between two connections.
3. Why it’s important to have an Electrical Diagram during Installation.
4. GFCI outlets are required in places with water - so that's bathrooms and
kitchens and maybe outside - especially near a swimming pool.
WRITTEN TEST
TEST I. IDENTIFY
TEST II. MULTIPLE CHOICES
1.Floor outlet
1. B
2.Special Power Outlet 2. A
3. C
3.Lamp or Light Bulb 4. B
4.Earth Ground 5. C
6. B
7. C
5.Electrical Wire 8. D
6.Connected Wires 9. A
7.Not Connected Wires 10. C
8.SPST Toggle Switch
9.SPDT Toggle Switch TEST III. TRUE or
10.Electrical Panel FALSE
11. AC Voltage Source
1. FALSE
12.Junction Box 2. FALSE
13.Exhaust Fan 3. TRUE
4. TRUE
14.Distribution Box
5. TRUE
15.Electrical Switch box
General Instruction:
Given the necessary tools, materials and equipment, you are required to illustrate a
Electrical Layout plan for Electrical wiring and checking the lighting fixtures and
conduct testing in accordance with accepted institutional/industry standard for 25 –
30 minutes.
Specific Instruction:
1. The assessment shall be based on the unit of competency in the Training
Regulation and the evidence plan and shall focus on the following evidence
gathering methods:
2. You shall be given 30 minutes to prepare the needed materials, tools and
equipment for the performance of tasks.
3. You must be ensure that before taking the task given, you will have a safety
requirement to be safe in times of incident.
Note: In the remarks section, remarks may include for repair, for
replenishment, for reproduction, for maintenance etc.
Venue
Training Activity Facilities/Tools Date &
Trainee Remarks
and Equipment (Workstation/ Time
Area)
Prayer
Recap of Activities
All 8:00 AM to
Unfreezing Activities 5:00 PM Accomplish
trainees
Feedback of
Training
Rejoinder/Motivation
UC 1. PERFORM
ROUGHING-IN
ACTIVITIES,
Learning
WIRING AND
Resource
CABLING WORKS
Area
FOR SINGLE- Accomplish
PHASE
DISTRIBUTION,
POWER, LIGHTING
AND AUXILLIARY
Practical
SYSTEMS
Work area
L.O.1 Mario RMC/EMT ¾ Practical work
Install electrical Bucio and ½ 5m area Fugata,
metallic/non- Jeford long,PVC ½ 5m Manzano,
metallic (PVC Cagas long,hickey and Deblois and
conduit) Erwin hydraulic pipe Empasis
Cambel bender,hack were able to
Jhandie saw metallic accomplish
Cameros and PVC clamp, November the task
Chester working 2-8/19
Document No. GSC-EIM-
Electrical Installation And Date Developed:
001
Maintenance NCII November 04, 2019
Install wiring devices of Date Revised: Issued by:
floor and wall mounted Page No.
Developed by: GSC 54
outlets, lighting
fixtures/switches and Revision # 00
Gabby B.
auxiliary outlets
Illustrisimo
well.
gloves,safety 8:00am-
shoes,demo 12:00am Espinosa
board. lever
need to
bar,pull push
practice
rule,claw
more on
hammer,standar
Dancel how to
d and philips
install
screw
electrical
driver,lineman
metallic/
pliers,long nose
non-metallic
pliers,side
(PVC
cutting pliers.
conduit)
RMC/EMT ¾
and ½ 5m Fugata,
long,PVC ½ 5m
Manzano,
long,hickey and Deblois and
hydraulic pipe Empasis
Mario bender,hack were able to
Bucio saw metallic accomplish
Jeford and PVC clamp, November the task
working 2-8/19
L.O.2 Cagas well.
gloves,safety
Install wire ways Erwin
shoes,demo Practical work
and cable tray Cambel
board. lever area 1:00pm- Espinosa
Jhandie
bar,pull push 5:00pm need to
Cameros rule,claw practice
Chester hammer,standar
Dancel more on
d and philips how to
screw install wire
driver,lineman ways and
pliers,long nose cable tray
pliers,side
cutting pliers.
RMC/EMT ¾
and ½ 5m Fugata,
long,PVC ½ 5m Manzano,
long,hickey and Deblois and
hydraulic pipe Empasis
Mario bender,hack were able to
Bucio saw metallic accomplish
Jeford and PVC clamp, November the task
L.O.4 working 9-13/19
Cagas well.
Prepare for cable gloves,safety
Erwin
pulling and shoes,demo Practical work
Cambel
installation board. lever area 1:00pm- Espinosa
Jhandie 5:00pm
bar,pull push need to
Cameros rule,claw practice
Chester hammer,standar
Dancel more on
d and philips how to
screw Prepare for
driver,lineman cable
pliers,long nose pulling and
pliers,side installation.
cutting pliers.
RMC/EMT ¾
and ½ 5m Fugata,
long,PVC ½ 5m Manzano,
long,hickey and Deblois and
hydraulic pipe Empasis
Mario bender,hack were able to
Bucio saw metallic accomplish
Jeford and PVC clamp, November the task
working 14-20/19
L.O.6 Cagas well.
gloves,safety
Erwin
Notify completion shoes,demo Practical work
Cambel
of work board. lever area 1:00pm- Espinosa
Jhandie
bar,pull push 5:00pm need to
Cameros rule,claw practice
Chester hammer,standar
Dancel improving
d and philips their skills.
screw
driver,lineman
pliers,long nose
pliers,side
cutting pliers.
Fugata,
Manzano,
Deblois and
Mario Empasis
Bucio were able to
Jeford accomplish
Cagas November the task
L.O. 1 Plan and 21-25/19 well.
Erwin
prepare work Practical work
Cambel
area
Jhandie 8:00am-
Cameros Espinosa
12:00am need to
Chester
practice
Dancel
more on
how to Plan
and prepare
work.
RMC/EMT ¾
and ½ 5m Fugata,
long,PVC ½ 5m Manzano,
long,hickey and Deblois and
hydraulic pipe Empasis
bender,hack were able to
Mario
saw metallic accomplish
Bucio November
and PVC clamp, the task
Jeford 26-30/19 well.
working
Cagas
gloves,safety
L.O.3 Install lighting Erwin
shoes,demo Practical work
fixture and auxiliary Cambel 8:00am- Espinosa
board. lever area
outlet. Jhandie 12:00am need to
bar,pull push
Cameros rule,claw practice
Chester hammer,standar more on
Dancel d and philips how to
screw install
driver,lineman lighting
pliers,long nose fixture and
pliers,side auxiliary
cutting pliers. outlet.
UC 3. INSTALL Learning
WIRING DEVICES Resource
OF FLOOR AND Area
WALL MOUNTED
OUTLETS, Accomplish
LIGHTING
FIXTURE/SWITCHE
S AND Practical
AUXILLIARY Work area
OUTLETS
Computers,
CBLM, Chairs,
L.O. 1Select wiring
Tables, drawing
devices
plan,
diagram,wiring
board, working
gloves, safety Learning
Mario shoes, hard hat, Resource December Bucio,
Bucio lineman’s pliers, Area 2-8/19 Cagas and
Jeford long nose pliers, Cambel
Cagas side cutting were able to
pliers, level bar, 8:00am- accomplish
Erwin
pull push rule, 12:00am the task
Cambel
Jhandie claw hammer, well.
Cameros philips screw
Chester driver, and flat
screw driver, Cameros
Dancel and Dancel
ladder,portable
electric drill,heat Practical work need to
practice
gun,, and area
hydraulic pipe more on
bender, panel how to
board, circuit select
breaker: 60, 30, wiring
20 and 15 devices
amperes.
L.O.2 Install wiring Vergel RMC/EMT ¾
devices Deblois and ½ 5m
Document No. GSC-EIM-
Electrical Installation And Date Developed:
001
Maintenance NCII November 04, 2019
Install wiring devices of Date Revised: Issued by:
floor and wall mounted Page No.
Developed by: GSC 60
outlets, lighting
fixtures/switches and Revision # 00
Gabby B.
auxiliary outlets
Illustrisimo
long,PVC ½ 5m Fugata,
long,hickey and Manzano,
hydraulic pipe Deblois and
bender,hack Empasis
saw metallic were able to
Ramil and PVC clamp, accomplish
Empasis working December the task
Benedict gloves,safety 2-8/19 well.
Espinosa shoes,demo
Wendell board. lever
Fugata bar,pull push Practical Work 1:00pm- Espinosa
rule,claw Area 5:00pm need to
Joshua
Manzano hammer,standar practice
d and philips more on
screw how to
driver,lineman install wiring
pliers,long nose devices.
pliers,side
cutting pliers.
RMC/EMT ¾
and ½ 5m Fugata,
long,PVC ½ 5m Manzano,
long,hickey and Deblois and
hydraulic pipe Empasis
Mario bender,hack were able to
Bucio saw metallic accomplish
Jeford and PVC clamp, December the task
working 10-16/19 well.
Cagas
gloves,safety
L.O.3 Install Erwin
shoes,demo Practical Work
lighting Cambel
board. lever Area 8:00am- Espinosa
fixture/switches Jhandie
bar,pull push 12:00am need to
Cameros rule,claw practice
Chester hammer,standar
Dancel more on
d and philips how to
screw install
driver,lineman lighting
pliers,long nose fixture/
pliers,side switches.
cutting pliers.
10.Making
inventory Trainees X
Making inventory?
Remarks:
Used gloves x
x
Cellophane
TOTAL P122.00
The heat gun cannot be used for bending PVC Reported by: MARCO D. TECHS
pipes due to chord plug damage.
Signature:
GABBY B. ILLUSTRISIMO
Spare parts used : Chord plug
Findings: Recommendations :
The chord plug are damage Replacement of chord plug
Inspected by: Reported to:
Jomarie Alidog Glemel A. Baliling
Date: Date:
November 05,2019 November 06,2019
Subsequent Action Taken: Recommendation:
Inspection of the equipment Replacement of chord plug
By: Reported to:
Licensed Technician Andres P. Mejia
Date: November 8,2019 Date: November 8,2019